stage of construction 中文意思是什麼

stage of construction 解釋
建造步驟
  • stage : n 1 講臺;舞臺;戲院,劇場;〈the stage〉戲劇,戲劇藝術;戲劇文學;〈the stage〉戲劇業;劇壇。2 ...
  • of : OF =Old French 古法語。
  • construction : n 1 建築,結構,構造,架設,鋪設;建設;設計;工程;建築法,構造法,建築物;【戲劇】搭置,布景,...
  1. The required levels of construction cost estimates vary at different stages of project development , ranging from ball park figures in the early stage to fairly reliable figures for budget control prior to construction

    ?建築成本估算要求的精確程度在項目發展的不同階段發生著變化,從早期的相近數字到施工前預算控制時相當準確的是數字。
  2. On the basis of collecting and arranging a large amount of projects experience, conbined with construction diversion flood passing measures design and hydraulic model test of lihua hydraulic pawer station in 1995 and 1996, the dissertation studies the issues related with characteristics of concrete face rockfill dam including the selection of construction diversion flood passing standard and measures, flood passing during construction period and embankment stage, coffer dam design, construction scheme and general schedule etc. and present preference for project construction

    本文在搜集整理大量工程經驗的基礎上,結合蓮花水電站在1995年及1996年導流渡汛工程措施設計及水工模型試驗,對混凝土面板堆石壩的導流渡汛標準、導流方式及其選擇、施工期渡汛及壩體填築分期、圍堰設計以及施工方案及總進度等與混凝土面板堆石壩特點有關的問題進行研究,為工程建設提供一定的參考。
  3. Roll over protective structure ( rops ) is a device which installs on out of construction vehicle. the main functions are : when the vehicle rolling over. rops can prevent the vehicle from rolling over further, and reduce the possibility of rolling vehicle injures operator ; when the vehicle traveling on freezing soil. concrete and rock, it has large resist continuous impact ability ; when the vehicle overturning rops can support the whole vehicle. arrangement of falling object protective structure ( fops ) can block objects ( such as trees, rocks ) so that supply protection for operator. this problem is that research rolling over and falling objects protective structure of bulldozer by learning research condition of rops / fops and relative lay down international standard. on the base of theory analysis. detrudes counting formula of rops / fops deformation through founding mechanics analysis model of rops / fops at the stage of elasticity and plastoelastic. and finds a set of feasible nonlinear finite element analysis counting. lt calculates rops / fops plastoelastic deforma variable of 320hp bulldozer, bulldozer has been carried out by optimizing design method

    其主要功能是:當車輛滾翻時, rops能刺入未凍土壤而阻止車輛的進一步滾翻,降低滾翻的車輛對系著安全帶司機軋傷的可能性;保證rops在碰撞和沖擊變形不大的地面(如凍土、混疑土上、巖石)時,能具有相當大的抗連續沖擊能力;當車輛已經處于顛覆狀態時,已經變形的rops應能支撐住整車。落物保護裝置(簡稱fops ) ,其構件的布置方式要能遮蔽墜落的物體(如,樹木、巖石等) ,以便對司機提供適當的保護。本課題主要通過了解國內外有關對rops fops的研究情況和有關國際標準的制定,對大型推土機傾翻和落物保護裝置進行研究,在理論分析的基礎上,通過建立rops fops的力學分析模型,推導彈性、彈塑性階段rops fops變形的計算公式,建立一套可行的rops fops的非線性有限元分析計算方法。
  4. The center brace, also named guide pillar, serves a dual purpose, not only surpporting all the loads at stage of construction, but also transmitting upper loads down to the foundation, as a part of the column after the top down construction, its designing and construction are more strict

    中間支承柱又稱導柱,在逆作施工中起著雙重作用,既要支承逆作法施工中的各種荷載,又要在逆作法完工後,作為主體柱子的一部分,起著將上部荷載傳遞給基礎的作用,因而設計與施工均對其提出了較高的要求。
  5. On basis of the character of the structure at the stage of construction, the stress balanced method was developed to decided the forces of cables and the stresses of the arch rib sections, which is according to the normal stress controlling conditions on the top and bottom of arch rib section and considering the influence matrix

    針對這一受力特點,本文根據拱肋截面上、下緣應力平衡條件及影響矩陣的概念,發展了應力平衡法,用以確定拉索的合理索力,從而使拱助結構受力合理並具有理想的線形。
  6. Participate in installation, commissioning and putting - in - service proactively on the stage of construction and production preparation, to ensure all units start up smoothly

    在安裝施工和生產準備階段,積極參與現場儀表設備的安裝、調試、投用,確保裝置順利開車投產。
  7. On the one hand, the special preferential policies in the initial stage of construction of economic zones have gradually faded or been canceled with the rapid development of them and the enlarging of the gap between the special zones and the non - special zones ; on the other hand, the special economic zones still are engaged in the functions of " experiment fields " and " vanguards " in the process of the sustainable development and the construction of socialist market economy system

