works schedule 中文意思是什麼

works schedule 解釋
工程時間表;施工時間表
  • works : 的印表機描述格式
  • schedule : n 1 目錄。2 表(格);清單,明細表。3 〈美國〉程序表,計劃表;進度表;時間表。4 〈美國〉預定日期...
  1. The crew works an irregular schedule on the sub and sometimes getting a meal is difficult, burroughs said. so having the fruitcake on board is helpful

    巴羅斯介紹說,艇上人員的工作安排極不規律,有時想吃上一頓飯都是很困難的。
  2. Concern the provision of audit work station according to accounting method, if an accounting clerk manages debt already, provide check again, apparent and easy cheat, should give so prohibit ; the accountant record of an unit is custodial, it is the accountant such as budget of forms for reporting statistics of book of zhang of all sorts of prooves that point to this pair of units, accountant, accountant, financial plan, unit and important contract data, after be being collected regularly, examine a nucleus to be opposite, arrange stand roll, schedule, bound into book custodial, if allow a person to manage the debt of an unit already, keep again accountant record, made motion easily on debt apparently later the action that the opportunity of record of recycle government accountant covers him, give so prohibit : the registering job of items of an account of debt of the income of an unit, defray, charge, creditor ' s rights, the much that includes station of work of charge to an account but not be all ( for instance cash journal and bank come - and - go journal are not included ), this part charge to an account works, it is the foundation of business accounting of an unit accountant, also be the basis that produces cash come - and - go, also cannot hold part - time by cashier personnel, a person manages debt already, manage charge to an account again the basis that this produces debt come - and - go, very easy defalcate

    根據會計法有關稽核工作崗位的規定,假如一個會計工作人員既管錢款,又管復核,顯然輕易作假,所以要予以禁止;一個單位的會計檔案保管,是指對本單位的各種憑證、會計賬簿、會計報表、財務計劃、單位預算和重要的合同等會計資料,定期收集后,審查核對,整理立卷,編制目錄、裝訂成冊的保管,假如答應一個人既治理一個單位的錢款,又保管會計檔案,顯然輕易在錢款上做了手腳之後再利用治理會計檔案的機會掩蓋自己的行為,所以予以禁止:一個單位的收入、支出、費用、債權債務賬目的登記工作,包括記賬工作崗位的大部分但不是全部(比如現金日記賬和銀行往來日記賬就不包括在內) ,這部分記賬工作,是一個單位會計核算的基礎,也是發生現金往來的根據,也不能由出納人員兼任,一個人既治理錢款,又治理記賬這一發生錢款往來的根據,很輕易監守自盜。
  3. Discusses the optimizing process of treatments of the main technical problems, which include the construction schedule, the field plan and t he balance of earth and rock works, method of the river closure and cofferdams sections, procedure and time of the river colsure, form of the cutoff, construct ion of the cut - off walls

    論述了三峽大江截流及二期圍堰實施過程中的施工進度計劃、料場規劃與土石方平衡、截流方式與圍堰斷面形式、截流進占程序和時段、防滲形式、防滲墻施工等主要技術問題的優化完善過程
  4. Layout is an important part of the sea reclamation works, which consists of for kinds of rational layout of the exploitation of the embanked area, the irrigation and drainage works, the sea exploitation work schedule and the silt acceleration work schedule. not only are the four kind layout works interrelated and interrestricted, but also they come down to many natural and society factors

    圍海工程規劃是圍海工程重要組成部分,圍海規劃由圍區土地合理開發利用規劃、圍區排灌工程規劃、圍塗開發進度規劃和圍塗的促淤進度規劃組成,這四部分的內容不僅相互聯系又相互制約,而且還涉及到眾多的自然因素和社會因素。
  5. Dtu 40 - 46. building works. private contracts. fully supported lead roofing work. part 2 : schedule for special clauses

    Dtu 40 - 46 .建築工程.專門合同.完全支撐鉛層頂結構.第2部分:特別條款的目錄
  6. The etwb stipulates that if a contractor has been convicted of an offence under the employment ordinance ( cap. 57 ) for three times or more in a consecutive period of 12 months and each of the cases involves an independent incident and carries a maximum fine at level 5 or above as specified in schedule 8 of the criminal procedure ordinance ( cap. 221 ), the contractor will be automatically barred from bidding for public works contracts for at least six months

    根據環境運輸及工務局的規定,如建築承建商在連續12個月內被裁定觸犯《雇傭條例》 (第57章) 3次或以上,而每宗案件所涉及的均為獨立事件,且每宗案件的最高罰款都相等或高於《刑事訴訟程序條例》 (第221章)附表8所載的第5級刑罰,承判商便會被自動強制暫停競投公共工程,為期最少6個月。
  7. Despite the tight schedule and demanding task, we overcame the difficulties and strictly followed the design drawings, completing various works including the sensor base, lightning protection grounding and infrared security system

