water power engineering 中文意思是什麼

water power engineering 解釋
水電工程
  • water : n 1 水;雨水;露;〈常作 pl 〉 礦泉,溫泉;藥水。2 〈常 pl 〉水體;水域;水道;海;湖;河;海域;...
  • power : n 1 力,力量;能力;體力,精力;(生理)機能;〈常 pl 〉才能。2 勢力,權力,權限;威力;政權;權...
  • engineering : n. 1. 工程(技術),工程學。2. 開車技術。3. 土木工程,工事。4. 操縱,管理。
  1. After long - term synthetic action of these factors, the complicated rock mass in the right dam foundation come into being. the adjoining rock engineering geological classification of water - conservancy and hydraulic - power project reconnaissance code ( gb50287 - 99 ), geomechanic system ( bieniawski, 1973 ), rock mass quality index z ( xiaowang, 1995 ), artificial neural network and field classification were used in the rock mass quality classification

    本文採用水利水電工程地質勘察規范( gb50287 - 99 )的圍巖工程地質分類、巖體rmr分類( bieniawski , 1973 ) 、巖體質量指數z分級(小灣, 1995 )以及人工神經網路分類,對壩區巖體按其基本指標作出定量化評分、分級。
  2. The main production includes heat - pipe, heat - pipe exchanger setting, rubber tyre hot water deaerate power station, boiler deaerator, tyre forming machine, rubber cutting machine, vulcanize, vulcanizing pot and the special carbon steel or stainless steel pot for oil, chemical engineering, medicine, chemical fertilizer field use

    濟南仙峰泰山化工設備有限公司主要生產熱管、熱管換熱器、橡膠輪胎廠子午胎斜交胎熱水除氧動力站、鍋爐除氧器、輪胎成型機、切膠機、硫化機、硫化罐,還有石油、化工、化肥、醫藥、冶金、建材等行業使用的各種碳鋼、不銹鋼、有色金屬的塔、罐、釜、換熱器等產品。
  3. Based upon the present regulation, the design and construction check and structure strength check, the electric power generation water inlet anchor gate crane platform ' s hydro - engineering structure of fushui power plant were conducted and an analysis for the reasons of building structure fracture was carried out

    摘要進行了富水電廠發電進水口閘門啟閉機平臺安全檢測,依據現行規?對其建築物進行了設計與施工復核、結構的強度復核和建築物的裂縫成因分析。
  4. As a result, it is widely used in many fields such as mining industry, forest industry, dock, ferry, bridgework, water and power engineering

    因而,它被廣泛應用於采礦工業、森林工業、碼頭、渡口以及橋梁、水電建築工程的起重和施工作業中。
  5. It is widely in sectors of petroleum, chemical engineering, power, printing and dyeing textile for heating and steaming system, condensation water recycling and over heating steam projects

    該閥廣泛用於石油、化工、電力、紡織印染、等行業的各種蒸汽加熱設備,蒸汽管網、凝汽管網、凝結水回收工程和低過熱蒸汽工程。
  6. Ground compaction job is a important foundational project of earthwork construction water power engineering civil engineering and city planning engineering etc. good compaction can evidently improve ground ' s carrying capacity and stability and can reduce or remove the subside of the base, so that every project in using have a very steady base

    基礎壓實作業是土工建築、水工建築、道路工程、市政工程等建設中一項非常重要的基礎性工程。基礎經過良好的壓實,能夠顯著改善其承載能力和穩定性,降低甚至消除地基的沉降,從而使各項工程在其使用期間有非常穩固的基礎。
  7. The optimal layout scheme and design scale of the plant site are determined through the analysis and evaluation of the capacity of flood control and flood discharge of the watercourse nearby the pump house of zhongning electric power plant. this will provide use for reference for the similar water - intake engineering in the future. it has great significance for theoretical research and practicable value for application as well

    本課題通過對中寧發電廠取水泵房廠址附近河道的防洪及河道行洪能力的分析和評價來確定其廠址的最優布設方案和設計規模,對今後類似的黃河上取水泵房的設計提供借鑒,因此具有重要理論研究意義和實際應用價值。
  8. In foreign trade field, company focuses on the international engineering contract, project bidding, complete device exporting and other fields such as metallurgical machinery, mine machinery, universal machinery, light industrial machinery, hardware tools, foods machinery, steel structure workshop, water power station water power generator set, traffic, energy sources, communication, building materials, household apparatus and textile

    對外貿易以國際工程承包項目招標成套設備出口及冶金機械礦山機械通用機械輕工機械五金機械食品機械鋼結構廠房水力發電站水電機組火力發電站火電機組交通運輸能源通訊建築材料家用電器紡織品等領域為主。
  9. Design and installation of wastewater pumps and non - clogged pumps, design and manufacture of aerator, decanter and water - power propeller, design of environment protection engineering, evaluation of environmental affection, consultation of iso14000

    污水泵、無堵塞泵的設計和安裝;曝氣機、潷水器、水力推進器的設計製造;環保工程設計;環境影響評價; iso14000的咨詢等。
  10. On the basis of anatomizing the condition of hydrogeology with zhongliang water resources and power engineering, combined with the data analysis of flux with surface water, aquatic chemistry, and experiment of tracing, the condition of karst leakage in the region of reservoir is educed. the concept of reservoir leakage with these information is put forward, the leakage quantity of karst water in the region of reservoir with the method of water equilibrium is applied

