填築混凝土 的英文怎麼說

中文拼音 [tiánhúnníng]
填築混凝土 英文
fill concrete
  • : 動詞1. (墊平或塞滿) fill; stuff 2. (補足; 充滿) replenish; supplement; complement 3. (填寫) fill in; write
  • : 築名詞(貴陽的別稱) another name for guiyang
  • : 混形容詞1. (渾濁) muddy; turbid2. (糊塗; 不明事理) foolish; stupid
  • : 動詞1. (凝結) congeal; curdle; coagulate 2. (注意力集中) fix
  • 混凝土 : concrete; beton; jetereting混凝土壩 concrete dam; 混凝土板 concrete slab; 混凝土標號 concrete gra...
  1. On the basis of collecting and arranging a large amount of projects experience, conbined with construction diversion flood passing measures design and hydraulic model test of lihua hydraulic pawer station in 1995 and 1996, the dissertation studies the issues related with characteristics of concrete face rockfill dam including the selection of construction diversion flood passing standard and measures, flood passing during construction period and embankment stage, coffer dam design, construction scheme and general schedule etc. and present preference for project construction

    本文在搜集整理大量工程經驗的基礎上,結合蓮花水電站在1995年及1996年導流渡汛工程措施設計及水工模型試驗,對面板堆石壩的導流渡汛標準、導流方式及其選擇、施工期渡汛及壩體分期、圍堰設計以及施工方案及總進度等與面板堆石壩特點有關的問題進行研究,為工程建設提供一定的參考。
  2. Frame columns inset the filler - wall, avoided the influence that the comer of the room columns outstanding to indoorses view and take up the using space. at the same time, this structure has some advantages as the frame structure, such as arranging neatly, comparting easily etc., deeply welcoming by inhabitant and real estates company, is a building structure system that have the vast development foreground and satisfying the request of green building ". current, the reinforced concrete special - shaped columns structu re system lacks the actual measuring data of earthquake damage and the comprehensive aseismic performance of structure system, the structure system not yet is included in the national code, needing the thorough research

    鋼筋異型柱結構體系,採用t形、 l形、十形截面柱代替傳統的矩形截面柱,以輕質材料製作的框架充墻代替自重較大的粘充墻;框架柱隱于墻內,避免了屋角柱楞突出對室內觀瞻及佔用空間的影響,同時,又具有框架結構布置靈活、易於分隔的優點,深受住戶及房地產開發商的歡迎,是一種滿足「綠色建」要求並具有廣闊發展前景的建結構體系。
  3. Recently, using solid clay brick is gradually prohibited, so the new wall material is required to fill up the new architecture. many sections research on this field, using fly ash to develop new building materials is the mostly adopted method, among the new building materials, fly ash foamed concrete is a noticeable one because of its outstanding merits such as light weight, heat preservation, sound insulation and good resisting earthquake. using fly ash to develop foamed concrete can not only become fly ash into resources, but also provide a new kind of building materials for the innovation of wall materials, which has good economy and society ben efits

    近年來,由於墻改「禁實」政策的實施,市場急需新的墻體材料來補新建所需,許多單位相繼開展了各有關研究,綜合利用粉煤灰研製開發新型建材逐漸成為了主流,其中多孔特別是粉煤灰發泡,正以它突出的輕質、保溫、隔音、抗震效果好等優點,成為一種引人注目的建材料,利用工業固體廢棄物粉煤灰研製發泡不僅能實現粉煤灰的資源化,而且還可為墻體材料的改革提供一種新型建材料,具有較好的經濟效益和社會效益。
  4. Standard specification for preformed sponge rubber cork and recycled pvc expansion joint fillers for concrete paving and structural construction

    鋪面和結構建用預制微孔橡膠軟木和可回收的pvc膨脹接縫料的標準規范
  5. Standard specification for preformed expansion joint filler for concrete paving and structural construction nonextruding and resilient bituminous types

