敷設 的英文怎麼說

中文拼音 [shè]
敷設 英文
lay; rough in
  • : Ⅰ動詞1. (搽上; 塗上) apply 2. (鋪開; 擺開) spread; lay out 3. (夠; 足) be sufficient for Ⅱ名詞(姓氏) a surname
  • : Ⅰ動詞1 (設立; 布置) set up; establish; found 2 (籌劃) work out : 設計陷害 plot a frame up; fr...
  1. Installation methods of power cables buried ground

    地下電力電纜的敷設方法
  2. Compared to straight electric locomotives diesels save the heavy investment required for overhead wires or third rails.

    與架線電力機車相比,柴油機可以節省架線或敷設第三條軌道的巨額投資。
  3. Fibre optic cables to be installed off chung hom kok

    舂坎角水域敷設海底光纖電纜
  4. ( 2 ) drainage way of toilet and kitchen of residential building in this chapter, the necessity of reformation of drainage way of toilet and kitchen are presented. drainage way with floor blocked up, drainage with back outlet sanitary facilities and drainage with floor descended are discussed and summarized

    ( 2 )住宅衛生間、廚房排水方式提出合理解決衛生間、廚房排水方式勢在必行,對墊高衛生間地面敷設排水管的排水方式、後排水方式和下沉衛生間樓面敷設排水管的排水方式進行探討和總結。
  5. Besides serving as carriageways for vehicles and pedestrians, roads also accommodate various utility services, such as water and gas mains, sewers and electricity and telephone cables

    除了供車輛和行人使用外,本港的道路也敷設了各種公用施,如水管、煤氣喉管、污水渠、電纜和電話線等。
  6. Commercial building telecommunications cabling standard - part 2 : balanced twisted - pair cabling - addendum 3 - additional considerations for insertion loss and return loss pass fail determination

    商用建築電信電纜敷設標準.第2部分:對稱雙絞合線電纜敷設.補充件3 .插入損耗和回波損耗通過失效確定的附加考慮要素
  7. Pipe laying works

    敷設管道工程
  8. 2. when installing, the permitted bending semidiameter is not less than four times of cable outside diameter

    2 .敷設時電纜的允許彎曲半徑應不低於電纜半徑的4倍
  9. They are laying new sewers along the road.

    他們正在沿路敷設新的排水管道。
  10. The zhaozhou bridge built in the daye period ( 605a. d. -618a. d. ) of the sui dynasty ( 581a. d. - 618a. d. ), with a clear span of 37 metres and small arches within the main arch, was the earliest spandrel arch bridge and also the longest stone arch bridge in the world.

    中國隋朝大業年間(公元605-618年)建成的趙州橋,凈跨37米,主拱圈上敷設小拱,是世界上最早的空腹拱橋,也是當時世界上跨度最大的石拱橋。
  11. Commercial building telecommunications cabling standard - part 1 : general requirements - addendum 3 - supportable distances and channel attenuation for optical fiber applications by fiber type

    商用建築電信電纜敷設標準.第1部分:一般要求.補充件3 .根據纖維類型決定的光纖備的可支持距離和通道衰減
  12. By 1865 siemens had opened up shop in britain and was building telegraph lines all over russia

    1865年,西門子進入英國市場,同年獲得俄國業務代理權,在其境內敷設電報線路。
  13. Environmental temperature : - 40 for fixed laying, - 15 for unfixed laying

    最低環境溫度:固定敷設- 40非固定敷設- 15
  14. Lowest environmental temperature : - 60 for fixed laying, - 20 for unfixed laying

    最低環境溫度:固定敷設- 60非固定敷設- 20
  15. Owing to the congested environment in hong kong, road opening works inevitably affect traffic and buried utility services and cause inconvenience to the public

    由於香港環境擠逼,進行掘路工程,不免會影響交通和地底敷設的公用服務施,對市民造成不便。
  16. Lagging design and installment means of cable have become one of technique keys that hinder cable layout quality and efficiency

    電纜敷設計及安裝工程管理手段的落後已成為制約電纜施工質量和效率提高的技術關鍵之一。
  17. 2 if users require, the knowledge that our company trains relevant cables to lay, using, maintaining for users free, etc., get to instruct users how to construct correctly live

    2如果用戶要求,我公司免費為用戶培訓有關電纜敷設使用維護等知識,到現場指導用戶正確施工。
  18. On the basics of guangzhou city urban mass transit line net development experiences, considering the research of resources sharing of guangzhou transit line net planning, this paper discusses the necessity, the main factors and principle of the route laying, makes an integrated analysis of the adaptable ranges of the ground line, the elevated line and the underground line, as well as their influences over land use, environment and engineering mat, which, as the authors hold, will provide the technique support for the route laying mode planning of the line net

    摘要結合廣州市城市軌道交通線網建規劃的經驗,在廣州市城市軌道交通線網資源共享規劃研究的基礎上,對線路敷設方式規劃的必要性、主要內容、影響因素及確定原則進行了闡述,並對地面線、高架線、地下線三種形式在適用范圍、對城市土地利用、對環境影響、工程造價等方面進行了綜合分析比較,為線網線路敷設規劃提供技術支持。
  19. Clay roofing tiles for discontinuous laying - determination of physical characteristics - part 1 : impermeability test ; german version en 539 - 1 : 2005

    非連續敷設用粘土屋面瓦.物理特性的測定.第1部分:不
  20. Below an isometric view of the scheme showing the timber cladding to the risers and the upgraded glazing complete with atrium entrance space

    下圖方案的一個軸側圖展示了木材敷設到熱煙囪上,以及加強玻璃整合了中庭和入口
分享友人