排泥設施 的英文怎麼說

中文拼音 [bèishèshī]
排泥設施 英文
soil discharging facility
  • : 排構詞成分。
  • : 泥名詞1 (含水的半固體狀的土) mud; mire 2 (像泥的東西) any paste like matter; mashed vegetable...
  • : Ⅰ動詞1 (設立; 布置) set up; establish; found 2 (籌劃) work out : 設計陷害 plot a frame up; fr...
  • : Ⅰ動詞1 (實行; 施展) execute; carry out 2 (給予) exert; impose 3 (施捨) give; hand out; best...
  • 設施 : installation; facilities
  1. In view of the problems of the underground water pollution caused by the direct discharge of the original dust removing water of converter that had poor quality and the old and backward processing facility of converter slime which had poor processing results, a series of measures such as using box filters have been taken so as to fully recycle the dust removing water of converter and recover the slime. as a result, the water is saved and the pollution eliminated, which has brought remarkable social and economical benefits

    針對原轉爐除塵污水水質較差,直接外對地下水造成污染;轉爐污處理陳舊落後,處理效果差等問題,採用廂式過濾機處理等一系列措,使轉爐除塵污水全部循環,污全部回收,既節約用水,消除污染,又收到明顯的經濟和社會環境效益。
  2. For recreation, cactus resort sanya boasts the largest outdoor swimming pool in china, two tennis courts, beach volleyball, mountain bikes, pedalos, billiards, a massage area and a wide range of other indoor and outdoor games

    酒店擁有中國面積最大的室外泳池,兩個地網球場、沙灘球場、山地車、腳踏船、撞球、按摩廳等多類型的室內、外運動及康樂
  3. This article introduces the silt geology platform afterwards uses the powder spurts and the plastics drain off water the board and grille and back pressure protects etc design and the construction control of measure, the construction has the guidance meaning to the construction of the bridge abutment soft base

    摘要介紹了淤地質臺后採用粉噴樁、塑料水板、土工格柵、反壓護道等措計與工控制,對臺后軟基處治工程的工有指導意義。
  4. Soil discharging facility

    排泥設施
  5. Based on the investigation and analysis on the design structure, factual structure, damage, drainage, traffic volume, construction of cement concrete pavement in zhengzhou, this paper finds out the defect on design, construction and maintenance of cement concrete pavement, and discusses the main reasons which cause it to damage in theory and practice

    本文通過對鄭州市具有代表性的水混凝土路面結構計狀況、實際路面結構狀況、破損狀況、水狀況、交通量狀況、工情況、養護情況的詳細調查和較系統的分析,找出了水混凝土路面計、工、養護等方面存在的不足,並從理論和實踐上論證了這些不足是造成水混凝土路面損壞的主要原因。
  6. Complicated hydrologic and geographic conditions, and the large scale of the xiaolangdi hydraulic project on the yellow river are introduced briefly. three desilting tunnels are designed to meet the requirements of flood control, sediment discharge and runoff regulation. according to the performance requirements of desilting tunnels, the tunnel lining down - stream of the grouting curtain is designed to be post - tensional prestressed lining. on the basis of investigation and research, experiements and analysis, the unbonded prestressing system is used. it is the largest unbonded prestressed tunnel lining project in the world, and the first one in china

    簡介黃河小浪底水利樞紐復雜的水文、地質條件以及龐大的工程規模.該樞紐計有3條沙洞,擔負著泄洪、沙、調節徑流和保證進水口不被沙淤堵的任務.根據沙洞的水庫運用要求,灌漿帷幕下游沙洞洞身段計為混凝土后張預應力隧洞.通過大量的調研、試驗、分析論證,在工前確定該預應力方案選用無粘結預應力系統,成為目前世界上規模最大的無粘結預應力隧洞襯砌工程,在國內尚屬首例
  7. Sludge disposal system availability range from c13 superscript bin discharging sludge dewatering mouth, until dry sludge provide material, burning, smoke and ash emissions purification of the entire output of mechanical equipment, process pipelines, electrical equipment, instrument control system and civil engineering, including the whole project within the scope of the design, construction, manufacture, installation, and trial run and test run after the normal operation of the after - sales service

    處置系統供貨范圍從c13標脫水污料倉出料口開始,直到干化污出料、焚燒、煙氣凈化放和灰渣輸出為止的整套機械備、工藝管道、電氣備、儀控系統和土建工程,包括整個工程范圍內的計、工、製造、安裝調試、試運行及正常運行后的售後服務。
  8. Where such enterprises as whose projects are listed by the municipal committee and government as the key newly - started projects of the year, and with capital for actual foreign investment more than 5 million us dollars, the enterprises in question shall be granted as a support the same sum as such fees for urban infrastructure support, noise and sewerage, construction of the relocation of the people ' s air defense facilities, land and water facilities compensation, by - product price adjustment fund, bulk cement special fund as are collected within the authorities of the city government ; enjoy half reduction on the engineering quality supervision charge ; and the charges on land evaluation, construction project transaction service, planning techniques service, house - measuring and drawing shall be collected per 50 % of the lower limit of charge collection standards

    第四條:凡被市委、市政府列為年度新上重點項目且外資實際投入資金500萬美元以上的企業,給予本市權限內收取的城市基礎配套費、噪聲污費、人防易地建費、水土補償費、副食品價格調節基金、散裝水專項基金等額資金扶持;減半收取工程質量監督費;對土地評估費、建工程交易服務費、規劃技術服務費、房屋測繪費按收費標準下限的50 %收取。
分享友人