實測最大流量 的英文怎麼說
中文拼音 [shícèzuìdàliúliáng]
實測最大流量
英文
maximum recorded flow- 實 : Ⅰ形容詞1 (內部完全填滿 沒有空隙) solid 2 (真實; 實在) true; real; honest Ⅱ名詞1 (實際; 事實...
- 測 : 動詞1. (測量) survey; fathom; measure 2. (測度; 推測) conjecture; infer
- 最 : 副詞(表示某種屬性超過所有同類的人或事物) most; best; worst; first; very; least; above all; -est
- 流 : Ⅰ動1 (液體移動; 流動) flow 2 (移動不定) drift; move; wander 3 (流傳; 傳播) spread 4 (向壞...
- 量 : 量動1. (度量) measure 2. (估量) estimate; size up
- 流量 : rate of flow; flow; runoff; discharge; throughput; (flow) rate; quantity (of flow); flux
-
( 6 ) according to the relation of pressure and discharge of different orifice aperture from the experiments. the largest available length of lateral pipes was calculated, and the combined method of varied orifice aperture and equal discharge in lateral line was discussed
( 5 )根據實測的不同孔徑的壓力流量關系,計算了允許最大毛管長度,並在理論上對變孔徑等流量毛管組合方法進行了探索。Aiming at the present design fashion of domestic bigger tunnel, simulating a bigger tunnel with catholic characteristic, confirming the parameters of traffic inducement and controlling ( tunnel length, traffic, the selection and location of detection equipments, amount of roadway indicative lamp, etc ) on the base of the analog tunnel, discussing the controlling and revulsive mode of tunnel. briefly discussing the constitution of tunnel surveillance and controlling system and the executive means of traffic controlling and inducement subsystem and network structure of tunnel controlling system. finally discussing the conformation of emulational tunnel ' s database and detailed executive program by programming the computer emulation of controlling induce subsystem
論文圍繞「交通誘導與控制」這一中心展開,探討長大隧道交通誘導與控制設備及其控制誘導方式;結合國內外對交通流模型研究的成果,提出一套適合長大隧道交通流特點的交通流模型;並針對目前國內長大隧道的普遍設計方式,模擬一個帶有普遍性特徵的長大隧道,確定了關于交通誘導與控制方面的參數(隧道長度、交通量、檢測設備的選取和位置、車道指示燈的數目等) ;以此模擬隧道為基礎,進一步探討隧道的具體控制與誘導方式;簡要探討隧道監控系統的構成、交通控制與誘導子系統的實現方式,隧道控制系統的網路架構;最後通過編程實現控制與誘導子系統的計算機模擬,討論關于模擬隧道數據庫的構建,具體編程實現等。The daling river is a river of much bedload. the average of the loss sand can reach 21434. 3 thousandston, and the ratio is 18. 08 kg / m3. to this day, the ratio of sandiness by measuring in the biggest broken surface is 172 kg / m3. the baishi reservoir lies in the city named beipiao which in the middle reaches of the daling river in liaoning province, the income of the reservoir from the trunk stream is 11457 thousandston, and from the branch of the river is 1160 thousandston
大凌河是個多沙河流,多年平均懸移質輸沙量可達2143 . 43萬噸,平均含沙量為18 . 08kg m ~ 3 ,實測最大斷面含沙量為172kg m ~ 3 ,白石水庫位於大凌河中游的遼寧省北票市,年入庫沙量,幹流為1145 . 7萬噸,支流?牛河為1160萬噸。It makes the deduction on design tidal level process more reasonable than ever. finally, taking into account the observed data of tidal level are much more integrated than observed data of tidal discharge and the correlative relationship are established based on large numbers of samples. then, the sub stage maximum tidal discharges and tidal velocities are obtained according to the regressive equations and the observed tidal level, and the sub stage design maximum tidal discharges and tidal velocities are estimated by way of frequency analysis
最後,針對橋位河段實測潮流資料短缺而潮位資料相對完整的實際情況,基於大量樣本建立了潮流量與潮汐要素的相關關系,利用實測長系列潮位資料得到分期最大潮流量、潮流速系列,經頻率分析確定了分期設計最大潮流量、潮流速。Of them, great current capacity high accuracy pump test panel project has carried on tender on the internet, finally passed through the quality synthetic evaluation, and determined to be constructed and exploited by province mechanical and electrical design institute unit. after the project completed, it could expand the new product productivity, and substitute the import product
