vertical check 中文意思是什麼

vertical check 解釋
垂直檢驗
  • vertical : adj 1 垂直的,直立的,豎立的,縱的( opp horizontal )。2 頂上的,頂點的,絕頂的。3 【解剖學】頭...
  • check : n 1 (象棋)將軍( ),被將軍的局面。2 (突然的)妨礙[制止,阻止];停頓,挫折;【打獵】(獵狗聞不...
  1. Nibco iron body check valves may be installed in both horizontal and vertical lines with upward flow

    美國尼伯科止回閥可以安裝在水平位置,或流向朝上的垂直位置。
  2. Nibco iron body check valves may be installed in both horizontal and vertical lines with upward flow or in any intermediate position

    尼伯科鑄鐵閥體止回閥可以安裝在水平管線或流向朝上的垂直管線中的任何位置上。
  3. Horizontal and vertical parity check code

    二維奇偶驗碼
  4. Energy consume, electric strength, insulation resistance, ground conductivity, leakage current, microwave leakage, power input, normal temperature, humidity treatment, glow wire, horizontal flame, vertical flame, tracking, ball pressure, rainproof, water splash, dustproof, salt fog, endurance, motor load test, cord flexing, cord pulling, pull & torque test, lamp replacement, construction check etc

    能耗、電氣強度、絕緣電阻、接地連續性、泄漏電流、微波泄漏、功率、溫升、濕熱試驗、灼熱絲、水平燃燒、垂直燃燒、漏電起痕、球壓試驗、防雨淋、防濺水、粉塵、鹽霧、耐久性(壽命)試驗、電機負載試驗、電源線彎折、電源線提拉、拉扭力測試、燈頭互換性、安全結構檢查等。
  5. During vertical migration, the copepod is assumed to instantaneously check the variations of the environmental parameters and can thereby make the optimal behavioral strategy to maximize the value of venturous revenue, i. e., taking up as much food as possible at as less cost of mortality as possible

    在垂直遷移的過程中,我們假設橈足類個體能夠即時識別環境參數的變化從而採取最優的行為策略以獲取風險收益的最大值,即以盡可能小的死亡代價獲取盡可能多的食物。
  6. 7. to display vertical lines between unit labels, select the tick lines check boxes

    7 。如果要在單位標簽之間顯示垂直線,則應選中「時間刻度線」復選框。
  7. Twin disc check valves can be installed horizontally or in the vertical position with flow up

    雙閥瓣止回閥可以安裝在水平位置,或流向朝上的垂直位置。
  8. Note : twin disc check valves can be installed horizontally or in the vertical position with flow up

    注意:雙閥瓣止回閥能夠安裝在水平或流向朝上的垂直位置。
  9. Vertical parity check

    垂直配類核對
  10. In this paper, a bogused vortex with tilted vertical structure is firstly taken into account. check results of experiment b, experiment bt and experiment nb, we find that the simulated tc track, center pressure and pattern of precipitation during landing in experiment b are better than others. so, a bogused vortex with asymmetrical horizontal structure and tilted vertical structure is good for a tc moving in mid - latitude, which may be a new way to initialize this kind of tc in numerical simulation

    本文首次採用傾斜垂直結構的人造熱帶氣旋作為初始渦旋,試驗b和試驗bt以及試驗nb的模擬結果對比發現,前者對9806號熱帶氣旋登陸前後的運動路徑、中心氣壓、降水分佈和初始結構的模擬能力優於後兩者,因此,具有傾斜垂直結構的人造熱帶氣旋比正壓結構的人造熱帶氣旋更適合於作為模擬中緯度運動的熱帶氣旋的初始渦旋,從而提出解決該類熱帶氣旋初始化問題的一種新思路。
  11. Based on the conclusion to the above, this article raises some new methods and fresh opinions for gtdw about the quality control and check which has been verified in practice. gtdw is a new practical tech for vertical anti - seepage

    本文在對西安理工大學工程碩士專業學位論文此總結的基礎上,提出了適應于抓鬥薄墻技術質量控制和檢測的一些新方法和新觀點,並在實踐中得到驗證。
  12. An experimental apparatus of falling film absorption in a vacillating is set up to check the reliability of theoretical model and to have a deep understanding of heat and transfer of practical falling film absorption ; falling film absorption with tfe / nmp solution in a static vertical tube and that in a vacillating tube are investigated respectively

    為驗證理論模型的可靠性並進一步深入了解實際搖擺降膜吸收過程中熱、質傳遞規律,自建了搖擺振動單管吸收試驗臺;分別對靜止和搖擺狀態下tfe / nmp垂直管內降膜吸收進行實驗研究。
  13. This paper discussed the total process of fabrication for big diameter vertical heat exchanger, including mostly tubesheet machining, technics request of tubesheet piecing - up, and weld request of tubesheet - to - shell ; measure of machining for square manhole and measure of square manhole - to - shell weld for preventing distortion ; taking special machining technics arid check up method for request of plane degree and check up method upon tubesheet

    摘要介紹了大直徑立式換熱器的製造過程,主要包括管板拼接、加工的工藝要求以及管板與筒體焊接要求;同時對方形人孔的製作及其與筒體的焊接防變形等採取了一定的措施,對管板上端面平面度的要求採取了特殊的加工工藝及檢驗方法。
  14. Vertical lift check valve

    升降立式止回閥
  15. Vertical lift check valves

    立式止回閥
  16. Cross - check the main roof truss roof installation quality of the surface is not perpendicular to the vertical center two blocks ; roof surface pressure chord of the roof truss vertical bending side, we must ensure that such errors do not exceed the allowable deviation to ensure roof stability and comply with the design requirements of the state by force

    屋架安裝質量主要檢查屋架跨中對兩支座中心豎向面的不垂直度;屋架受壓弦桿對屋架豎向面的側面彎曲,必須保證上述偏差不超過允許偏差,以保證屋架符合設計受力狀態及整體穩定要求
  17. Tilting disc check valves are used to prevent reversal of flow in horizontal or vertical pipe lines

    翻轉式閥瓣止回閥適用於防止水平或垂直管路上的流體倒流。
  18. Most crane swing check valves can be installed in horizontal or vertical, upward flow, piping

    大多數美國克雷恩旋啟式止回閥可以安裝在水平或垂直(流向朝上)的管路上。
  19. Nibco check valves may be installed in both horizontal and vertical lines with upward flow or in any intermediate position

    美國尼伯科止回閥可以安裝在水平和流向朝上的垂直管道中的任何位置上。
  20. Nibco check valves may be installed in both horizontal and vertical lines with upward flow or in any ntermediate position

    沃爾達止回閥可以安裝在水平管道和流向朝上的垂直管道上的任何中間位置上
分享友人