    在仔細分析中梁水利水電工程庫區水文地質條件的基礎上,結合地表水測流資料、水化學分析資料及示蹤連通試驗資料,得出水庫區巖溶滲漏條件,並在此基礎上提出水庫滲漏概念模型,採用水均衡法計算出庫區的巖溶水滲漏量。
  11. Considering the seepage of linear and the seepage of non - linear in the karst area are always coexisting, the model of linear seepage and non - linear seepage is put forward firstly on the basis of domain decomposition method. the movement of groundwater in an ideal model is simulated with this method, and the program of dar - nondar. for is compiled. then these results are applied to zhongliang water resources and power engineering, the leakage quantity of karst water is calculated

    考慮到巖溶區滲流往往都是線性流與非線性流並存,首次提出了基於區域分解法理論的線性?非線性滲流模型,利用該方法模擬出理想模型中的水流運動,並編制了計算程序dar - nondar . for ,然後將該成果應用於中梁水利水電工程中,預測出庫區巖溶水滲漏量。
  12. This article introduced the method of geological investigation of nanling tunnel karst disease, elaborated the tunnel engineering geology conditions, especially the karst water, the karst water power channel and the harm of karst water, and analyzed the cause that produced the karst disease

    摘要南嶺隧道巖溶地下水活動造成地表坍陷、洞內泥砂淤塞等病害,其原因在於隧道施工遺留的導洞長期疏排巖溶水,採用地質測繪、物探、鉆探、水文地質試驗等綜合勘察方法,查明地下水通道位置、地下水流速、流向,針對病害原因,提出攔截、封團、疏排、填充等綜合整治方案。
  13. A former manager of an hydro water power engineering company was sentenced to three months imprisonment, suspended for 12 months, and fined 3, 000 for using false invoices to deceive 30, 000 from the company

    一名水力發電工程公司前經理,使用偽造發票向公司騙取三萬元,被判入獄三個月,緩刑十二個月,及罰款三千元。
  14. Abstract : xiao wan hydroelectric installation locate in the boundary between nanjian county and fengqing county of the western of yunnan province. the height of dam is 292 m, and its installed capacity is 4, 200, 000 kilowatt, so it ' s a large - scale water - power engineering. the height of excavation reach to 80 m. so it is sure, that the excavation will influence on the stability of the slop. the stability of the slop is the necessary condition to assure the trouble - free operation of the station

    雲南省瀾滄江小灣水電站位於雲南省南澗縣和風慶縣的交界處,最大擬建壩高292m ,裝機容量420萬千瓦,屬特大型水電工程。左岸砂石系統邊坡位於瀾滄江左岸8 ~ #山樑,主體開挖高度達80m ,開挖對邊坡的穩定性產生很大的影響。該邊坡的穩定性對水電工程建設的順利進行。
  15. Our company has the year produces 30, 000, 000 sets of solar energies water - heater rubber, plastics accessories and car, motorcycle, water power, chemical engineering, machine electricity, liquids press, the splirit moves, road, cure to use, electronics, spin and weave, the production ability between food, daliy necessity and each profession a rubber, plasitcs for needing special specification accessories

    本公司具有年產30 , 000 , 000套太陽能熱水器橡膠、塑料配件以及汽車、摩托車、水力、化工、機電、液壓、氣動、道路、醫用、電子、紡織、食品、日用品以及各行業所需特殊規格的橡膠塑料配件的生產能力。
  16. Preventing hydro - structure from cracks has been a key problem in design and construction of water power engineering

    由於水工建築物裂縫大都屬于溫度裂縫,溫控防裂成為解決問題的關鍵。
  17. During the last few years, the buried structures have been widely used in water power engineering, transportation engineering, urban construction, military and people ' s air defense project, the aseismic design and performance evaluation of buried structures have become a more and more important subject to engineers

    近些年來,地下結構在水利水電、交通運輸、市政建設、軍事和人防工程中得到了廣泛的應用。隨著地下結構建設規模的不斷擴大,地下結構的抗震設計及其安全性評價越來越成為工程界所關心的重要課題。
  18. As a experimental unit, beijing guodian water resources & electric power engineering co., ltd ( hereafter short for " bwe " ) reformed from beijing hydraulic investigation and design institute. it is primarily engaged in investigation and design of water power stations and hydraulic projects

    北京國電水利電力工程有限公司(以下簡稱北京國電公司)作為行業試點單位,是原國家電力公司北京勘測設計研究院深化體制改革而組建的國有控股公司,主營業務為水利水電工程勘察設計。
  19. In the end, according to features of water - power engineering, this paper formulate the contents and model about ex - post evaluation of water - power engineering

    在文章最後,根據水電工程的特點和以上研究結果,給出了水電工程后評價報告的內容和格式,以供實踐工作參考。
  20. To ensure the stability and reliable, we apply iso9000 manage system in every step of manufacturing and engineering. our products are widely used in oil, water, power, railway, heat system, transportation, factory automation, army, wireless meter. ect

    在此協議中, adi公司負責ic的開發設計生產和市場推廣安美通公司作為adi的第三方approved design house ,負責ic客戶維護, ic運用產品的開發設計。
分享友人