top lift 中文意思是什麼

top lift 解釋
上層混凝土
  • top : n (opp bottom foot)1 頂,頂部,頂端。2 頭,頭頂;尖端;樹梢,樹頂;(事物的)上層部分。3 最高位...
  • lift : vt 1 舉起,使升起,提起,抬起;提高;提升。2 使高尚;鼓舞。3 運送,搬運;空運 ( = airlift) 4 ...
  1. Eyes almost as deep and speaking he had seen before, and cheeks perhaps as fair ; brows as arched, a chin and throat almost as shapely ; her mouth he had seen nothing to equal on the face of the earth. to a young man with the least fire in him that little upward lift in the middle of her red top lip was distracting, infatuating, maddening

    她的一雙眼睛和他過去看見的一樣,一直是那樣深沉,似乎能夠說話,她的面頰,也許還是像他從前見過的那樣美麗她的眉毛還是像從前見過的那樣彎彎如弓,她的下巴還是像從前見過的那樣稜角分明,她的脖頸也還是像從前見過的那樣端正然而她的那張嘴從前卻沒有見到過,不知道天底下有沒有能同它相比的。
  2. Zhangjiagang tonghua elevator part limited company is a member of chinese lift association, specialize in various kinds of lift fittings and escalator fittings mainly, for concerted effort, toshiba, modern fuji, witter, mitsubishi holding enterprise mainly at present - explain suchi more than 80 lift companies as the water chestnut, etc. and form a complete set ; still produce hydraulic pressure car handle products, products of car shed of top - grade aluminium alloy, textile aluminium fittings products and type key link products in addition

    張家港市通華電梯部件有限公司為中國電梯協會會員,主要專業生產各種電梯配件和扶梯配件,目前主要為通力、東芝、現代、富士、威特、三菱控股企業? ?申菱等八十多家電梯公司配套;另外還生產液壓車手檳產品、高檔鋁合金車棚產品、紡織鋁配件產品和型鋼產品。
  3. Use electrical lift on the feeding table. top of the board and feeder are maintain at the same level, easy for feeding

    送紙臺採用電動升降裝置,使紙板頂面與進紙口保持同一高度,便利於送紙。
  4. Under the regulations, a hose reel system is required for every 30 m ; fire hydrants must be installed at staircases where fire hoses can be pulled out for use ; firemen should be provided with easy access to the fire scene, such as a lift that reaches the top floors within one minute ; there should be designated floors in high - rise buildings for occupants to take refuge, for instance, the provision of one such refuge floor for every 20 floors or so, in order to curb the spread of fire

    根據規定,每30米須設有消防喉轆在梯間須有消防栓,可以拉出水喉應用亦須有地方讓消防員容易進入火場,例如可在1分鐘內到達頂樓的消防電梯高層大廈還須有避難層的設施,例如每二十多層便有一層避難層,令火勢不容易擴散。
  5. Hook the bottom of the earhook onto the lower hinge pin, then lift and pull the top of the earhook over the upper hinge pin

    將耳機掛鉤底部按在耳機下端的扣上,從下端按扣拉起並將掛鉤上端與耳機頂部扣緊。
  6. China grand theater has advanced push and pull lift mechanical stage and orchestra, which offers excellent assurance for the art treatment of performance ; the scientific and rational sound establishment and reinforcement system and top acoustics recording equipment let the high grade and high rank large - scale symphonic concert have best audiovisual effect. in addition, the luxury illmination in the hall, the 1500 luxury and cozy seats in the audience hall and big and small vip drawing rooms which can hold 100 people can all show the splendid and luxury style of china grand theater

    中國劇院具有較先進的推拉升降機械舞臺和樂池,為演出的藝術處理提供了良好保障;電腦控制的各類燈具使舞臺的藝術效果大放光彩;科學合理的建聲、擴聲系統和先進的音響錄音設備為舉辦高品位、高檔次的大型交響音樂會提供了最佳的視聽效果。劇院大廳吊裝的華麗燈飾、觀眾廳1500席美觀舒適的新型座椅、可容納100人的大小貴賓休息室等,無不顯示出中國劇院富麗堂皇的豪華氣派。
  7. But shortly after her family left , a gentle breeze suddenly came up and lift her right off the mountain top and took her across the valleys and to another mountain where it set her gently down

    她的家人剛離開不久,就突然刮來一陣輕柔的風,風兒裹著她飛離了山頂,越過了山谷,將她輕輕放在另一座山頂上。
  8. Based on the dynamic analysis of the three - dimensions finite element model of three - gorges ship lift structure, the equivalent reduced mechanical model is established. the comparisons beween the dynamic characteristics and seismic response of these two models demonstrate that the reduced mechanical model can be used in the research on the seismic whipping effect control in the top machinery building of the ship lift structure

    本文基於三維有限元模型的動力分析建立了等效的簡化力學模型。兩種模型的動力特性和地震反應表明,升船機頂部廠房地震鞭梢效應的磁流變智能自適應減震控制可以採用本文建立的簡化力學模型模型。
  9. Three - gorges ship lift structure is one of important navigation facilities in the three - gorges projects. as far as its scale for navigation, its lifted weight and height are concerned, the ship lift structure is the greatest one in the world. in this paper taking the ship lift structure as background, the principle of mr adaptive reduced vibration control system is proposed to solve the problem of seismic whipping effect of the top machinery building of ship lift structure