其中大流量高精度泵測試臺項目進行了網上招標,最後經綜合評價,確定同省機電設計院聯合開發建設,項目建成后,能擴大新產品生產能力,並能替代進口產品,提高企業經濟效益是十分必要的,同時對提高我國泵類製造水平勞動地區,同行業發展也是有現實意義的。It is verified by the observed data of xianing port area in changsha city that the model is of high accuracy, with the greatest relative error of the peak flow of only 7. 85 %, thus can be used in runoff simulation of harbor rainfall drainage system
經長沙市霞凝港區的實測資料檢驗,證明該模型在港區小流域的雨洪分析中有較高的精度,洪峰流量最大相對誤差僅為7 . 85 % ,可用於港區雨水排水的徑流模擬。Thus the reactive compensator can be located in the center of the distributed load in the area and make the best user of the compensator ' s capacity. the distance flowed by the reactive current is efficiently reduced and the active loss of power net goes down. two - stage control model is adopted in the optimized control technique of the system
該系統採用了測量點與補償點與分開的方式,實現了區域性無功負荷監視,使無功補償點可以安置在區域性分散負荷的中心部位,最大程度地利用了補償容量,有效地縮短了無功電流傳輸的距離,降低了電網的有功損耗。Depending on how the ground surface is denuded, the feature of the current crustal stress field and rock stress environment can be calculated analyzing the result in this paper : by analyzing the recovering feature of the elastic deformation of the rockmass in unload - stage under various pressures, it has been found there is close relationship between the recovering degree of the elastic deformation of the rockmass and the unloading degree of the pressure the direction of the major principal stress in the crustal stress field is not consistent with the direction of the crushing stress regional tectonics borne during the last tectonic movement. the evolving degree of the regional geomorphology evidently affects the current crustal stress field, which changes from the self - weight stress field to the horizontal stress field, with the changing of the eroding degree of the regional geomorphology ranging from valley area to hilly country to flat country. in valley area, where there is two stress belts, the bankslope s tress belt and the self - weight stress belt within the mountain. the direction of the major principal stress is nearly parallel to the ground surface and inclines towards the valley in the bankslope stress belt. it is nearly vertical in the self - weight stress belt
通過本文的研究成果,根據區域性地貌的演化特徵,我們可以大致地對現今地應力場進行判斷:在分級卸荷條件下,巖體中彈性變形的恢復具有明顯的規律性,這種規律對于研究地應力場的演變是有幫助的;地應力場中最大主應力方向與區域構造形跡在最近的構造運動中所受區域性擠壓應力的方向無明顯的對應性;區域性地貌形態的演化程度對現今地應力場的特徵具明顯的影響,隨著區域性地貌侵蝕程度由峽谷區、丘陵區、平原區的變化,現今地應力場特徵由自重應力場、水平應力場為主含少量自重應力場特徵向水平應力場的規律變化;在峽谷區,山體中具有兩個應力帶:自重應力帶和卸荷應力帶,最大主應力方向在卸荷應力帶中近平行於坡面並傾向于河谷、在自重應力帶中近於直立;根據原始地面遭剝蝕的程度,可以大致地估算最大主應力和中間主應力的量值和方向;在丘陵區和平原區,最大主應力的方向近於水平,並與附近區域性侵蝕盆地和河流的展布方向基本平行,根據原始地面遭剝蝕的程度,可以大致估算其最大主應力的量值;根據區域性地貌形態的特徵來分析工程區的現今地應力場特徵,並進而大致了解巖石的應力環境,這種分析方法得出的結論與許多實際的地應力測試成果基本一致,對于大型水電工程地下廠房和壓力隧洞的設計是有所幫助的。There are mainly two type of algorithms used for spatial spectrum estimation : one is those based on bayesian maximum likelihood method, like the ml ( maximum likelihood ) algorithm, maximum entropy method and etc., the others are based on the spatial decomposition or projection of correlation matrix, this kind of algorithm include vector characterization method, music ( multiple signal classification ) algorithm, projection matrix method, etc. music is a classical spatial spectrum estimation algorithm that has a super high resolution and is widely used today, however, it cannot estimate doa of signals that are correlated
