water-filling method 中文意思是什麼

water-filling method 解釋
水充盈法
  • water : n 1 水;雨水;露;〈常作 pl 〉 礦泉,溫泉;藥水。2 〈常 pl 〉水體;水域;水道;海;湖;河;海域;...
  • filling : n. 1. 裝滿,填裝;填補。2. 填料;填土。3. (糕點內的)餡。4. (織品的)緯紗,漿料。
  • method : n 1 方法,方式;順序。2 (思想、言談上的)條理,規律,秩序。3 【生物學】分類法。4 〈M 〉【戲劇】...
  1. Cementitious capillary crystalline waterproofing coating ( abbreviated ccwc ) is a new type of cement - based waterproofing materials, which is characterized by its very good adhesive performance and impermeability to water, self - rehabilitating ability, permanent waterproofing effect, good aging resistance and corrosion resistance, simple construction method and harmless to hunman etc. ccwc consists of ordinary portland cement, quartz sand and reactive substances and other supplementary ingredients, whose reactive substance can permeate into the internal part of concrete structures through water and produce insoluble crystals filling capillary pores or crack of the concret through reaction with cement hydrates and unhydrates

    水泥基滲透結晶型防水材料是以硅酸鹽水泥或普通硅酸鹽水泥、石英砂等為基材,摻入活性化學物質而組成的一種新型防水材料。摻入的活性化學物質以水作載體向混凝土內部滲透,與混凝土中未水化的水泥及部分水泥水化產物發生結晶反應,生成不溶於水的結晶體,堵塞毛細孔道,使混凝土緻密、防水。這種防水材料具有粘結力強、抗滲性能好、自愈合能力強、防水效果持久、耐老化、耐腐蝕、易施工、對人類無害等特點。
  2. In which, it gives inquiring of the construction of deep - water foundations and the usage of floating crane. the construction program of bridge pier foundation will be fixed according to the water depth. if the water depth is less than 4m, pier foundation will adopt the method of building island by earth filling ; if the water depth is more than 4m and there is over burden at river bed, at the same time, it has sufficient bearing capacity to load steel pipe pile, the steel pipe pile platform will be adopted

    其中,對深水基礎的施工及浮吊的使用進行了探討,根據水深確定橋墩基礎的施工方法,對水深不超過四米的橋墩基礎,採用填土築島的方法:對水深大於四米,河床有覆蓋層,且能保證鋼管樁具有足夠的承載力的橋墩,採用鋼管樁平臺;對主河道上河床沒有覆蓋層,鋼管樁無法插打的橋墩,採用浮式平臺。
  3. Over traditional methods used in this region, method of sand bedding pre - elevating and step water - filling pre - compressing has advantages in shorting construction period, simplifying construction. furthermore, this method solves the difficulty induced by constructing at rain season

    與本地區傳統的施工方法相比,砂墊層預抬高分級充水預壓法不僅工期短、施工方法簡便,而且克服了雨季施工的困難。
  4. Based on comparison of several technical schemes, the method of sand bedding pre - elevating and step water - filling pre - compressing is adopted. so the dissertation is consist of two parts : ( 1 ) the applicability study for the method of sand bedding pre - elevating and step water - filling pre - compressing, including numerical analyses for the thickness of sand bedding, the consolidation, settlement and stability of foundation, drainage, possibility of foundation liquefaction under seismic loading, et al. ( 2 ) monitoring at construction stage and checking the effect of foundation treatment, including the measurements of the settlement velocity and non - uniform settlement of ring beam under the tank, pore pressures and horizontal displacements in foundation, the pressure distribution at the bottom of oil tank and the strength increase of soils

    通過多種技術方案比較,最終選擇了技術先進的砂墊層預抬高分級充水預壓法,論文工作主要由以下兩部分組成: ( 1 )砂墊層預抬高分級充水預壓法的適用性研究,其中包括砂墊層厚度、地基沉降與固結度、地基穩定性、降水、地震作用下砂土液化的可能性等方面的計算分析; ( 2 )施工監測與地基處理效果檢驗,其中包括油罐環梁基礎沉降速率與不均勻沉降程度、各分級充水加載階段地基超靜孔壓與深層水平位移、油罐底板壓力分佈及地基土強度增長等方面的實測與數據分析。
  5. An oil tank ' s foundation was consolidated by water filling preloading method

    摘要採用油罐充水預壓的方法加固某油罐地基。
分享友人