壩肩穩定 的英文怎麼說

中文拼音 [jiānwěndìng]
壩肩穩定 英文
abutment stability
  • : 名詞1 (攔水建築物) dam2 (固堤建築物) dyke; embankment 3 [方言] (沙灘; 沙洲) sandbar; sandba...
  • : Ⅰ名詞1. (肩膀) shoulder 2. (姓氏) a surname Ⅱ動詞(負擔) take on; undertake; shoulder; bear
  • : 形容詞1 (穩定; 穩當) steady; stable; firm 2 (穩重) steady; staid; sedate 3 (穩妥) sure; rel...
  • : Ⅰ形容詞1 (平靜; 穩定) calm; stable 2 (已經確定的; 不改變的) fixed; settled; established Ⅱ動詞...
  • 穩定 : 1 (使穩定) stabilize; steady 2 (穩固安定) stable; steady 3 (物質的性能不易改變的作用) stabi...
  1. But at the present, because of chronic geomorphy disintegration, altitude and ascent of bank slope have been built down and palliated. especial rock mass mechanics condition has not been existent, so all kinds of rock mass fracturing deformation was stopped to developing and steady

    但目前因長期的地貌剝蝕作用,岸坡的高度及坡度均已大為降低減緩,特殊的巖體力學條件已不復存在,巖體內部的各類張裂變形亦停止發展,處于破裂發展階段。
  2. Analysis of dam abutment stability of tianfumiao reservoir and reinforcement design

    天福廟水庫壩肩穩定分析及加固設計
  3. The evaluation on stability of seepage flow of the right dam abutment in laohe reservoir

    澇河水庫右滲流性評價
  4. Analysis on the reliability of the arch dam abutment stability based on stochastic finite element

    基於隨機有限元的拱壩肩穩定可靠度分析
  5. It is pointed out that the stability of the dam abutment is a key factor affecting the safety of concrete arch dams

    摘要指出可能影響混凝土拱安全的關鍵點為拱
  6. The engineering reaction analysis is divided stability analysis of high rock slope and deformation and skidresistance of rock mass on dam abutment

    工程效應分析分成高邊坡性分析和變形及抗滑性分析。
  7. Because of limit that invisibility and discommodious in anciently program, based on the method of limited rigid body equilibrium, using visual program language vb and connect autocad, realize plane and solid programme of abutment analysis of arch dam, provide alternation interface for designer. presently, our country constructing and will construct high 300m arch dam, it is important to judge security based on nonlinear fem analysis. basic theory of nonlinear fem analysis and its realization in ansys were studied

    針對傳統程序的存在問題,非直觀、不易操作特點,以剛體極限平衡法為基本分析方法, visualbasic作為操作平臺,結合autocad圖形軟體,完成了剛體極限平衡法二維、三維壩肩穩定分析程序設計,使之具有直觀性,可視性、易操作性,為設計人員提供了具有友好界面的工程使用軟體目前我國西部在建和將建一批300m級的高拱,運用有限元方法計分析拱性、評判大安全度十分有必要。
  8. Reliability assessment of xi - luo - du underground water - power plant : the results have been used by the cheng - du surveying, design and research institute for the preliminary design ; ( 2 ) the stress and strain analysis for the xiao - guan - zi sluice and its foundation : the report has been applied for the reinforcement of the foundation ; ( 3 ) the thermal control procedure for the no. 7 - 14 power plant dam segments of the three gorge project : the research report provides the effective and efficient methods for the controlling of the temperature field in the mass concrete structure ; ( 4 ) the software system development for the long - term monitoring for dikes : the software can automatically give the results of the seepage field and the probability of soil piping of dikes and underground ; ( 5 ) reliability assessment of xiang - jia - ba underground water - power plant : the results have been used by the zhong - nan surveying, design and research institute for the preliminary design ; ( 6 ) fatigue reliability estimation of shipping berthing pillar : the results give the optimized design scheme and prediction of the structural age ; ( 7 ) 3 - d static and dynamic stochastic finite element analysis for the strength, stability and thermal control problem for xi - luo - du project