空間譜估計的演算法大致分兩大類:一是基於極大似然估計和最大后驗概率估計統計理論的演算法,包括:極大似然估計法( ml ) 、最大熵法等;另一類是基於對協方差矩陣進行子空間分解或投影的演算法,包括:矢量特徵法、多重信號分類法( music ) 、投影矩陣法等。其中, music法是一種經典的空間譜估計主流演算法,具有超強的分辨性能,但它無法實現對相干信號進行測向分辨。Because the supply water system is large - scale, the pump stations are many, the ways of supply water are complicated, and the adjustable spare is large, the whole data in the optimization of supply water, the flux and its variety regulations in the control stations ca n ' t be acquired. the paper predicts supply water during the process based on the theory of artificial neural network control. the optimization has two steps
在實際供水系統中很難準確地獲取整個管網的所有基礎數據,主要難以預知所有節點的逐時流量及其變化規律,因此成為供水系統的優化調度的難點,本文採用人工神經網路對供水量進行預測,應用二級優化調度,第一級以整個供水系統的費用最小為目標,用回歸方法求出各供水節點的供水量;第二級利用流量跟蹤的方法對每個供水節點(泵站)實現優化運行,以期在泵站內達到最大節能目的。In addition, the characteristics of critical current of hts tapes in ac applied field and that of voltage - current curve when transport ac currents were studied. the problem on the criterion of ac current carrying capacity of hts tape was discussed, and some suggestion on the criterion of ac current carrying capacity were proposed
另外,對高溫超導帶材在交流背景磁場下的直流臨界電流特性,及超導體傳輸交流時的流?壓曲線特性進行了實驗研究,並對高溫超導帶材的交流最大載流能力的測量判據問題進行了探討,給出最大交流載流電流測量判據的建議。Experimental studies on measurement of flow - rate based on maximum velocity on circular cross - section
用圓管中最大流速測量流量的實驗研究This study in this paper shows that the proposed method is superior to the present method for the lightning current measuring in the economical, practicability and precision of measurement. another important point is that the magnetic tape detector can measure the lightning steepness directly, largely expand the magnetic tape appliance field
本文研究表明磁帶法在經濟性、實用性、精確性上遠遠優于現有的其它雷電測量方法,尤其重要的是磁帶法能夠直接測量雷電流最大陡度,極大的擴展了磁帶法的應用空間。The research of reservoir design flood is one of basic works in this subject. it is based on the reasons, and the actual conditions of baipenzhu reservoir are combined, the following contents are researched in this paper : 1. according to the actual conditions of baipenzhu reservoir and through the compare of parameters estimation methods, a objective and having fine statistic characteristics p - iii frequency curve distribution parameters estimation method of proximate baipenzhu reservoir is putted
正是基於這種考慮,本論文結合白盆珠水庫的實際情況,本著理論性與實用性相結合的原則,重點研究以下內容: 1 、根據白盆珠水庫的實際情況,對各種參數估計方法進行比較,提出一種客觀、有良好統計特性、適用於白盆珠水庫的p ?型分佈參數估計方法; 2 、利用實測流量資料推求設計洪水過程; 3 、分析計算可能最大洪水( pmf ) ; 4 、對兩種方法計算的設計洪水過程進行調洪演算,推求水庫特徵水位。Abstract : because the shenfu - dongsheng mine area is located in intermediate of arid and semiarid zone, its ecological environment is very fragile. based on the fragileeco - environmental, the coal mining and construction have brought out some new environmental problems. man - made debris flow problems is the most serious of them which caused by coal mining, construction of railway and highway as wellas exploiting stone. through a great deal of experiments of artificial simulation setting water rushing to two types of slope debris flow and debris flow gully in shenfu - dongsheng mine site, the characteristics is favourable to formation of debris flow ; ( 2 ) the waste gangue is easy to initiate and is main solid material of debris flow in this area ; ( 3 ) the whole debris flow process could be observed through the model simulation experiment of debris flow gully. at present, this experiment method is the best way to analyze debris flow genesis and process
