坑道作業 的英文怎麼說

中文拼音 [kēngdàozuò]
坑道作業 英文
tunnelling
  • : Ⅰ名詞(道路) road; way; route; path 2 (水流通過的途徑) channel; course 3 (方向; 方法; 道理) ...
  • : Ⅰ名詞1 (行業) line of business; trade; industry 2 (職業) occupation; profession; employment; ...
  • 坑道 : 1 [采礦工程] (井筒、平峒和巷道的統稱) gallery; adit; mine2 [軍事] (地下工事; 地下通道) (unde...
  1. In accordance with the repair work on industry road in bu - tzu koln, taichung, on the afternoon of sunday, november 22, 1998, fellow initiates from the taichung center gathered to clean the nearby road

    臺中訊為了配合?子路修整工,臺中小中心於十一月二十二日星期日下午集合了同修清掃中心附近的產路。
  2. Type nhss wire rope pulling hoist is widely suitable for use in bridge - construction, laying of large - size pipes, installation and adjusting of machinery an electric apparatus, and large reaction tower of petrochemical industry ; the installation and alignment of storage tanks ; erecting, fitting, welding and alignment of masts, steel concrete timber structures ; laying and translocating of rails and sleepers ; loading and unloading bulky heavy goods during transportation. cable tensioning ; demolishing of gallery supporting logs ; stacking forrestry wood ; and othersimilar cases. the hoist of this series is especially suitable for use in narrow working sites of limited space, where the job is high above the ground or in open air places, in tunnel of deep well, where no power for traction or lifting is available

    Nhss型鋼絲繩手扳葫蘆可廣泛用於建築施工、大型管鋪設、機電設備和石油化工大型反應塔、儲罐的安裝、校準、鐵塔及其它鋼木結構的豎立、拼裝焊接、校準、鐵軌、枕木的鋪設、移位、交通運輸中笨重貨物的裝卸、電線張緊、支撐木的拆除、林區木材的集放等等,對于局部空間受到限制的狹窄工場所、高空、野外、深井和無機電供能場所的各種牽引、提升、選用本系列產品尤為適宜。
  3. He sprang out of the truck and crept along a narrow wet passage to the place where his father was working.

    他從車里跳了出來,沿著一條又窄又濕的匍匐前往父親的地方。
  4. Some buildings were originally installed with toilets that made use of subterranean or stream water and owners of these buildings found it extremely difficult to change to seawater because substantial changes were required to the existing plumbing and other ancillary structures. these modifications were expensive therefore owners did not accept them

    至於原來已設有利用地下水或山排污用途的建築物,除需將原有沖水設施改裝外,輸送海水的管及其他配套設施,均較一般使用淡水或山水的管昂貴,故多不為主接受。
分享友人