    鋪面和結構建用預制伸縮縫料的標準規范
  6. For example the concrete faced rock - fill dam in frigid zone is distinctive in terms of frost resistance and durability, cushion material seepage prevention and frost heave, adaptability of darn filling with season coordination among construction diversion, flood discharge and the whole construction schedule etc. lianhua construction which is situated in mudanjiang basin of heilongjiang province firstly creates the successful record of construction of large - size faced rock - fill dam in frigid zone, a series of internal and external problems not having a precedent to go by have been solved

    如在面板的抗凍耐久性、墊層材料防滲和凍脹特性、壩體與季節的適應性、導流和度汛與總體進度的協調等方面,寒冷地區面板堆石壩均有其獨特之處。蓮花工程位於黑龍江省牡丹江流域,首創了高寒地區修建大型面板堆石壩的成功記錄,解決了一系列國內外均無先例的難題。
  7. According to their building material, dams are described as concrete, earth fill, rock fill, hydraulic fill and so on.

    按照壩所用材料,可以把壩稱為壩、壩、堆石壩,水力沖壩等等。
  8. Rcc casting & backfilling work for cw pump house is in progress. excavation forcw channel was stared on april 2

    循環水泵房正在澆池壁和基礎回,前池于本月2日開挖,開挖工作正在進行
  9. It also includes a consideration of possible alternatives, such as a concrete gravity dam or an earth - fill embankment dam

    還要考慮到可能的備選方案,比如是選擇重力壩還是選擇堤大壩。
  10. Thaw settlement cause negative friction. this paper base on the thought of " initiative cooling ", aim at three problems existing in common concrete pile used in frozen soil, a new type of pile is proposed to overcome the disadvantages of the classical pile used in frozen soil. pile body within active layer is fluted and refilled with porous materials such as gravels and ballasts, convection will be occur and then thermal exchange inside porous material in winter while only heat conduction exists in summer, as a result the soil around flutings will be cooled, so the top line of permafrost will be drive up

    本文基於「主動冷卻」地基的思想,以及針對凍地區普通樁存在的三大問題,提出了一種新型樁的設計思路,運用數值模擬試驗手段對其冷卻機理與加固機理進行了系統研究,即在凍融活動層的深度范圍內,在樁身的表面刻槽,修完時槽內充碎石、塊石等多孔介質,通過外界大氣溫度的自然波動下多孔介質在冬季時存在的對流換熱機制,而在夏季只存在熱傳導,來達到主動冷卻樁周凍和抬升凍上限的目的。
  11. The first, site experiment is carried out. the paper analyze in - situ testing data of subgrade which is made up of plain concrete pile composite foundation and agitation pile composite foundation including pore pressure, layer settlement of soils between piles, earth pressure, lateral deformations

    發現正常荷載下,兩種復合地基路基的受力性狀不一樣,用建垃圾樁距較大的素樁復合地基,淺層應力向樁體集中,並通過樁向深層擴散,樁間與樁有較大的相對位移,樁頂和樁端的刺入較為明顯。
  12. Trial production blasts of the rock filling materials for shuibuya concrete face rockfill dam

    水布埡面板堆石壩料開采爆破試驗
  13. Extruded concrete curb technology was introduced in 20th congress icold held in beijing in year 2000, this method draw more attention for its improving the compaction of transition material, excellent performance of slope protection, and convenient construction. this extruded concrete curb technology was developed in ita dam construction in brazil, the ita method consists of building and extruded concrete curb by using an extruding machine before the construction of a layer of the transition material, then spread and level the transition material in layers inside the curb, and compact the layer by vib ' ratory roller horizontally

