time limit method 中文意思是什麼

time limit method 解釋
時限法
  • time : n 1 時,時間,時日,歲月。2 時候,時刻;期間;時節,季節;〈常pl 〉時期,年代,時代; 〈the time ...
  • limit : n. 1. 界限,界線;邊界。2. 極限,限度;限制。3. 〈pl. 〉范圍,范域。4. 限價;限額;賭注限額;獵物限額。vt. 1. 限制,限定。2. 減少。adj. -able
  • method : n 1 方法,方式;順序。2 (思想、言談上的)條理,規律,秩序。3 【生物學】分類法。4 〈M 〉【戲劇】...
  1. If the company issues unregistered corporate bonds, the counterfoils thereof shall state the total amount of the bonds, interest rate, time limit and method for repayment, issuance date and serial numbers of the bonds

    發行無記名公司債券的,應當在公司債券存根簿上載明債券總額、利率、償還期限和方式、發行日期及債券的編號。
  2. In this thesis, the traditional windage analytical method that comparing the actual cost with the planning cost can not control the implementary course of project, an effective project management and control technique which is very popular in nowadays is used for reference - - earned value method basing on performance analyzing, the main aim is to use the earned value exponential to analyze the fluctuant complexion of the time limit and cost for a project, and all the influences made by the fluctuant complexion, and the developing trend of the time limit and cost for a project

    本文提出了傳統的用實際發生成本與計劃成本進行比較,來衡量項目進展情況的偏差分析法不能全面地監控項目實施過程,借鑒了在目前項目管理實踐當中被普遍採用的一種有效的項目管理和控制技術:基於績效分析的掙值法,其根本目的是要使用該掙值指數分析項目工期和項目成本各自出現的變動情況、這些變動所造成的相互影響、項目工期與項目成本的未來發展趨勢。
  3. Following this principle, dpc adopted the method of " goal management ", i. e. disintegrating the three goals of investment, schedule and quality to different levels in accordance with different administrative levels to keep their consistency generally. moreover, dpc tried some effective new pattern such as in - phase management, strategic pass management and block management to shorten the time limit on the premise of ensuring the project quality. using some effective science way and modern management technology such as key line method to realize the reasonable resources allocation, including human resource, material resource and financial resource

    在這一理念的指導下,大連石化分公司運用了目標管理,將投資、進度、質量三大目標層層分解,並保證目標點的設置和時間段的劃分切實可行,方便合理;目標分解結構在較粗的層次上與組織分解結構一致,實現了組織結構設計與目標分解設計的配套;努力提高作為建設單位為各參建方的服務意識,注重與參建各方的有效溝通和相關單位的全方位協調;採用同步管理、關口管理和分塊管理等多種有效的新模式,在保證工程質量的前提下,趕工期,搶進度;用關鍵線路法、凈值法等有效的科學手段和現代管理技術來實現建設工程中資源的合理配置。
  4. By comparing the results of the living example, it analyzes the inconsequence of the old algorithm about the key line of the fiizzy network and verifies the rationality of the new method based on the new definition advanced. it offers a new means to calculate project time limit about indefinite item planning - management

    通過實例計算結果比較,分析了以前模糊網路關鍵路線演算法的不合理性,證實了本文提出的新的定義下模糊關鍵路線法的合理性,為非確定性項目計劃管理提出了新的工期計算方法。
  5. Should be in only 10 still have exceed the time limit in the day of method, sheet of your cancel after verification has exceeded 90 days

    只要在逾期10天之內還是有辦法的,你們的核銷單已經超過90天了
  6. The bridge rotation construction craft is the efficient method especially in the gorge, cliff, or arduous landform for its simple erection equipment, short time limit, safe construction

    橋梁轉體施工工藝是在深山峽谷、懸崖陡壁、地形險峻的橋位上架設橋梁的有效方法。架設設備簡單,工期短,施工安全方便,免去復雜的高空作業,質量可靠,投資省。
  7. And it also presents an example calculation of optimizing minimum cost time limit for fuzzy network to explain this new method

    給出了一個模糊網路最低成本日程優化的實例計算,通過實例計算說明了計算的新方法。
  8. This paper is about the study on the debugging and maintenance of substation automation system the author analyzes and compares the present debugging interface of microprocessor - based protection relays through summarizing the debugging and maintenance of routine substation automation system , indicates the advantage of software debugging interface based on the pc in allusion to the characteristics of the distributed substation automation system , the author presents the design idea of programming the debugging software for the intelligent devices , the monitoring station and the communication network based on the object - oriented programmable technology this method may simplify the workload of debugging and maintenance of substation automation system greatly , shorten the time limit for building and debugging of substation automation system and improve the security and the stability of system , therefore it is of great useful value

    作者通過歸納總結常規變電站自動化系統的調試方法和維護手段,分析比較了現有的微機保護調試界面,指出了基於pc機的軟體化調試界面的優越性。針對分層分散式變電站自動化系統的特點,提出了利用面向對象編程技術,編制間隔層智能裝置和變電站層監控系統及通訊網路層報文監視的智能化調試軟體的設計思想。該方法可大大簡化變電站自動化系統的調試和維護工作量,進一步縮短變電站自動化系統的安裝調試工期,提高系統運行的安全性與穩定性,具有很大的實用價值。
  9. At the same time, we brought forward a probability model of time limit for a project under the condition that it was n ' t definite according to the character of the mould project, and studied the method of calculating the indefinite critical route, and used this model to predict the rate of progress of a project

