upstream section 中文意思是什麼

upstream section 解釋
上游段;上流段
  • upstream : adv. 向上游,溯流。adj. 1. 溯流而上的。2. (石油工業等)上游的,和石油的勘探、開采及輸送到起運港口有關的〈石油工業此後的提煉等過程則稱為下游(downstream)產業〉。
  • section : n 1 (外科、解剖的)切斷;切割;切開。2 【外科】切片,【金相】磨石。3 (果子的)瓣。4 【數學】截...
  1. The research fruits in this article can provide the temperature isoline map of crown cantilever section and central longitudinal section of the dam, the stress isoline map of crown cantilever section and upstream and downstream surfaces of the dam, the maximal and minimal stress distribution map in dam abutment along with the height of dam, the maximal and minimal stress table of typical nodes and the maximal and minimal stress table in different elevations, and also provide reference basis for taking relative temperature control measures in the design and construction of rcc arch dam

    本文研究成果可給出壩體的拱冠梁剖面和壩體中心縱剖面的溫度等值線圖、拱冠梁剖面和壩體上下游面應力等值線圖、壩肩最大最小應力沿壩高的分佈曲線、不同高程處典型點的最大最小應力值表以及不同高程處最大最小應力值表等成果,為碾壓混凝土拱壩的設計和施工中採取相應的溫控措施提供了參考依據。
  2. According to differences of construction process, boundary condition, temperature and stress of two schemes extending 3m deep short seam on upstream face in the middle of rcc overflow section and no short seam are calculated, what " s more, in this paper the equivalent line drawing of stable temperature field and unstable temperature field during construction and operation period and the duration curve drawing of typical points " s temperature and stress are plotted, and the results of peak and minimum on temperature in every month and maximum on tensile stress are attained

    根據施工過程和邊界條件,對溢流壩段中間上游面增設3m深短縫和不設短縫兩個方案進行了溫度和應力計算,並繪制出穩定溫度場等值線圖及施工期、運行期非穩定溫度場等值線圖,典型點溫度和應力歷時曲線圖,逐月最高、最低溫度和最大拉應力及相應位置等成果。
  3. Many geological and hydrological factors of the river section, where the yellow river water intake engineering is laid out, such as the capacity of the reservoirs along the river section upstream and downstream, the rate of the flow discharge, the erosion and silt of the watercourse, the form of the riverbed and the water current, ice tuck, the convergence of the upstream branches of the river section, flood crest, sand crest size, the capacity for flood discharge of the watercourse, the effect of flood control structure around and the impacts on surrounding environment and the third person " s legitimate rights and interests, should be considered

    黃河取水工程的布設要考慮工程所處河段的地質水文等諸多因素。如該河段上下游水庫的庫容,泄水流量、河道沖刷、淤積、河床形態、水流形態、冰塞、河段上游的支流匯入、洪峰、沙峰的大小、河道行洪能力的大小、周圍防洪工程的影響及對周圍環境和第三人合法權益的影響等等。
  4. The old lo wu railway bridge and the lo wu old pedestrian bridge formed a serious bottleneck for flood flows. upon completion of the bridge work and improvement of the river section at lo wu in early 2004, the bottleneck at lo wu will be removed and the flooding risk upstream of lo wu can be reduced in time for the 2004 wet season

    他指出,現有的羅湖鐵路橋和羅湖舊行人橋形成嚴重的瓶頸地帶,這兩條橋的重建工程以及羅湖河段的改善工程於二四年年初完成後,羅湖的瓶頸地帶將會消失,而羅湖上游在二四年雨季的水浸風險亦將會減少。
  5. Our site inspection near shek mum kap at the midstream section of the tung chung stream on 14 august 2006 revealed significant sediment runoff from upstream water. virtually no fish and insects were observed in the stream

    本會於2006年8月14日在鄰近東涌河中游段的石門甲進行實地考察時,發現大量沉積物從上游沖刷而下,本會職員更幾乎未能在該河段中找到魚類和昆蟲。
  6. Analysis of caculation results demonstrates that x of temperature stress and ensembled stress on upstream face of dam section will reduce after 3m deep short seam is extended on upstream face in the middle of dam section, however y and z do n ' t vary

    計算成果分析表明:在壩段中間上游面設3m深短縫后,壩段上游面溫度應力、綜合應力x減小,而y 、 z變化不大。
  7. 4, it has shown, through the study on the temperature modeling of ertan reservoir, that the location of upstream boundary can not be placed on the section with a great temperature gradient in vertical, because the water temperature distribution at upstream boundary can control the temperature structure in reservoir

    4 .在二灘水庫水溫模擬研究的基礎上對入口邊界的設定作了初步的研究,認為入口邊界不適宜選擇垂向溫度梯度較大的斷面。這是因為入口水溫垂向分佈基本控制了庫區水溫的分層狀況,而且入口邊界的速度和溫度條件的不匹配會導致較大的誤差。
  8. Any proposed diversion within wkcd should tie in with the diversion to be provided by kcrc at the upstream section ( single cell ) of the same culvert. proponents should liaise with kcrc in this regard

    如建議把西九龍文娛藝術區內的暗渠改道,須配合九廣鐵路公司日後就同一暗渠的上游段(單管)進行的改道。
  9. This research attempts to study career strategces used by labors worked in petrochemical industry and to compare each construct among labors of upstream, middle and downstream section

    研究結果顯示,各層勞工對特定生涯策略有其偏好,上游勞工比下游勞工較常采努力投入,而下游勞工則比中游勞工較常尋求生涯指導。
分享友人