填築工程 的英文怎麼說

中文拼音 [tiángōngchéng]
填築工程 英文
reclamation work
  • : 動詞1. (墊平或塞滿) fill; stuff 2. (補足; 充滿) replenish; supplement; complement 3. (填寫) fill in; write
  • : 築名詞(貴陽的別稱) another name for guiyang
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • : 名詞1 (規章; 法式) rule; regulation 2 (進度; 程序) order; procedure 3 (路途; 一段路) journe...
  1. Code for pulverized - fuel ash backfill technique in harbour engineering

    港口粉煤灰技術規
  2. On the basis of collecting and arranging a large amount of projects experience, conbined with construction diversion flood passing measures design and hydraulic model test of lihua hydraulic pawer station in 1995 and 1996, the dissertation studies the issues related with characteristics of concrete face rockfill dam including the selection of construction diversion flood passing standard and measures, flood passing during construction period and embankment stage, coffer dam design, construction scheme and general schedule etc. and present preference for project construction

    本文在搜集整理大量經驗的基礎上,結合蓮花水電站在1995年及1996年導流渡汛措施設計及水模型試驗,對混凝土面板堆石壩的導流渡汛標準、導流方式及其選擇、施期渡汛及壩體分期、圍堰設計以及施方案及總進度等與混凝土面板堆石壩特點有關的問題進行研究,為建設提供一定的參考。
  3. Abstract : as lanzhou construction areas extend towards gaolan mountains, baita mountains and the valley regions, the problem of environmental control for the made fill & excavation reconstruction project sites becomes more and more obvious

    黃土挖改造場區的環境條件十分復雜,只注重建設而忽視環境治理,將危及建物和場地的長期安全。
  4. The district open space at belcher bay reclamation as part of the project was completed in august 1998

    卑路乍灣海區的地區遊憩用地建已於一九九八年八月完成,這是計劃的一部分。
  5. Workmanship on building sites - code of practice for excavation and filling

    地操作藝.第1部分:挖掘和塞實用規
  6. Please clarify if the above ifp requirement is still maintained. please also clarify if proponents should not propose any pier structure outside the scheme area requiring reclamation and gazetting under the foreshore and seabed ( reclamations ) ordinance

    請澄清載于發展建議邀請書的上述規定是否維持不變,以及建議者是否不應建議把碼頭構物建於計劃區之外而須根據《前濱及海床()條例》進行海及刊登憲報。
  7. For example the concrete faced rock - fill dam in frigid zone is distinctive in terms of frost resistance and durability, cushion material seepage prevention and frost heave, adaptability of darn filling with season coordination among construction diversion, flood discharge and the whole construction schedule etc. lianhua construction which is situated in mudanjiang basin of heilongjiang province firstly creates the successful record of construction of large - size faced rock - fill dam in frigid zone, a series of internal and external problems not having a precedent to go by have been solved

    如在面板的抗凍耐久性、墊層材料防滲和凍脹特性、壩體與季節的適應性、導流和度汛與總體進度的協調等方面,寒冷地區混凝土面板堆石壩均有其獨特之處。蓮花位於黑龍江省牡丹江流域,首創了高寒地區修建大型面板堆石壩的成功記錄,解決了一系列國內外均無先例的難題。
  8. There has been an increase in the share of structures and facilities in total construction activities at sites in recent years, due to the development of the new airport and port expansion, together with all the reclamation, road and rail links and associated infrastructure

    由於新機場發展及港口擴建,加上海、公路、鐵路及相關基礎設施建設,以致近年其他建物及設施在建造中所佔的比例上升。
  9. From experimental result, i preliminarily know that eps is good thermal insulation material because the absorption of water is low and heat insulation is good, it is practicable at preserving temperature field of frozen earth roadbed and bringing frozen disaster under control ; second, according to the analysis of the eps that is applied into practical project, i have studied the practical effect which eps preserve roadbed temperature field, and the influence that was made after building field. i have get that eps can influence moisture content and frozen upper limit, through practical measuring data, i have studied freezing and expanding quantity and melting and submerging quantity during a complete frozen and melting cycle as well as have expanded and proved the practical application effect of eps with some reference significance to deep research of some connected problems. finally, through computer data analysis, setting up the analytical model of finite unit, i have simulated the temperature field of roadbed heat preservation, then expounded and proved that the height of embankment influenced the effect of thermal insulation material

