岸坡系數 的英文怎麼說

中文拼音 [ànshǔ]
岸坡系數 英文
side factor
  • : Ⅰ名詞(水邊的陸地) bank; shore; coast Ⅱ形容詞[書面語] (態度嚴峻或高傲) lofty
  • : Ⅰ名詞(地面傾斜的地方) slope Ⅱ形容詞(傾斜) sloping; slanting
  • : 系動詞(打結; 扣) tie; fasten; do up; button up
  • : 數副詞(屢次) frequently; repeatedly
  • 系數 : [數學] coefficient; ratio; modulus; quotient; factor
  1. After the reservoir sluices, the national highway 213 in this area will be submerged. so the national highway 213will increase its elevation to about 920 meters. in order to estimate the influence of the slope - sliding and bank - collapsing which caused by the reservoir sluices to the elevated highway, and to estimate possible emigration problem, stability analysis of landslide body no. l, 2, and 3 in i, ii area which located in bank accumulation body of zipingpu reservoir in national highway 213 is made by transfer coefficient method and 2 - d 3 - d fem in this paper

    紫坪鋪水庫正常蓄水位高程877m ,水庫蓄水后將淹沒該段現國道213線,因此國道213線將改線抬高至920m高程附近,為正確評價因水庫蓄水造成的滑、塌對改線公路的影響,以及可能產生的移民問題,本文用傳遞法和二維、三維有限元方法對有可能失穩的213國道紫坪鋪庫區庫堆積體、區的1號、 2號、 3號滑體進行了穩定性分析。
  2. ( 6 ) conclusion was obtained by the analyzing the mechanics environment and the stability of the lanslide on the right bank after the dam built : the value of the rock mass stress increased and the tensile stress region obviously reduced, the direction of the principal stress was unchangeable the dam and the landslide were stable under the dangerous condition ( the reservoir and at the same time the earthquake was viii ), but when the water lever suddenly fell and did not think of other force, safe factor evidently reduced, the dam and the landslide will be destroyed under the most dangerous condition ( the water lever suddenly fell and at the same time the earthquake was vi ) ; the stability of the landslide will be destroyed by the horizontal thrust under the most dangerous condition or ; the physical and mechanical parameter will be reduced due to long period filter, the landslide will be destroyed too

    ( 6 )建壩工程荷載條件下河谷巖體力學環境分析及右古滑體的穩定問題分析得出:建壩后河谷的巖體應力量值明顯增高,同時左的張應力區的范圍及量值明顯減小,主應力的方向依然與模型的底邊界垂直;大壩建成后逐漸蓄水階段以及同時考慮本區最強地震力的作用等各種不同的工況條件時,滑體及壩體總體上仍處于穩定狀態;水位驟降時,在未考慮其他外力作用的情況時,滑體的安全將顯著降低。若考慮水位驟降及本區最大地震力的共同作用,壩體將在滑體下滑推力的作用下產生破壞;建壩后水平推力對右古滑體穩定性的影響分析可以看出,在最危險的工況條件下,壩體及滑體也將處于臨界狀態;在長期滲透變形的作用下,由於滑帶的物理力學參的降低而有可能導致壩體失穩破壞。
  3. The ideal elastic - plastic constitutive relation and the pile - soil contact element are adopted in the fem numerical analysis. it is simulated that the lateral displacement field, the slide distance between the contact surface and the contact status

    採用理想彈塑性土體本構關和樁-土接觸單元,通過有限元值分析,對樁-結構體的位移場以及接觸面之間的滑移、接觸狀態進行了值模擬。
分享友人