文摘:神府東勝礦區位於黃土高原北部乾旱半乾旱過度地帶,由於煤田的大量開采,誘發了大量的環境問題,尤以人為泥石流最為嚴重.本文以神府-東勝礦區人為泥石流為研究對象,採用人工放水沖刷模擬實驗的方法,分析了坡面型和溝谷型泥石流源地鬆散體起動、產沙、泥石流過程的特性,所得結論為: ( 1 )放水歷時長、強度大,有利於泥石流的形成; ( 2 )棄土石渣易起動,是該區泥石流固體物質的主體; ( 3 )溝道型泥石流放水沖刷模擬實驗,便於觀測泥石流的全過程,坡面型泥石流放水沖刷模擬實驗,利於統計產沙、觀測侵蝕形態Because the shenfu - dongsheng mine area is located in intermediate of arid and semiarid zone, its ecological environment is very fragile. based on the fragileeco - environmental, the coal mining and construction have brought out some new environmental problems. man - made debris flow problems is the most serious of them which caused by coal mining, construction of railway and highway as wellas exploiting stone. through a great deal of experiments of artificial simulation setting water rushing to two types of slope debris flow and debris flow gully in shenfu - dongsheng mine site, the characteristics is favourable to formation of debris flow ; ( 2 ) the waste gangue is easy to initiate and is main solid material of debris flow in this area ; ( 3 ) the whole debris flow process could be observed through the model simulation experiment of debris flow gully. at present, this experiment method is the best way to analyze debris flow genesis and process
神府東勝礦區位於黃土高原北部乾旱半乾旱過度地帶,由於煤田的大量開采,誘發了大量的環境問題,尤以人為泥石流最為嚴重.本文以神府-東勝礦區人為泥石流為研究對象,採用人工放水沖刷模擬實驗的方法,分析了坡面型和溝谷型泥石流源地鬆散體起動、產沙、泥石流過程的特性,所得結論為: ( 1 )放水歷時長、強度大,有利於泥石流的形成; ( 2 )棄土石渣易起動,是該區泥石流固體物質的主體; ( 3 )溝道型泥石流放水沖刷模擬實驗,便於觀測泥石流的全過程,坡面型泥石流放水沖刷模擬實驗,利於統計產沙、觀測侵蝕形態It has been a long time on blood velocity measurement [ 9 ] of this type. there are many methods to obtain the windows. but the intensity signal obtained from the windows is n ' t accuray of some methods or the real time property is not very good of others
用相關演算法時,血液流速是血管上兩窗口間的距離除以血液流過兩窗口所用時間,時間用兩窗口血液灰度信號最大相關計算得到,微循環血液流速測量的研究已經有很長的時間[ 9 ] ,其中血管窗口的選取現在有多種方法,但現有的方法要麼窗口取得不準確[ 9 ] ,要麼實時性較差。The simulation result shows that the motor - vehicles modals of corsim and simtraffic can apply to beijing, but the models of pedestrian and bicycles are not perfect when the total number of pedestrians and bicycles reach 1150 ( bikes peds / h )
但行人、自行車模型不能完全準確的描述交叉口的運行狀況,當每小時行人、自行車的總流量大於1150輛人小時時,模型的模擬結果與實測數據間有大的偏差,相對誤差最高達到88 。A raw ( read after write ) dependency loop model is developed in this paper to analyze the raw hazards of register operands in complex pipeline. based on this model, a " dynamic " data forwarding policy is suggested to reduce the pipeline stalls caused by data raw hazards. theoretical analysis and practical experiments both show that the average cpi increment caused by data raw hazards can be reduced effectively by the dynamic data forwarding strategy
對于單發射結構的處理器,降低cpi值的根本途徑在於通過各種軟硬體技術減少流水線的停頓,本文構造了一個raw相關環路模型用於分析流水線中寄存器操作數的raw競爭現象,並提出了一種「動態」數據旁路優化策略,可以最大程度地減少復雜流水線中因數據的raw競爭而導致的互鎖停頓,理論分析和實測結果充分表明「動態」數據旁路機構可以有效地降低流水線因raw互鎖導致的平均cpi增量。Insulators leakage current has a close relationship with insulators contamination and humidity state, so it can provide an integrated reflection of the course of contamination flashover. the contamination flashover on - line monitoring device introduced in this paper predominates the insulators insulation degree by measuring leakage current, environment temperature and humidity. with the help of the device, an active partial aperiodic cleaning method will substitute the former passive general fixed cleaning method in order to prevent the contamination flashover to a larger extent
本文所描述的防污閃在線監測系統通過直接測量絕緣子表面的泄漏電流及環境的溫度和濕度,經過數據處理、分析、判斷,達到對絕緣子絕緣狀況實時監測的目的,以此為依據變定期的、全面的、被動的清洗為不定期的、局部的、主動的清洗,最大程度地防止污閃事故的發生。分享友人