water curb 中文意思是什麼

water curb 解釋
井筒集水槽
  • water : n 1 水;雨水;露;〈常作 pl 〉 礦泉,溫泉;藥水。2 〈常 pl 〉水體;水域;水道;海;湖;河;海域;...
  • curb : n 1 勒馬繩,馬銜索。2 限制,抑制,拘束;制止。3 (生於後足使馬成瘸腳的)硬瘤。4 (人行道的)鑲邊...
  1. Rock - tests for physical properties of rock - part 2 : determination of density - cutting curb - water immersion methods

    巖石.巖石物理特性試驗.第2部分:密度測定.切削邊飾.水浸法
  2. These bills are guaranteed to curb your appetite if used directed, take two before each meal with a glass of water and a double of cheeseburger

    "如果你按照(我的)指示來服用這些藥,你的食慾保證能被治好.每頓飯前吃2顆,用一杯白開水和兩份夾乾酪和碎牛肉的三明治服下.
  3. These pills are guaranteed to curb your appetite if used as directed. take two before each meal with a glass of water and a double cheeseburger

    如果你能按照說明服用,就是飯前兩片,用一杯水和雙層漢堡送服,這樣就能控制你的食慾了
  4. Soils investigation and testing. determination of density of fine soils. cutting curb, mould and water immersion methods

    土壤.調查與試驗.實驗細土密度測定.切樣法模具法浸水法
  5. After the investigation and study of this extruded concrete curb solution overseas, shaanxi provincial bureau of water & electric engineering ( group ) co., ltd. ( spb ) devoted to the research of this new construction method, invented bjy - 40 extrusion curb placing machine, made comprehensive experiments on heihe dam site, and got valuable results, adopted this method in gongboxia hpp main dam construction

    在對國外邊墻施工法進行細致調研后,從2001年開始,陜工局率先對這一技術進行研究,研製了bjy - 40型邊墻擠壓機,在黑河工地進行了現場擠壓混凝土邊墻和墊層料鋪填碾壓的綜合試驗,取得了具有參考價值的第一手資料,並在公伯峽水電站面板壩工程中創新採用了這一技術。
  6. By adopting the three - dimensional nonlinear finite element program, using drucker e - b model, demonstrating the actual construction progress and water impounding of gongboxia hpp main dam, comparing the two schemes of the existence and nonexistence of extruded concrete curb, made three - dimension simulation calculation, the result proved that while the existence of extruded concrete curb between face slab and rockfill, the deformation and stress of face slab are better than that while the nonexistence of extruded concrete curb

    採用三維非線性有限元計算程序,使用鄧肯e b模型,模擬公伯峽面板壩的實際施工進度、蓄水過程,對比有無擠壓邊墻兩種方案,進行三維模擬計算。結果表明,面板與堆石體之間有擠壓邊墻時,其面板的變形及應力值均小於無擠壓邊墻的相應結果。
  7. Water waste and pollution in china and methods to curb

    我國水資源浪費和污染的現狀及治理
分享友人