排水龍頭 的英文怎麼說

中文拼音 [bèishuǐlóngtóu]
排水龍頭 英文
ablasshahn
  • : 排構詞成分。
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ名詞1 [動物學] (古代傳說中的神異動物) dragon2 (古代巨大的爬行動物) a huge extinct reptile:恐...
  • 排水 : drain off water; drain away water; dewatering
  • 龍頭 : tap; cock tap; faucet; bib(b)cock; bib(b); front of mud flow; cock
  1. 4 " h. t. hose connection which easily attaches to an outside hose bibb or to the drain connection on a water heater

    軟管連接,容易連接到外置軟管或熱器的放接
  2. Open the water heater drain valve and the nearest hot water faucet

    打開熱污閥和附近的熱
  3. Turn on water supply and open nearby hot water faucet to purge air from water system

    打開源,打開附近的熱系統內的空氣。
  4. If the hose is left on the figure 85 and 90m in freezing weather, the valve ' s self - draining feature will protect the sillcock from freeze damage if : 1 ) the nozzle is not left affixed to the hose ; and 2 ) the entire hose length is on a plane lower than the fixed position of the frostproof sillcock

    如果型號85和90m的軟管位於冰凍氣候中,閥門的自泄功能將會保護灑不會凍壞,如果: 1 )灑出口沒有連接軟管;或2 )整個軟管長度都位於防凍灑的連接點下方。
  5. Relying on its own capability of technological innovation, nanjing lan shen group has devoted its efforts to the development of chian2 s environmental protection cause and aimed at the world2 s adcanced technology in the environmental protection equipment. from 1985 when the german prouduction techinique of the submersible electric motors was imported to today when the company undertakes the production of the associated equipment for the key engineering projects of the state and from the unitary manufacture of such

    藍深的歷史可以追溯到創建於1958年的南京深井泵廠,自1986年生產成功中國第一臺潛污泵至今,已是國內最大的潛泵製造商之一。 40年來,藍深製造了200萬臺流體產品用於全球二十五個國家和地區,其中許多客戶均為行業企業並為之信賴。
  6. Periodical inspection and maintenance of water supply system, supplying pipe, tape and tank, drain pipe

    裝置的管線、箱及管道的定期檢查和維修。
  7. After a steady stream of water runs from the faucet, allow it to continue to run for three ( 3 ) minutes to purge the tank of air and ensure complete filling of the tank

    有穩定的流出后,讓繼續流出三( 3 )分鐘時間,以便出容器內的空氣,確保容器完全注滿
  8. Roads ( works, use and compensation ) ordinance ( chapter 370 ) ( notice under section 8 ( 2 ) ) - - pwp item no. 119cd ( part ) drainage improvement in northern new territories, package c ( phase 1 ) - - drainage improvement works at lung yeuk tau, kwan tei, tan shan river and leng tsai, fanling, new territories - - ancillary road works

    道路(工程、使用及補償)條例(第370章) (根據第8 ( 2 )條規定所發的公告) - -工務計劃項目第119cd號(部分)新界北部雨放系統改善計劃c部分(第一期)新界粉嶺、軍地、丹山河及嶺仔雨放系統改善工程附屬道路工程
  9. Roads works, use and compensation ordinance chapter 370 notice under section 8 - pwp item no. 119cd part drainage improvement in northern new territories, package c phase 1 - drainage improvement works at lung yeuk tau, kwan tei, tan shan river and leng tsai, fanling, new territories - ancillary road works

    道路(工程、使用及補償)條例(第370章) (根據第8 ( 2 )條規定所發的公告) - -工務計劃項目第119cd號(部分)新界北部雨放系統改善計劃c部分(第一期)新界粉嶺、軍地、丹山河及嶺仔雨放系統改善工程附屬道路工程
  10. 50 gallon distilled water storage tank of stainless steel construction for counter mounting with removable cover inlet and overfow fittings, guage glass and draw off cock

    50加侖蒸餾不銹鋼儲存箱為逆架置以可移動的蓋子入口和溢出配件,測量玻璃和排水龍頭
  11. Acoustics. laboratory tests on noise emission from appliances and equipment used in water supply installations. part 2 : mounting and operating conditions for draw - off taps and mixing valves

    聲學.供設施使用的器械和設備發出噪音的試驗室試驗.第2部分:排水龍頭和混合閥門的安裝和操作條件
  12. If water heater is full of hot water, open a hot water line at a faucet and allow all hot water to be flushed from the system

    若熱器充滿熱,則打開熱管道上的,讓熱從管道內出。
  13. In china, the architectural design corps depend on the leading registered architects and engineers of structural technology, mechanical, plummbing and electrial system to fullfil the project desjgn

    在我國,建築設計單位是依靠以執業注冊建築師為的包括結構、給、電氣、弱電各專業的工程技術人員為主體來完成其職能。
  14. Keep in mind a downward slope is required to aid draining and prevent damage to the sillcock due to freezing ( see schematic drawing above )

    要記住保持所需的一定斜度,以幫助泄和防止由於冰凍而損壞灑(參閱上列示意圖) 。
  15. Models 8a, 8b, 8fr and 8p hose connection vacuum breakers are constructed to allow sill cocks to be drained

    型號8a , 8b , 8fr和8p軟管連接真空斷路閥其結構允許灑放。
  16. By the experiment in site and construction of two important water conservancy projects ( longhekou reservoir and hengpaitou diversion project ), we go a step further on the principle of the jet - grouting used on dam diaphragm - wall

    本課題是結合河口庫、橫樞紐兩個大型利工程壩基防滲加固的實際要求,通過現場試驗和工程施工,對形成高噴防滲墻原理和作用機理進行進一步分析。
分享友人