危險源辨識 的英文怎麼說

中文拼音 [wēixiǎnyuánbānzhì]
危險源辨識 英文
hazard identification
  • : Ⅰ名詞1 (險惡不容易通過的地方) a place difficult of access; narrow pass; defile 2 (危險) dange...
  • : 名詞1. (水流起頭的地方) source (of a river); fountainhead 2. (來源) source; cause 3. (姓氏) a surname
  • : Ⅰ動詞(辨別; 分辨; 明察) distinguish; discriminate; differentiate; recognize Ⅱ名詞(姓氏) a surname
  • : 識Ⅰ動詞[書面語] (記) remember; commit to memory Ⅱ名詞1. [書面語] (記號) mark; sign 2. (姓氏) a surname
  • 辨識 : identification辨識符號 identification mark; 辨識技術 identification technique; 辨識器 identifier;...
  1. Identification of major hazard installations

    重大危險源辨識
  2. The identification of major risk resources for one chemical plant and the emergency program

    某在建氟化工廠重大危險源辨識應急預案
  3. Assessment discuss on safety technology ; assessment, monitor - control, energency measure for major. risk science and acciendental hidden danger

    有關安全技術的論證和評價咨詢。萬其是重大和事故隱患的、檢測、評價、監控和預警技術的咨詢工作。
  4. The result of supervision audit show that the implementation of the material measures of different degrees, directs effectively the enterprises are engaged in railway construction to strengthen the hazard identification, risk assessment and control

    監審結果說明,這些對策不同程度的實施,有效指導了從事鐵路項目施工的企業加強危險源辨識、風評價和風控制工作。
  5. After identifying all potential risk factors in traffic system, the effective countermeasures for traffic safety are put forward. it provides resources for administration department to prevent and reduce traffic accidents. thus, the backward situation of preventing and controlling accidents is changed, and real safety one for traffic system is realized

    通過對道路交通系統所存在的因素進行有效地,進而有針對性地提出交通事故控制對策,為預防和減少道路交通事故的發生提供頭管理措施,以便全面、系統地控制交通事故,真正實現本質安全,有效改變交通事故預防和控制滯后的工作局面。
  6. This subject directly investigates 14 construction enterprises and more than 40 construction sites. the types of the projects involve railway, bridges, tunnel, municipal, road, industry and civil construction, airport runway, hydraulic tunnel and others. this paper deeply analyzes and assesses the occupational health and safety management actuality of the construction site, points out the main problems in the process of hazard identification, risk assessment and risk control, and also analyzes why these problems exist

    該課題研究直接調查了十四家施工企業和四十多個項目施工現場,項目類型涉及鐵路工程、市政公用工程、公路工程、房屋建築工程、機場場道工程、橋梁工程、水工隧洞工程、土石方工程等,對施工現場實際的職業健康安全管理現狀進行深入的分析、評估,指出了危險源辨識、風評價、風控制過程存在的主要問題,並分析了為什麼會存在這樣的問題。
  7. Abstract : to set forth how to determine the cause of danger and distinguishing basis in production in the coal coking enterprise, then analyzes them, to apply the method of quantitative statistics analysis, classify the cause of danger into 3 ranks according to the practical production in the enterprise in order to control and manage them, then execute and accomplish safety policy of all participating in safety management and comprehensive management, prevent and avoid a variety of accidents, make safety work scientific and standardization, create healthy and stable circumstances for enterprise ' s production and business

    文摘:通過對煤焦化生產企業中(點)的確定和依據進行闡述和分析,採用定量統計方法,並結合生產實際情況將所有(點)分成三級(公司或廠級、車間或部門科室級、班組或崗位級)控制管理;從而實現貫徹企業安全管理工作「全員參與、全面管理」的方針,預防和避免各類事故的發生,使安全工作步入科學化、規范化軌道,為企業生產經營創造一個健康和穩定的環境。
  8. Furthermore, a standard safety management and monitoring information system was developed, including the subsystem of major hazard identification, safety evaluation and gradation, remote real - time monitoring, e - maps based on gis, gps positioning, emergency plan and command, site locating and safety planning etc, which provided an advanced tool for establishing the information system of major hazard control based on internet

    該系統主要包括重大危險源辨識、安全評價與分級、遠程實時監控、 gis電子地圖、 gps定位、應急救援預案及指揮、選址與安全規劃等子系統,為我國建立全國重大監控信息網路系統提供了一個標準的、先進的信息化平臺。
  9. Aiming at the present main problem, this paper puts forward the concrete measures of strengthening hazard identification, risk assessment and risk control

    並針對當前存在的主要問題,結合鐵路施工項目特點,提出了加強危險源辨識、風評價、風控制的10條具體對策。
  10. This paper discusses in detail hazard identification, risk assessment and risk control that are suitable to railway construction project, and the proper methods that are applicable

    詳細探討了適合鐵路施工項目的危險源辨識、風評價、風控制過程以及可應用的合理方法。
  11. This subject does some research on how to strengthen hazard identification, risk assessment and risk control, and how to avoid and reduce the accident, on the condition that railway construction enterprise builds and implements occupational health and safety management

    本課題研究鐵路施工企業在建立和實施以管理為核心的職業健康安全管理體系條件下,如何進一步加強危險源辨識、風評價和風控制工作,避免和減少事故發生。
  12. Based on the analysis on the characteristics of the sudden water pollution accidents in detail, such as the uncertainty of space - time, the polluted range and the suffered objects, the features of different fiver basins and the unclearness of the main subjects to respond urgently, the concept on the construction of the early - warning and emergency response system is made under the consideration of three parts - the early warning mechanism, the emergency mechanism and the computer - aiding decision system ; for which the hazard resources distinguishing, risk appraisal and the emergency response principles with the relevant organization, classification, monitoring, treatment method etc. are described, and then the requirements of both the processing of the accident simulation and the database design are analyzed as well

    在深入分析突發性水污染事故時空、污染范圍和污染對象的不確定性、流域性、應急主體不明確等特點的基礎上,構建突發性水污染事故預警應急系統體系,認為該系統應包括預警機制、應急機制和計算機輔助決策系統三個部分,並詳細闡述危險源辨識、風評價、應急原則、應急組織機構、應急分級、應急監測、應急處理方法等內容,同時分析了事故模擬的流程和數據庫設計的要求。