壩梁 的英文怎麼說

中文拼音 [liáng]
壩梁 英文
baliang
  • : 名詞1 (攔水建築物) dam2 (固堤建築物) dyke; embankment 3 [方言] (沙灘; 沙洲) sandbar; sandba...
  • : 名詞1 (屋架中架在柱子上的長木) beam 2 (通常也指檁) purlin 3 (橋) bridge4 (物體中間條狀隆起...
  1. The effect of the support at the crest introduces in particular an inversion of the normal curvature of a free cantilever in free deformation.

    特別是頂支承作用使一個自由懸臂的變形曲線。
  2. Our “ sun shine ” brand carbon steel fiber have been widely used in road, protection slops of highway, bridges, reservoir dyke, tunnels, airport taxiways, well lids of city project ( guard against theft ), mine laneway, port, railway sleepers and etc, and gain high praise from clients

    本公司「雙興」牌碳鋼纖維廣泛應用於道路,公路護坡、橋、防浪堤、水庫堤、隧道、機場跑道、市政工程井蓋(防盜) 、礦井巷道、港口、鐵路軌道等方面,深受廣大用戶贊譽。
  3. Bridges, dams, and reservoirs have to be built.

    、堤和水庫必須修建。
  4. 3 analyzing particle size of the wind - blown sediment and surface soil indicate that the former in 0. 02mm - 0. 2mm occupy about 40 % and 55 % of sloping field and shoaly land of bashang, which shows that bashang is the erosion and desertification region or the latency. 4 the search of decreasing effect of wood strap indicates that in lower wind speed the effect is distinct

    3風蝕物及表層土壤顆粒粒徑分析表明,地表200cm高度內風蝕物粒徑在0 . 02mm 0 . 2mm之間;上地區坡地與灘地該粒徑范圍顆粒分別佔40和55左右,說明上地區是風蝕沙化或潛在風蝕沙化地區。
  5. The research fruits in this article can provide the temperature isoline map of crown cantilever section and central longitudinal section of the dam, the stress isoline map of crown cantilever section and upstream and downstream surfaces of the dam, the maximal and minimal stress distribution map in dam abutment along with the height of dam, the maximal and minimal stress table of typical nodes and the maximal and minimal stress table in different elevations, and also provide reference basis for taking relative temperature control measures in the design and construction of rcc arch dam

    本文研究成果可給出體的拱冠剖面和體中心縱剖面的溫度等值線圖、拱冠剖面和體上下游面應力等值線圖、肩最大最小應力沿高的分佈曲線、不同高程處典型點的最大最小應力值表以及不同高程處最大最小應力值表等成果,為碾壓混凝土拱的設計和施工中採取相應的溫控措施提供了參考依據。
  6. Depending on the above studies, the following conclusions can be obtained : 1 ) chang - 6 oil reservoir set of panguliang is a set of continental clastic sediment composed of lacustrine and deltaic system in which estuarine bar is not well developed

    研究結果認為:靖安油田盤古油藏長6油層組屬于以水下分流河道為主的具有強烈的進積作用,以水下分流河道為骨架砂體,河口砂不很發育的河控型湖泊?三角洲體沉積,主要發育三角洲前緣相。
  7. However, along with the increasing of construction quantity of the infrastructure of irrigation works, traffic, communication etc., newer and higher requirement of geotechnical anchoring are made in slope, major dam, bridge, tunnel, deep foundation ditch engineering and the construction engineering such as anti - capsize, anti - float, anti - slippage engineering of the buildings. for example, self - intension of rock and soil is required to exploit better ; carrying capacity of anchor increase according to anchoring length ; anchor should be sufficiently lasting and should not influence the exploitation of adjoining stratum

    但另一方面,隨著我國水利、交通、通訊等基礎設施建設力度的加大,邊坡、大、橋、隧洞、深基坑以及建築結構物的抗傾倒、抗浮力、抗滑移等建設工程將對巖土錨固提出一些新的和更高的要求:如要求進一步調用巖土體的自身強度,錨桿應具有足夠的耐久性,錨桿的使用應不影響周邊地層的開發等。
  8. Combined with practical data of shannxi lin hekou hydropower plant, the temperature filed of m and n schemes during construction and operation are simulated and analyzed. the isoline map of stable temperature field of the arch crest girder section and the vertical section in the center of arch dam, the isoline map of unstable temperature field of the arch crest girder section and the vertical section in the center of arch darn during construction and operation and the maximal and minimal temperature value during construction and operation are provided. the distribution law of temperature in the dam and the form reason of high - temperature zone are analyzed and the effect and feasibility of cooling and the zone of cooling are discussed