    三峽大壩升船機是三峽水利樞紐工程中重要的通航設施之一。就其通航規模、提升重量及高度而言,均屬國內外已建、在建升船機之首位。本文以該大型升船機為工程背景,對升船機頂部廠房地震鞭梢效應問題提出了磁流變智能自適應減震控制的原理、設計方法和效果分析。
  10. Generally ship lift structure is consisted of two or four huge reinforced concrete tube towers and a single - story machinery building on the top of tube towers. because the tube towers is demanded to support the large loads, the lateral stiffness of tube towers is a few hundred times as solid as that of the top machinery building and cause the sudden change of the stiffness. this change would cause insentive seismic whipping effect of the top building. the aseismic methods are difficultly used to reduce seismic responses of the top building of ship lift structure. the feasibility of develop an intelligent vibration control system is explored in the paper

    這樣,在塔柱頂部鋼筋混凝土平臺就會產生側移剛度的突變。這種巨大的剛度突變會引起升船機頂部廠房強烈的地震鞭梢效應,使得升船機頂部廠房地震反應的控制就成為升船結構抗震設計中的關鍵問題之一。由於採用常規的結構振動控制方法難以較好地解決升船機頂部廠房地震鞭梢效應,因此這就為智能振動控制技術的發展和應用提供了可能。
  11. The concept of the roof mr intelligent isolation system is presented in this paper, and this control system to the ship lift structure is applied to reduce the seismic whipping effect in the top machinery building. a modified bingham model is proposed to simulate the mechanical model of a controlled ship lift structure with roof mr isolation systems is established. consequently, the dynamic equation of the controlled structure system is obtained

    本文提出了屋蓋mr智能隔震系統的概念,並將該控制系統運用於對升船機頂部廠房地震鞭梢效應的智能控制。提出了mr阻尼器修正的bingham模型。通過實驗分析了mr阻尼器的力學性能。
  12. To lift up a heavy machine from an open top container with heavy crane truck

    用重吊車將機器從開頂櫃中吊出
  13. Lift entire top work clear of body

    將這個頂部提起,清洗閥體。
  14. Of shenzhen. it s located in bojin business centre of beihai city guangxi, beside the beautiful north - bay. you can stroll and roam in the business centre of beihai. the hotel is east to the leading multi - functional comprehensive sea - floor world of ocean park of the whole country, south to the well - known " peerless beach " silver sands west to the national forest park in guanshanling and north to the old street with modern buildings and the seafood s sand island - special seafood beverage district. the total area of construction is about 23000 square metre. allacoted intelligent administrative system realize water and electricity air conditioner, lift, safe precaution, fire control, communication, information and work intellectual modernization management system. there are the top - grade 192 guestrooms with all kinds of the whole broadband access with the professional commercial floors to serve the tourists and businessmen. incorporate commercial affair, recreation, food and beverage, amusing, shopping into an organic whole, offer high - efficient, comfortable, convenient, and safe environment for travellers amd businessmen and perfect humanization service to guests, the south country flavour fills in the air

    酒店東鄰全國首屈一指的多功能綜合性海洋公園海底世界,南接聞名遐邇的「天下第一灘」銀灘,西望冠頭嶺國家森林公園,北觸中西合壁的近代建築群珠海老街和北海著名的海鮮特色餐飲區外沙海鮮島。酒店總建築面積2 . 3萬平方米,整體建築雄健沉穩,氣勢拔雲,配備智慧化管理系統實現水電空調電梯安全防範消防通信資訊和辦公智慧現代化管理,擁有各類全寬頻接入的高檔客房192間套設有專業商務樓層悉心為商旅人士提供至尊商務服務,集商務休閑餐飲娛樂購物為一體,為賓客提供高效舒適便利安全的商旅環境和盡善盡美的人性化服務,彌漫南國時代氣息,實為各界人士商洽會議觀光休閑首選。
  15. All building plans are required to include a firemen s lift to carry firemen to the top floors within one minute. so, he meant that the lift could reach the top floors within one minute, not that people on top floors can be evacuated within one minute. there is a diversity of ways to facilitate the evacuation of the people affected

    剛才曾局長說需時1分鐘到達頂層,是指消防的規定建築物的圖則中須設有一個消防專用電梯,可在1分鐘時間內到達頂層,這是指電梯於1分鐘到達頂層,並不是指在1分鐘內疏散頂層上的人。
  16. And while new coach ottmar hitzfeld still retains hope his side can lift the bundesliga title, beckenbauer has already begun to analyse where things have gone wrong - with the loss of 30 - year - old ballack ranking top of his list

    當新帥希斯菲爾德依舊寄希望于奪得聯賽冠軍的時候,貝肯鮑爾已經開始分析失敗的原因失去了30歲的核心巴拉克。
  17. She ( was ) whisked up to the top floor in the lift

    她乘電梯迅速到達頂層
  18. Gently lift and pull the top of the earhook up and off the upper hinge pin. then pull it away to remove it

    輕輕抬起並拉起耳機掛鉤頂部,與耳機上端按鈕分離;取下耳機掛鉤。
分享友人