    我們克服了時間緊、任務重的困難,嚴格按照設計圖紙要求精心施工,完成了天線基座、防雷接地網、紅外線保安系統等配套設施的建設。
  8. We have a schedule ! tick - tock. everything works. timing

    我們已經訂好時間表了!一切都按部就班的進行著
  9. 5 the tender shall complete schedule ii - estimated contract payments and shall substantiate the tabulation of this schedule by attaching a table indicating anticipated major quantities of work performed over the duration of the works

    (五)投標者應在表二寫明預計合同支付款額,且在表中附上工程進行過程中預計的工作量。
  10. Article 36 the preparation and construction office is responsible for the following concrete works : examining the designs of the project, signing the project construction contract, organizing the purchase and inspection of related equipment, materials, etc., working out the general schedule of project construction, compiling the expenditure plans, controlling project financial payments and final accounts of the project, drawing up managerial methods and keeping and filing documents, drawings, files and materials, etc., during the construction period of the project

    第三十六條籌建處具體負責審查工程設計,簽訂工程施工承包合同,組織有關設備、材料等物資的采購和驗收,制定有關的管理辦法,做好工程施工過程中文件、圖紙、檔案、資料的保管和整理等工作。
  11. Schedule of hearings in respect of shek yam estate phase 2 building works

    就石蔭第二期建築工程舉行研訊的時間表
  12. While this is great long - term strategy, it almost never works in practice on a project with a tight schedule and budget

    雖然這是很好的長期策略,但是在時間和預算都非常緊張的項目中,這種策略從未實際發揮作用。
  13. The paper puts forward the structure of debris - retaining works system, layout consideration and construction principle for the coarse sand concentrated coming area, time sequence of the works construction of " large - scale first and small - scale second ", " downstream first and upper stream second ", and " carrying out section by section " and some problems demanding prompt solution according to the present facts and ; to speed up the preparation of a large - scale debris - retaining reservoir ; to draft the standards for a large - scale debris - retaining reservoir as quick as possible and ; lay emphasis on the schedule of various projects and correct understanding and fully playing the function of key dams through the analysis on achievements and problems of debris - retaining works building and combining with the gully characteristics of coarse sand concentrated coming area

    摘要通過對粗泥沙集中來源區攔沙工程建設成就與問題的分析,結合粗泥沙集中來源區溝道特徵,提出了粗泥沙集中來源區攔沙工程體系的構成、布局思路、建設原則,提出了「先大后小」 、 「先下後上」和「分段實施」的攔沙工程建設時序,並針對當前工作實際,提出了亟待解決的幾個問題:加快大型攔泥庫前期工作步伐、盡快制定大型攔泥庫標準、重視各類工程實施進度以及正確理解和執行規范、充分發揮骨幹壩的作用等。
  14. At the same time, we promise to offer low cost design works with prominent quality to our clients owing to our accurate grasp to the project budget and schedule as well as the continuous progress in the exercise of the newest technique and design level

    同時通過對項目預算、設計進度的嫻熟把握,涉及領域最新技術的運用和設計水準的不斷超越保證向客戶提供具有卓越品質和成本效益優化的設計作品。
  15. In planning and implementing a new sewerage project, we need to constantly review the scope, technical feasibility and works schedule of the project having regard to latest circumstances, and to consult the district council ( s ), rural committee ( s ) and local residents at the appropriate time

    此外,在策劃及推動新的渠務工程時,我們必須要因應不同的環境及情況經常檢討工程的范圍、技術細節及可行性,檢討並重新制定施工時間表,並在適當的時候諮詢有關區議會、鄉事委員會及村民的意見。
  16. Cost schedule models for contract works

    進度績效模型研究
  17. During the construction of the prophase works of dalong water control project, the supervisor can hold the construction progress and optimize various basic factors of the construction with quantitative management on all the contractors concerned in accordance with the requirement of the construction schedule before flood season ; with which the control objectives required by the owner are realized with the top construction quality rate over 90 %

    摘要在大隆水利樞紐前期工程施工中,監理部能把握汛前工程進度要求的主線,優化各生產要素,對多個承包商實行量化管理,實現了業主要求的控制目標,使完工項目質量評定優良率超過90 % 。
  18. Schedule of works for private drainage connections in resite village and village expansion area

    遷置鄉村及鄉村擴展區私人排水管道接駁工程一覽表
  19. In conjunction with the chinese historical archives museum, features exhibit schedule and sample works of chinese painters

    本機構是一個中介及代理機構。現已開設工藝品、書畫等欄目。
  20. Setting out a schedule for future major maintenance works for owners reference ; and

    訂定日後大型維修工程的時間表,供準業主參考以及
分享友人