    同時,我們根據模具項目的特點給出了任務工期不確定性情況下的工期概率模型,研究了這種非確定型關鍵路線的計算方法,並並利用該模型對于項目完工的進度進行了預測。
  10. Method to solve the assignment problem with the shortest time limit and the least cost constraint

    最短時限最少耗費指派問題的一種解法
  11. Now there does not exist an exactly effective method that can always provide an optimal solution for np - hard problems within a reasonable time limit

    至今無嚴格有效的方法能保證在合理的計算時間內找出np難問題的最優解。
  12. A new method on cost - forecast and optimizing decision - making is built up, aiming at nonlinear problem of fire - electric power set capital construction time limit cost, based on gray system theory

    針對火電機組基建工期成本的非線性問題,基於灰色系統理論,提出了一種成本預測與優化決策的新方法。
  13. The conventional stack - preloading method which we use at present can not meet the requirement of stabilization, time limit of construction and the settlement after completion of works, so a new kind of technique is to be introduced to soft soil treatment

    高速公路的建設必須首先對這種地基進行處理。目前,常規堆載預壓法很難滿足施工穩定、工期和工后沉降的要求,必須採用新的技術措施進行處理。
  14. The article emphasizes some new methods in the fields of project item planning management. they are as followed : the technique method of indefinite network planning and optimizing, the forecasting and optimality method of indefinite item and nonlinear time limit for a project and cost, the fuzzy cluster analysis hereditary algorithm of network resource equilibrium planning, the vann forecast method of indefinite project item cost

    本文著重研究了工程項目計劃管理領域的非確定性網路計劃優化技術方法、非確定性項目非線性工期?總成本預測與優化決策方法、網路資源均衡計劃的模糊聚類分析遺傳演算法、非確定性工程項目造價的變結構神經網路預測方法,並進行了多個實證研究。
  15. Based on the security time limit theory, the calculation method for the consumption amount of the appointed time and some examples of reliability analysis were presented

    基於「安全期限理論」 ,提出了直升機使用期限消耗量的計算方法,並進行了實例的可靠性分析。
  16. Which often produces some unexpected problems, such as prolonging time limit of project, increasing engineering quantities and cost, etc. through test on the site, dynamic value analysis, finite element unit method, the paper researchs construction technology of in - situ pile, transfer theory, thickness of supporting layer of head slab and depth of pile in karst area, provides some important conclusions, directs effectively the design and construction of this kind of projects

    但因溶洞的分佈規律性差,現有勘探手段難於事先查明它的準確位置及大小,因而常常給施工帶來意想不到的問題:工期延長、工程量增加及工程費用增加等。本文通過現場試驗、理論計算和有限單元分析,對巖溶地區鉆孔灌注樁的施工工藝、荷載傳遞機理、持力層頂板厚度及嵌巖深度等方面進行了較為系統的研究,得出了一些重要結論,有效地指導了該類工程的設計和施工。
  17. It is domestic and international to research networks economies on the up the abroad scholars study more early, and study more completely with deep into research that it is economic to network that western scholar research " post industry society " and can think of considers most and early, afterwards of knowledge - based economy, arithmetic figure economy research then network economy starting point that study the chinese scholar is late start than then, but already there are large quantity scholars and commerce personage study with and pay attention to the network economy chinese and foreign scholar although cognition network economy, but profusion of different opinions, mostly is basic the network economy to equal the internet economy, its core is an electronic commerce, basic analysis method is a traditional limit method, but the less study the theories problem, problem of more little and in point of system of the network economy ; come in sight of the network economy to the challenge and break traditional economy theories, and less talk with the relationship the network economic theories and traditional economy theories ; ca n ' t answer the underneath some and important problem : why the phenomenon of increasing returns widespread meeting with network economy ? why the network economy trade expenses and the information dissymmetry at the same time in the decrease, and also can increase the bargain expenses and the information dissymmetry

    中外學者雖然對網路經濟的認識莫衷一是,眾說紛紜,但大都把網路經濟基本等同於網際網路經濟,其核心是電子商務,基本分析方法是傳統的邊際方法,而較少研究網路經濟的理論問題,更少論及網路經濟的制度問題;看到了網路經濟對傳統經濟理論的挑戰和突破,較少論及網路經濟理論與傳統經濟理論的繼承關系;不能回答下面的一些重要問題:為什麼網路經濟會普遍出現報酬遞增現象?為什麼網路經濟在減少交易費用和信息不對稱的同時,也會增加交易費用和信息不對稱?為什麼在網路經濟產生「直接經濟」的情況下,會出現專業化生產外包的現象?
  18. For verify the test theory, we used the numerical method the simulated the instrument heat exchanging. thus we checked the axial heat disturbing how to influence the test results, and checked the test time ’ s influence the test result, finding the time limit to avoid the natural convection influence

    運用數值方法模擬了測試儀器的實際傳熱過程,結果表明熱絲端部的軸向熱流在短時間內對測試的結果影響較小,採用雙熱絲可以有效避免端部效應。
  19. Time limit, place and method of performance

    履行期限地點和方式
  20. A comprehensive method for claim damages on time limit for a project network planning technology

    網路計劃技術工期索賠綜合分析方法
分享友人