    一方面,經濟特區建立初期所實行的特殊優惠政策隨著特區經濟的快速發展以及特區與非特區之間差距的拉大而逐漸被淡化或取消;另一方面,經濟特區在中國建立社會主義市場經濟體制和實現可持續發展的過程中仍然要承擔起「試驗場」和「排頭兵」的作用。
  8. The new stage of construction of china ' s modernization

    中國現代化建設的新階段
  9. You ' d do better if you performed your tasks in a logical order and grouped them so that you did all of the tasks for each stage of construction at about the same time

    如果按邏輯次序執行任務並將其分組,從而能同時進行每個階段的所有任務,結果將非常理想。
  10. On the investment control at the constructing stage of construction project

    試論建設工程施工階段的投資控制
  11. There are some expounds on relevant progress control issue in our country and foreign country, but expounds on relevant progress control at the stage of construction are not systematic and comprehensive and their serviceability is not strong

    雖然國內外對有關進度的控制問題都有些論述,但是對施工階段進度控制的論述並不系統、不全面,而且可操作性不強。
  12. Similar stage of construction

    建造達類似階段
  13. A realization competition ( first stage of construction up go 2015 ) will focus on the development of a l0ng - term master plan for the airport, including a terminal extension, the construction of the new south pier and prospective planning for the north pier ; an urban development concept for the airport city ; and a traffic improvement scheme involving a reinterpretation and upgrading of the airport suburban railway station

    已經確認的競爭重點在於機場的長期主要的發展規劃,包括機場的擴建,新南部馬頭的建設和將來對北部馬頭的設計;對于機場城市來說的一個城市發展概念;和一個交通改進的規劃,它包括了從新的示意和升級機場的郊區地鐵站。
  14. A realization competition ( first stage of construction up go 2015 ) will focus on the development of a long - term master plan for the airport, including a terminal extension, the construction of the new south pier and prospective planning for the north pier ; an urban development concept for the airport city ; and a traffic improvement scheme involving a reinterpretation and upgrading of the airport suburban railway station

    已經確認的競爭重點在於機場的長期主要的發展規劃,包括機場的擴建,新南部馬頭的建設和將來對北部馬頭的設計;對于機場城市來說的一個城市發展概念;和一個交通改進的規劃,它包括了從新的示意和升級機場的郊區地鐵站。
  15. Compact management based on manipulation of cost engineering in the stage of construction project implementation

    建設項目實施階段工程造價控制的合同管理
  16. It is especially necessary for building construction businesses to take serious measures concerning the risk management at the stage of construction to ensure that building projects proceed smoothly

    為了工程項目順利進行,作為建築施工企業尤其有必要對施工過程認真地進行風險管理。
  17. This paper has value in instructing the project investor / manager in how to establish a risk management configuration and making decision under risk condition in the implement stage of construction project

    本文對指導工程項目的投資者管理者如何在項目實施階段建立一個風險管理體系並正確作出風險決策有一定的參考價值。
  18. Yesterday morning the first phase of the beijing guanting windfarm project ' s 33 large wind turbines entered the last stage of construction, the giant fans with a diameter of 70 metres began to be hung from their bases

    昨天上午,北京官廳風電場一期工程的33臺大風車進入最後施工階段,直徑70米的巨大風扇開始向基座上弔裝。
  19. The author also points out that constructing the operation data store ( ods for short ) for the enterprise is the core of the first stage of construction. the system can refine and integrate the sharing data by using ods

    並指出構建企業的操作數據存儲( ods )是系統第一階段建設的核心,依靠ods對企業中的共享數據進行提煉、整合。
  20. Then we also study the effect of string on the dynamical characteristic under the symmetric load and not under the symmetric load as the prestressing is the key making beam string structure the balanceatie system, having large rigidity and embodying the superiority of dynamical characteristic of this structure, this paper studies and conceives how to deteimine the number of the prestressing in each stage of construction and through comparing between the plan of onetime and repeated pulling construction choose the suitable pulling construction plan

    並且本文還研究了在對稱荷載和不對稱荷載兩種工況下,結構的受力性能隨豎向撐桿數目、結構垂跨比以及下弦索預應力等參數改變時的變化情況,總結出該結構受力方面的特徵,為實際工程設計提供依據。鑒于預應力是使張弦梁結構形成自平衡體系、具備較大剛度和體現結構性能優勢的關鍵,本文研究和探討了結構施工各階段該預應力大小的確定方法,通過一次張拉與二次張拉方案各項指標的比較,選擇適當的預應力張拉施工方案。
分享友人