    巴西工程界在埃塔( ita )面板堆石壩建設中,借鑒道路園林工程中道沿機的擠壓滑模原理,創造性使用邊墻施工法,在每一層墊層料之前,用擠壓式邊墻機製作出一個半透水小墻,然後在其內側按設計鋪壩料,用振動碾平面碾壓,合格后重復以上工序。
  14. Self - densifying high performance concrete is well - performing concrete with the good performance of fluidity, anti - segregation and filling - up - space. with its own gravity and without any vibration, it can automatically fill up the space in and between fixed shutters and form self - densified concrete structure of ideal dynamic property and durability, therefore, it can accelerate construction progress of a building, shorten the construction period, secure concrete quality and improve the building ' s durability. in the mean time, it is conducive as well for environment protection and effects remarkable social and economic efficiency

    自密實屬于高性能,它具有高流動性、高抗離析性、高充性的性能,在自重作用下無需振搗,自行充模板空間,形成自密實的結構,有良好的力學性能和耐久性能,可以加快工程建設進度、縮短工期、有效控制的質量、提高建物及構物的耐久性,並有利於環境保護,具有較高的社會和經濟效益。
  15. Thirdly, because the depth of the seepage prevention wall of xia ban di dam project has the value of 85m which is the maximum depth in the dam projects in our country, the stress state of the seepage prevention wall is very complicated, the influence of nine modulus for nine kinds of seepage prevention wall material on the stress and displacement of the seepage prevention wall is studied and the rule of the change of stress and displacement with the change of characteristic parameters for seepage prevention wall under time of engineering completion and water impounding operation period is given in this paper

    第三,鑒于大壩基礎防滲墻深度達85m ,厚度僅為1 . 0m ,防滲規模和工程難度為國內之最,墻體應力比較復雜,本文研究了大壩施工竣工期、水庫蓄水運行期防滲墻的應力和變形隨墻體參數的變化而變化的規律,為大壩安全設計及防滲墻墻體材料的選擇提供了理論依據。
  16. ( 2 ) the stiffness effect of the infill walls can make the soft storey effect occur in the infilled frames. “ technical specification for concrete structures of tall building ( jgj 3 - 2002 ) ” requires that too much difference of stiffness between neighboring storey should be avoided when designing the infilled frames

    2 .由於充墻剛度效應的存在,充墻框架結構在一些情況下可能產生薄弱層效應。 《高層建結構技術規程》 ( jgj3 - 2002 )要求設計帶充墻結構時避免形成上下層剛度變化過大。
  17. Technical personnel are eager to find the new wall materials, which can not only take place of the solid clay brick but also satisfy the requirement for the energy efficiency in buildings. under the background of the wall material innovation and the energy efficiency in buildings, this paper advances a new idea that the haojiao materials with lights weight and functions of heat preservation and insulation are filled into the cavities of common hollow betonblocks, and a new kind of composite bearing and heat preserving block ( composite block ) comes into being

    工程界的技術人員們急需找到能替代粘磚同時又滿足建節能要求的新型墻體材料,本文就是在墻體材料革新與建節能這兩大潮流與背景之下,提出了一種新的設想? ?將具備良好保溫隔熱功能的輕質昊角材料充于小型空心砌塊的孔洞中,形成新型的承重保溫的復合砌塊。
  18. The hollow concrete has been filled in the interface between abutment and approach embankment. it is successful to solve the problem of poor compaction near the abutment because of restricted access. it is also very useful to drainage of the embankment

    本文還對大孔隙這一材料進行試驗分析,提出了臺背一定范圍內採用大孔隙,可以解決臺背一定范圍內的體不易壓實和臺背排水等問題。
  19. Adaptability of dam filling with season and coordination among construction diversion, flood discharge and the whole construction schedule should be taken into consideration. the choose of dam site, layout of the multipurpose project, design of concrete faced rockfill dam, construction and prototype observation are covered in this paper

    如在面板的抗凍耐久性、墊層材料防滲和凍脹特性、壩體與季節的適應性、導流和度汛與總體進度的協調等方面,寒冷地區面板堆石壩均有其獨特之處。
分享友人