小桁架 的英文怎麼說

中文拼音 [xiǎohéngjià]
小桁架 英文
jack truss
  • : Ⅰ形容詞1 (體積、面積、數量、強度等不大) small; little; petty; minor 2 (年紀小的; 年幼的) youn...
  • : 桁名詞[建築] (檁) purlin
  • : Ⅰ名詞1 (用來放置東西或支撐物體等的東西; 架子) frame; rack; shelf; stand 2 (毆打; 爭吵) fight;...
  • 桁架 : truss桁架桿 truss rod; 桁架高度 truss depth; 桁架跨度 truss span; 桁架梁 girder truss; truss beam...
  1. Sandwich seismic wall which concrete column was replaced with angle - steel truss was discussed in this paper in order to be used as outer - walls of multi - story shear walls system

    本文研究的是以角鋼代替混凝土暗柱的夾芯保溫混凝土抗震墻,以下簡稱復合墻板。目的是用作高層剪力墻體系的外墻。
  2. The truss structure featured by small flow resistance, strong toughness and less pressure loss

    具有流阻,剛性好,壓力損失式結構。
  3. Damage identification of truss structures using a minimum rank method

    結構損傷識別的最秩方法
  4. The main work of this paper was as fellows : ( 1 ) generalized the development of pre - stressed steel structure in our nation and abroad, and pointed out the main problem in practice ; ( 2 ) presented the mechanism of pre - stressed steel structure and revealed its applicable range ; ( 3 ) established the optimization design model for pre - stressed steel structure, which accounts for constraints on stresses and displacements of structure ; ( 4 ) brought forward the optimization design method, which combined linear programming and the principle of full restriction, through which we can obtain the magnitude of each time pre - stress and the optimized sections of each members of structure ; ( 5 ) analyzed the best times of pre - stress and pointed out that 2 ~ 3 times is preferable ; ( 6 ) conducted optimization design on large - space steel roof, horizontal parallel steel truss with local cables, horizontal parallel steel truss with global cable, and ultra - static steel truss, the result of which indicated that the multiple pre - stress structure is very economic ; ( 7 ) compared different schemes of cable placement for horizontal parallel steel truss, and the results showed that the local cable only unloaded the second girders, but had no response on the first girders and stomach poles, while global cable could unload the second girders and the stomach poles outside of turning point of cable, thus proving that global cable is more economic than local - cable

    本文的主要工作是:對國內外預應力鋼結構的發展歷史及現狀作了綜述和總結,指出當前預應力鋼結構工程實踐中存在的主要問題;闡述了預應力鋼結構的受力機理,並指出預應力鋼結構的適用范圍和特點;在考慮結構應力和變位約束的條件下,建立預應力鋼結構優化設計模型;提出多次預應力鋼結構優化設計方法和步驟,採用線性規劃和滿約束準則相結合的優化方法,可優化設計出施加的每一級預應力的大,並得到結構各部分的優化截面;對多次預應力最佳的施加次數作了分析,並建議以2 3次為宜;為驗證文中理論和方法,分別對大跨多次預應力鋼屋、局部布索的水平平行弦鋼、整體布索的水平平行弦鋼和局部布索的超靜定鋼等算例進行了優化設計,經濟效益明顯;對水平平行弦鋼的幾種施加預應力的方案進行比較,對于局部布索,預應力只對下弦起到卸載作用,對上弦和腹桿基本不起作用;而整體布索預應力除對下弦卸載外,對索折點以外部分腹桿也起到卸載作用,經濟效益好於局部布索。
  5. The cfst x - type arches improve the lateral stability by sloping the arc ribs, so it is ofen used in the designs of cfst arch bridge with small ratio of the width to the span. tongwamen bridge is a half - through cfst arch bridge, its span is 238m, and the width of its roadway is 10m, so the truss ribs in - plane is sloped into x - shapc to improve its lateral stability. as the cfst x - type arches with longest span all over the country presently, the design of tongwamen bridge can be used for reference of adopting cfst x - type arches in the design of arch bridges with small ratio of the width to the span

    鋼管混凝土x型肋拱橋是一種利用拱肋側傾來提高其橫向整體穩定性的橋型,在寬跨比較的鋼管混凝土拱橋設計中應用較多。浙江銅瓦門大橋是一座中承式鋼管混凝土無鉸拱橋,跨徑238m ,橋寬10m ,拱肋為平面形式,所以採用了x型拱肋以提高其橫向穩定性。作為國內目前跨徑最大的鋼管混凝土提籃拱橋,該橋的建成對我國今後長大跨徑寬跨比鋼管混凝土拱橋採用提籃拱具有借鑒意義。
  6. Therefore, the light steel portal frame system is compared comprehensively to the bent frame system of solid - web steel column and solid - web steel plate beam, the bent frame system of solid - web steel column and open - web steel pipe truss, as well as the system of rc column and open - web steel pipe truss