    結合陜西藺河口水電站工程實際資料,對m方案和n方案溫度場進行了施工期和運行期全過程模擬計算分析,給出了拱冠剖面和體中心縱剖面準穩定溫度場等值線圖以及施工期、運行期拱冠剖面和體中心縱剖面非穩定溫度場等值線圖,提供了施工期逐月和運行期每年最高、最低溫度等成果,分析了體溫度分佈規律以及高溫區形成的原因,並探討了預埋冷卻水管的效果和可行性以及預埋冷卻水管的區域。
  9. The upper body of the dam, having lost the assistance of the cantilevers, now behaves predominantly as a horizontal arch.

    上部體已喪失掉懸臂的輔助作用,現在主要表現出一個水平拱圈的性狀。
  10. Based on the arch - cantilever method, the stability of arch ring and cantilever beam against elastic buckling in arch dams are analyzed with the theory of elastic stability, and the conclusion is drawn that the stability of arch dam against elastic buckling is governed by the top arch ring

    按照拱分載法的思想,用彈性穩定理論分別對拱的拱圈和懸臂的抗屈曲穩定性進行了分析,得出拱的抗屈曲穩定性由頂拱圈控制的結論。
  11. Finite element internal force method is presented in this paper to solve it, based on the result of the routine method. this method utilizes the condition of internal force balance of arch system and beam system to solve their internal forces, then to solve dam body ' s equivalent stresses

    為此,本文提出了有限元內力法,該方法是根據常規有限元法的分析結果,利用拱和的內力平衡條件求解拱內力,然後求解體等效應力。
  12. The base is divided into finite block element. so, the stress and load that this system divided can be calculated. combining analyzing morrow point dam on colorado river with this method, the rationality of it is validated

    應用上述方法,結合morrowpoint雙曲拱,計算了該的分載與徑向位移,其成果合理,驗證了本文建立的體虛擬彈性地基基塊體有限元組合的拱分載法的合理性,且滿足工程精度的要求,有一定的實用價值。
  13. Corrosion protection of steel truss girders of caiyuanba changjiang river bridge in chongqing

    重慶菜園長江大橋鋼桁防腐
  14. This paper presents the corrosion protection system and part of the coating workmanship for steel truss girders of the caiyuanba changjiang river bridge in chongqing

    摘要介紹重慶菜園長江大橋鋼桁的防腐體系及部分塗裝工藝。
  15. The waterproof of the storage, underground grage, bridge, tnnel and subway

    蓄水池、地下車庫、橋、隧道、地鐵、污水池室外游泳池、堤等防水。
  16. Investigation of construction dike to silt up more cropland in lijialiang village

    李家村大搞築造地的調查
  17. Engineering earthquake safety evaluation of the nuclear power station dam site and brige etc. seismic gonation and microgonation, earthquake disaters estimation and mitigation, engineering structure ' s dynamic characteristic etc

    核電站、大、大型橋等重大工程的地需安全性評價;地震區劃和小區劃,震賃評估、預測及其減賃對策,工程自振特性和環境振動測試,爆破公害的控制設計等。
  18. Article 19 : building of dam, sluice gate, bridge, wharf and other structures blocking, crossing or bordering a river channel ; laying pipelines or cables across a river, must comply with state - specified standards for flood control and navigation as well as other related technical requirements

    第十九條修建閘、橋、碼頭和其他攔河、跨河、臨河建築物,鋪設跨河管道、電纜,必須符合國家規定的防洪標準、通航標準和其他有關的技術要求。
  19. Arch dam, which is fastened to the base rock, is a high _ order, hyperstatic, spacial body case structure. it has not only arch function but also girder function, but its main loads are passed to each dam abutment by means of arch function

    是固結于基巖的高次超靜定空間殼體結構,既有拱作用又有作用,其主要荷載是通過拱的作用傳到兩岸肩。
  20. Deck - girder steel dam

    式鋼
分享友人