    其一是對聚苯乙烯泡沫塑料( eps )保溫板以及天然路基土層、路堤料進行了室內試驗分析,結合國內外現在的有關科研成果,綜合確定其各項特徵參數;從試驗結果初步認識到聚苯乙烯泡沫塑料是一種吸水率低,隔熱性好的保溫材料,在凍土路基溫度場的保護和凍害治理方面是可行的;其二通過eps保溫板在現場實踐中的應用分析,研究了保溫板在保護路基土層溫度場的實際效果以及修路堤后造成的影響,保溫板對土體含水量、凍結上限的影響,通過實測資料,研究了在一個完整的凍融周期內整個路基的凍脹量和融沉變形量,論證了保溫板的實際應用效果,對有關問題的進一步研究和相關設計具有參考意義;其三,通過計算機數值分析,建立有限元分析模型,對保溫路基的溫度場進行了模擬計算,論證了路堤高度對保溫材料效果的影響。
  10. The reference values of strength parameters of the grounds and rock - fillers of the high rock - filled embankment on liuzhai - shuien highway in guangxi are obtained in this paper by synthetically analyzing the construction technology at home and abroad and indoor rock tests. by comparing the analysis method of settlement laws and thoroughly analyzing the datum of the embankment settlements of liuzhai - shuiren highway from the whole cons truction period, a new method generated from expectation technology to analyze the embankment settlement laws, " compete " growth curve, is presented in this paper and the result tallies with the observation data. for there are shortcomings in indoor rock tests, in this paper by combining finite element method with duncan - chang nonlinear constitutive model and composite method, a method for back analysis of the strength parameters of rock fillers is presented with a corresponding program, which has been successfully applied

    通過對國內外已有高石路堤修資料的綜合分析及室內巖石試驗,獲得了寨任二級公路高石路堤地基及料強度參數的參考值;通過對路堤沉降發展規律現有分析方法的比較及對廣西寨任二級公路高石路堤修中的沉降全過觀測資料深入分析,運用預測技術,提出了路基及路堤沉降發展規律分析的「龔帕斯」成長曲線分析方法;針對室內巖石試驗的局限,運用有限元技術,結合鄧肯一張非線性本構模型和復形調優法,提出了高石路堤石料強度參數的反演方法,開發了相應的反演分析序,並成功地反演了廣西寨任二級公路高路堤石料的強度參數值。
  11. The static loads were placed step by step in time sequence in order to simulate the construction conditions of the dam during the calculation. the results of the analysis show that excess pore water pressure would not appear in the design section during the analysis results that the dam was statically stable and the construction process was reasonable

    在靜力分析過中採用在時域上逐步加載的方法,模擬了壩體的施,計算結果表明,設計斷面在貯灰過中不會產生很高的超靜孔壓,壩體靜力穩定狀態較好,施進度合理。
  12. On construction and demolition waste management, mr lo noted that nearly all the 550 000 cubic metres of tunnel spoil from this contract will be reused in the penny bay reclamation project or processed into aggregates at a local quarry

    至於建和拆卸廢料管理方面,盧耀楨指出南灣隧道挖掘所產生的五十五萬立方米物料,差不多全部都不會浪費,並會在竹篙灣項目中循環再用,或在本地石礦場加製成碎石,以供建使用。
  13. If the cwb was not completed by then, the east - west traffic could be paralyzed when part of the corridor has to be closed for carrying out the essential repair reconstruction works ; given the central ozp and the continued implementation of the criii contract has never been held to be invalid or contrary to law, the urgency of the construction works and the other considerations mentioned above, it is in the interest of good administration not to revoke or refer the central ozp to the tpb under section 12 of tpo as it would have the inevitable result of terminating the criii contract, thereby further delaying the completion of the various essential transport infrastructure ; and

