壩腳 的英文怎麼說

中文拼音 [jiǎo]
壩腳 英文
base of dam
  • : 名詞1 (攔水建築物) dam2 (固堤建築物) dyke; embankment 3 [方言] (沙灘; 沙洲) sandbar; sandba...
  • : 腳名詞1 (人或動物的腿的下端 接觸地面的部分) foot; [兒語] footsie; footsy 2 (東西的最下部) bas...
  1. The figure with bandaged foot seated on a clay hummock between the dam and these dedicated workers, was irrelevant to their whole delicate operation.

    他包著坐在大和這些獻身者之間的一座小丘上,與他們這一考慮周到的行動毫不相干。
  2. The cutoff wall near the dam axis, the consolidation grouting and the curtain grouting for the foundation, and the high pressure jet - grouted cutoff wall at the toe of the dam form a vertical anti - seepage system for the dam foundation

    軸線附近的防滲墻、基巖固結和帷幕灌漿,以及上游壩腳處的高壓擺噴防滲墻,在基構成了垂直防滲體系。
  3. A brief introduction is given to the treatment of the zeya dam foundation, principles of seepage control and design of the concrete face rockfill dam of the zeya reservoir. as for the excavation of the sand - gravel zones, except the toe slab and its 1 / 9 bottom width down stream, the alluvial layers are excavated to the micro - weathered rocks, while the other sections remain unexcavated. regarding to the treatment of the fracture zones, concrete filling is used for the toe slabs and semi - permeable materials are used for other section. according to the construction characteristics, a filter is placed in the down stream embankment foot. to improve the integrity of the dam foundation and anti - seepage capability consolidation grouting and curtain grouting are adopted. as a result safety, economic benefit, convenience in construction and good performace are achieved

    簡要論述澤雅水庫面板堆石基處理和防滲的原則及設計要點.趾板基礎和堆石體各區砂礫石基礎開挖,除趾板與其下游1 / 9底寬范圍以及壩腳挖除沖積層至弱風化(局部微風化)基巖外,其餘部分均予以保留.斷層破碎帶處理,趾板部位採用混凝土塞,其它部位採用半透水料置換,並根據本工程特點在下游壩腳加設了反濾層.為提高基的整體性和防滲性能,對趾板進行了固結和帷幕灌漿.達到了安全、經濟、便於施工的目的,運行情況良好,可為面板堆石的設計和研究提供參考與借鑒
  4. Afterthe 24 / 7 era with the belt, which saw hundreds of title changes withinmere months, rob van dam entered the company, and after a fantasticmatch at invasion in 2001, the tile was back on solid ground, withgenuinely good matches showcasing off the no - limits hardcore style, with minimal weapon usage, and creative use of both weapons and thering area

    經過24 / 7時代,隨著帶中,出現了數以百計的所有權變動短短幾個月,搶劫麵包車大進入公司,而經過一段奇妙比賽入侵2001年瓷磚回到踏實地,真正好的比賽中展示過的無界限死硬作風,最小武器用法,並創造性地使用武器和環區
  5. The water - sprinkling festival, the three - course tea, the erhai lake, the yulong snow mountain ( jade - dragon snow mountain ) and ganhaizi grassland are what we have been looking forward to for a long time

    「潑水節」 「三道茶」 「洱海」 「玉龍雪山」 「文海草子」萬綠叢中一點紅,就足以牽引步,令人神馳已往,怦然心動。
  6. In the days following the september 21 earthquake, a series of aftershocks occurred, and falling rocks often missed us only by inches. we needed god s blessings to go deep into the mountains and under hiers protection, our fellow practitioners, thinking little of themselves, ventured into remote mountainous areas where no one else went. these included small tribal villages in yuchih and tongkuang townships, chiufen s twin mountains in kuohsing rural township, pingting in shuangwen, the dam on shuili mountain, jenai rural township, and the hills in wushe

    921災變后的初期,餘震不斷,前剛走,后落石就掉下,深入山區是需要佛菩薩保佑的,我們同修傻傻的,在上帝的保佑下,足跡深入到沒人去的地方,如魚池鄉東光等各小部落,國姓鄉九份二山的山區爽文的平頂水裡山上的水處仁愛鄉霧社的山裡,甚至我們部分的醫療人員也是翻山越領進入霧社山區去,后因山崩,坐救災直升機下山。
  7. The computation results indicate that when the earth - rock dam with the straight clay core on thick moraine cover foundation is designed, the design criterion for the earth - rock dam with straight clay core directly built on the bed - rock can be adopted for the design criterion of dynamic stability of dam itself, but the dam feet and the dam clay core feet should be reinforced for static stability

    計算結果表明,設計深厚覆蓋層上直心墻土石時,大自身的動力穩定設計標準可直接採用建設在基巖上的直心墻土石的設計標準,而靜力穩定問題應加強大壩腳以及心墻兩個底角部的防護。
  8. The sceneries are including piled rainbow bridge, big sand dam, e lu long, moon lake ( chai shi tan reservoir ), and ma ti river

    包括疊虹橋景區、大沙景區、三洞景區、阿路龍景區、明月湖景區(即柴石灘水庫) 、馬蹄河景區。
  9. Hongjiadu hydraulic power plant is the only leading water storage reservoir of wujiang cascade hydraulic stations, which is a full - time storage reservoir. 2 * landslide body is distributed at the right side of downstream, which is just located in the region of energy dissipation. erosion gully may cut the bottom of the landslide body. there are roads on the top of the landslide body during the construction period and operating period

    洪家渡水電站是烏江梯級水電站中唯一具有多年調節性能的「龍頭」水庫, 2 #塌滑體分佈於址下游右岸,恰好位於泄洪消能防沖區內,沖坑將塌滑體下部切,而且施工期和運行期在其上都布置有公路,因此2 #塌滑體失穩將影響整個水電站的正常運行。
  10. The formation of the scoured pits is related with such factors as the unstable flow velocity and the unstable flow state caused by the circumfluence in the cross direction, the upstream circumfluence and the circle flow around the embankment

    沖刷坑的形成與橫向環流、上游迴流和繞流丁造成流速及流態不均勻等因素有關;根石走失與根石在水中的穩定性和河床性質及壩腳附近沖坑有關。
  11. He stamped on t v stamps and slammed the lamp on the & n tsp ; damp dam

    他用踩郵票並將燈砰地摔在潮濕的
  12. The lowest part, as of an embankment or a dam

    最底下的部分,如堤防或
  13. Uses tong four foot cones to reinforce the yellow river dam shore root stone to suggest

    採用砼四錐體加固黃河岸根石的建議
分享友人