    溪洛渡水電站超大型地下洞室群圍巖的安全可靠性分析:被成都勘測設計研究院應用於比選報告及可行性論證中; ( 2 )小關子水電站攔河閘及地基的應力應變分析:被成都勘測設計研究院應用於地基加固處理方案; ( 3 )三峽廠房7 # - 14 #段溫控並縫措施研究:為廠房段並縫方案的可行性提供了依據; ( 4 )堤防工程體系的長期監控預報預警決策系統開發:為監控、預測預報堤防滲漏管涌破壞提供分析軟體; ( 5 )向家地下洞室群圍巖的安全可靠性分析:被中南勘測設計研究院應用於初步設計方案中; ( 6 )靠船墩的疲勞可靠度研究:為廣東航運規劃設計院的靠船墩優化設計和加固提供依據; ( 7 )溪洛渡高拱基()強度和的三維靜動力隨機有限元分析及可靠度計算:為溪洛渡重大工程體的靜動力安全性及溫控方案提供依據。
  9. Based on the discuss of the geologic environment of the high slope of spandrel groove jinping i hydroelectric power station. and the engineering geological conditions of rock mass are carefully studied in the paper. the modified csmr are adopted to perform the classification of the slope rock mass, the results of which are combined with the macroscopic stability of the high slope. on the basis of these, the methods of geological diagnosis and the finite element analysis are applied to analyze and compute the overall stability of the high slope

    本文在闡明錦屏一級水電站區巖體的形成和演化特徵的基礎上,詳細研究了拱槽高邊坡巖體的結構特徵及岸坡巖體淺表生改造特徵,建立了岸坡巖體淺表生改造與岸坡演化模式,分析研究了巖體的物理力學性質,採用修正的csmr法對拱槽高邊坡的巖體質量進行分級研究,在此上基礎之上,採用地質分析判斷和有限元分析等方法,對高邊坡整體性進行了系統分析、計算與評價;應用塊體理論對高邊坡的局部性進行了分析計算,確局部不塊體的規模、出露范圍,從而對拱槽高邊坡的局部性有了系統全面的認識和了解。
  10. The research progressing as follows : ( l ) basic developmental character and engineering control effect of continuous macrostructure plane ( i and ii level ) of dam abutment has been systemically studied. and this kind of structural plane took important effect to appraise rock mass distortion and failure and stability

    論文研究進展主要有以下幾方面: ( 1 )系統研究了宏觀貫通性結構面(分類中的及級)發育的基本特徵以及它們的工程式控制制效應,闡明了該類貫通性結構面對巖體變形破壞及巖體性評價起主導作用。
  11. In this paper, regarding the analysis of stability factors of majiatian tailings fill dam, namely regional geologic structure, rock - soil body of dam foundation, poor geology phenomenon, leach consolidation and chemical consolidation of tailings, seepage water of dam body and king - size flood water of majiatian tailings reservoir, a preliminary demonstration on probability of earthquake liquefaction and seepage failure of dam bodys tailings sand soil, of the dam body failure resulted from abutment landslide and of the flood water overflowing crest, as well as on the contribution of leach consolidation and chemical consolidation of tailings to the stability of dam body has been performed

    通過對馬家田尾礦庫區域地質構造、庫區不良地質觀察、尾礦淋濾固結和化學固結、體滲透水和庫區特大洪水等因素對馬家田尾礦堆積性影響的分析,初步論證了體尾礦砂土的地震液化、滲透破壞、滑坡使體失和洪水漫頂的可能性,以及尾礦淋濾固結和化學固結作用有助於體的性。
  12. In this paper, regarding the analysis of stability factors of majiatian tailings fill dam, namely regional geologic structure, rock - soil body of dam foundation, poor geology phenomenon, leach consolidation and chemical consolidation of tailings, seepage water of dam body and king - size flood water of majiatian tailings reservoir, a preliminary demonstration on probability of earthquake liquefaction and seepage failure of dam body ' s tailings sand soil, of the dam body failure resulted from abutment landslide and of the flood water overflowing crest, as well as on the contribution of leach consolidation and chemical consolidation of tailings to the stability of dam body has been performed