    E考慮到中區大綱圖已獲核準,而繼續履行中區海第三期合約一事又始終沒有被裁定為無效或違法,加上建迫切和上述其他的考慮因素,不根據城市規劃條例第12條把已核準的中區大綱圖撤銷或發還城規會,有利於妥善的行政管理,因為撤銷或發還中區大綱圖的話,中區海第三期合約便無可避免地須予終止,因而進一步推遲各項主要交通基建項目設施的完日期以及
  14. However the ongoing disturbance from construction and reclamation activities close to the main roosting site for the birds is of concern

    專家十分關注人類在這種雀鳥的主要棲息地附近不斷進行建,對它們造成的滋擾。
  15. Simply designed, this tile - roofed temple was constructed on large boulders against a rugged terrain. subsequent to a number of reclamations, it now bears a striking appearance amid modern commercial and residential buildings. few people know much about the life of hung shing

    經歷了百多年及多項后,這座建基於巨石、依山而的廟宇,現已被現代商住樓宇包圍,顯得份外突出。
  16. The plan encompasses the same gross floor area as currently proposed for the central government offices and legislative council, as well as for the commercial developments on the central extension outline zoning plan. it also includes many green open spaces, a central wanchai bypass and it accepts the current reclamation as given

    計劃中,政府總部立法會大樓,與及中區擴展部分分區計劃的商業發展,均採用與政府建議相同的建面積,亦包括不少綠化的戶外空間及中環灣仔繞道,為現正進行的予以認同。
  17. In the process of filling road embankment on soft soil ground, the method of calculating dynamic settlement can dynamically calculate the ground settlement by the physic - mechanical characteristic changing of the ground soil in the process of filling the road embankment, then dynamic estimating the ground settlement, and can control the filling velocity emphasising the supervision in the process of construction, so we can adopt the valid measure to insure the stability of roadbed and the permit settlement after construction

    摘要在軟土地基路堤中,動態沉降計算方法可根據地基土層在路堤中的物理力學特性的變化,逐步調整相應的計算參數,對地基沉降進行動態計算,從而對地基沉降量進行動態預測,用以控制速率,並採取有效的措施確保路基的穩定性和滿足后沉降量的要求。
  18. Therefore, tension tests of geogrids, pull - out tests between geogrids and expansive soils or sands, the related geotechical tests of soil " s properties, and model tests of soft ground improvement, were carried out for obtaining the engineering properties, quality index of geogrids, interaction parameters of friction characteristics between reinforcement and soils, and the affecting degree of factors influencing the lateral displacement ( pile ) rate during the construction of embankment filling with ( residual ) settlement considered restrictively

    本文以國內外大量研究成果為基礎,集中力量開展控制變形的特種土作料的物理改良技術和加筋墊層在控制沉降軟基處理的作用研究,其核心是筋土界面相互作用關系。為此,進行了為確定土格柵特性和尋找質量控制指標的拉伸試驗、筋土界面設計參數合理獲取的拉拔試驗及其配套土試驗、軟基上路堤中坡腳的側向位移及其速率的影響因素的室內模擬試驗。
  19. Use of drained method for reclamation for all phases instead of dredged method - drained reclamation takes longer but does not require dredging of contaminated bottom sediments

    期間所有應避免使用挖掘方法而改用排放方法土,雖然需時較長,但不需挖掘備受污染的海床沉積物
  20. ( 4 ) through the constant application of value engineering, make the merit maximization as the direction of construction, and ' then productivity of rock - fill material constantly increased, therefore construction schedule of embankment filling were quickened and the engineering construction were completed 120 days before the limited time

    ( 4 )應用價值,以功能價值最大的項目作為改進方向,隨著價值的不斷深入,價值的不斷提高,堆石料的生產率也不斷上升,加快了大壩進度,使得整個主壩填築工程期提前了120天。
分享友人