    因此對中型單層廠房中實腹式鋼柱加實腹式鋼板梁排體系,實腹式鋼柱加空腹鋼管體系以及鋼筋混凝土柱加空腹鋼管體系與輕鋼門式剛進行了綜合比較。
  7. Based on the analysis of the experiment results, it is regarded that the seismic behavior of the truss src columns is higher than those of rc columns. the steel requirements, the crosswise rod dimension and the welding quantity are the main factor, which influence on the truss type src columns

    通過對試驗結果的分析,認為配置角鋼式空腹鋼骨的鋼骨混凝土柱的抗震能力明顯高於鋼筋混凝土柱,配鋼率和斜腹桿的大與焊接質量是影響式空腹鋼骨的鋼骨混凝土柱的主要因素。
  8. Wan zhou yangtze river bridge is the establishing large span steel truss bridge now, and the property of it is the lower stiffness of the main girder. when the speed is high, the analyses and the vibration control of vehicles and bridge are very important, especially the dynamic lateral response of the system

    萬州長江大橋是目前在建的大跨度鋼拱橋,其特點是主梁結構剛度較,在高速行車速度下,對起車橋耦合振動分析及其控制尤其是車橋系統橫向動力響應研究則尤為重要。
  9. Cellular automata was applied to solve mechanical problem of plane truss, and the feasibility of which was discussed in this article. the characteristic of cell and the way of dividing cell were studied while presenting a program and its frame chart. the work load of the new method was not much because it neednt form a partial differential set or a general finite element robustness matrix. numerical computing results show that the new method has a rapid speed of convergence to nodal displacement and internal force of element, so it probably has a good prospect in solving solid mechanical problems

    嘗試用細胞自動機作平面力學分析,探討了該方法的可行性.給出元胞的劃分方法和特性,列出計算框圖並編制了相應的程序,由於不必形成結構的偏微方程集或有限元的總體剛度矩陣,計算工作量.算例表明,該方法對結點位移和桿內力的收斂速度均較快,是一種分析固體力學問題有前景的新方法
  10. Second, to solve the local stability problem of the bar under pressure, a function relationship between the sectional area and the inertia moment is established by using the similar transformation. accounting to the critical pressure stress, iterative formulas are derived which include big, middle and small flexible degree

    其次,對于結構中受壓桿件的失穩破壞,本文提出採用相似變換方法找到截面積與慣性矩的關系,根據壓桿的臨界應力分別導出大、中、柔度的迭代公式,設計出壓桿的截面積。
  11. The optimal model of truss structure is established, in which the cross sectional areas of bar are taken as design variables, the structure weight is taken as objective function. in the process, the reliability of structural displacement and bar stress and the fundamental frequency are taken as constraint functions. from the engineering practice, all the reliability constraints, which are implicit generally with the design variables, are equalized and transferred to the conventional explicit constraints

    本文將主要考慮結構的優化問題,首先建立數學模型,即以的橫截面積為設計變量、以重量最為優化目標,位移、應力等可靠性及基頻為約束條件;最後,從工程實際出發,對結構系統的可靠性隱形約束進行等價顯化處理,使之轉化為常規的橫截面積優化問題。
  12. The paper carried out elastic response spectrum analysis on staggered truss frame system, input two strong ground motion records to carry out elastic and plastic time - history analysis. the paper compared the difference of aseismic property between 20 - storeyed composite truss and 20 - storeyed braced composite truss, and concluded that longitudinal brace can not only increase the rigidity but also reduce drift displacement of the first storey. in addition, the paper adopted displacement coefficiency in push - over method to obtain object displacement, and gave the failure modes of the two structures respectively

    本文對鋼結構交錯體系進行了彈性反應譜分析、輸入了兩條強震記錄進行彈性以及彈塑性時程分析,對比了20層混合式和20層縱向帶支撐混合式在彈性階段及彈塑性階段的抗震性能區別,得出縱向帶支撐不但有利於增大縱向的剛度,還可以減結構底層層間變形的結果;利用pushover的位移系數方法得出了結構的目標位移,並得出了兩種結構的破壞模式。
分享友人