    通過對馬家田尾礦庫區域地質構造、庫區不良地質觀察、尾礦淋濾固結和化學固結、體滲透水和庫區特大洪水等因素對馬家田尾礦堆積性影響的分析,初步論證了體尾礦砂土的地震液化、滲透破壞、滑坡使體失和洪水漫頂的可能性,以及尾礦淋濾固結和化學固結作用有助於體的性。
  13. Some primary researches are given in this paper, combined with the project - stability evaluation of concrete high arch dam of tengzigou, which is cooperated between hydraulic structure center of hohai university and dongbei hydroelectric investigation & design ltd. considering actual research work and specification, either concrete strength limit analysis of dam or shear failure of seams in rock abutments are taken singly into account for safety evaluation of high arch dam

    本文就這個問題,結合河海大學水工結構所和水利部東北勘測設計研究有限責任公司的合作項目?藤子溝水電站雙曲拱整體性分析,在這方面做了一些初步研究。現行規范將體混凝土強度校核和壩肩穩定安全度評價分開進行,沒有考慮兩者的關聯性,然而這兩類破壞常常是相互聯系,伴隨發生的。
  14. Trough the analysis of stabilization safety on tengzigou arch dam, some conclusions are obtained in the following : ( 1 ) tengzigou arch dam is safe under normal poll level ; ( 2 ) stabilization safety factor of tengzigou arch dam is about 4 - 5 ; ( 3 ) it is proved that combinatorial reinforcement measures are effective and feasible

    對藤子溝拱的數值計算和模型試驗分析表明: ( 1 )藤子溝水電站在正常蓄水位作用下,體和兩岸的; ( 2 )藤子溝拱的整體安全度大概為4 5左右; ( 3 )東北院提出的對左岸泥巖層挖除處理並用混凝土置換的加固除險措施經研究表明該加固措施是有效、可行的。
  15. Nonlinear finite element analysis on the stability of bailianya arch dam adutment

    白蓮崖拱壩肩穩定性有限元分析
  16. In this paper, author has a summary to method of stability of arch dam abutment, research method of limited rigid body equilibrium and nonlinear fem simulation analysis for arch dam designs based on ansys

    本文對拱壩肩穩定分析方法進行概述,較為深入的研究了剛體極限平衡法,以及非線性有限元在ansys中的運用。
  17. Its stability evaluation should be performed from the following aspects, i. e. the method of rock simulation, the co - action of the dam and abutment, the mechanism of abutment instability, and the criterion of instability

    闡述壩肩穩定評價中主要包括的4個方面內容:巖體的模擬方式,體和的聯合作用,失機理和失判據。
  18. Then, were discussed the methods of stability analysis including the stability criterion of arch dam and its abutment, with attention being focused on rigid limited equilibrium method and fem and the comparison of their advantages and disadvantages

    接著,探討比較了拱壩肩穩定分析方法,重點介紹了剛體極限平衡法和有限元法,比較了它們的優缺點,簡單論述了壩肩穩定的失判據。
  19. With development of computer science, the analytic method of stability of arch dam abutment is more and more diversification. the stability of arch dam abutment is important prerequisite of stability of arch dam, so it becomes an important research subjects

    隨著計算機科學技術飛速發展,拱分析的手段也越來越多樣化,而拱壩肩穩定是拱重要前提,因而它也就成為一個重要的研究課題。
  20. First, simply introduce the methods of calculation in the reliability. and introduce the rationale and the course of the calculation of the stress and the stability of arm ' s base in fixed value as a rule. also assay the stress and the stability of arm ' s base in fixed value with a great finite element method

    首先簡要介紹了可靠度的基本計算方法;以及用值方法分析拱應力及壩肩穩定的基本原理和一般過程,並運用某大型有限元程序對拱的應力和抗滑進行值分析。
分享友人