斜面壓頂 的英文怎麼說

中文拼音 [xiémiàndǐng]
斜面壓頂 英文
raking coping
  • : 形容詞(跟平面或直線既不平行也不垂直的) oblique; slanting; skew; bevel; diagonal; askew; inclined; tilted
  • : Ⅰ名詞1 (頭的前部; 臉) face 2 (物體的表面) surface; top 3 (外露的一層或正面) outside; the ri...
  • : 壓構詞成分。
  • : i 名詞(人體或物體的最上部) crown; peak; top Ⅱ動詞1 (用頭支承) carry on the head 2 (從下面拱...
  1. The limited hydrothermal karst and mixed zone beneath the anticline axis controls the porosity distribution of ordovician system and it is anticipated that surroundings of the axis of fold formed by compressional reverse orverthrusting during indo - chinese epoch and the coordinated area of morphology of anticline in the screen of buried hill and that of top surface morphology is the best position for development of the reservoir

    局限的熱液巖溶和裸露的背軸部之下的混合帶對千米橋潛山奧陶系孔隙分佈具有重要控製作用,預期在印支期擠逆沖作用形成的背軸部,特別是潛山內幕背形態與潛山形態相互協調的區域,應是儲層發育最好的部位。
  2. Fabrication of the box beam is divided into such parts as reinforcement, formwork, concreting, prestressing, moving and storing of beam, pipe grouting under pressure, end sealing of the beam, water - proof layer on the bridge surface system, protective coating etc. the paper makes description of effective box beam construction technology and workmanship which can be adopted in other projects, such technologies as : manufacturing and fixing of reinforcement, steel reinforcement fixing baseplate, web plate and top plate respectively and lifting the steel skeleton into form, requirements of design and manufacturing and way of utilization for dismantling - erection type formwork and hydraulic formwork, optimization of concrete ratio, concrete pouring process of two ends of beam in priority over the middle, in sequence of first baseplate followed by web plate and top plate at last, concrete pouring in inclined section and in horizontal layer, concrete vibration mainly by external vibrator in assistance with internal vibrator, methods and regulation for steam curing of concrete, dual controls over stress and strain to ensure quality of prestressing workmanship, construction method of effective beam moving by heavy - weight special moving facility, some regulations and key notes about construction of grouting under pressure, beam ends sealing, water - proof layer on the bridge surface system, protective coating

    箱梁製造由鋼筋工程、模板工程、混凝土工程、預應力工程、移存梁工程、孔道漿工程、梁體封端工程、橋防水層和保護層工程等施工環節組成。文中介紹的採用胎具製作和綁扎鋼筋,分底腹板和板分別綁扎並吊裝鋼筋骨架入模;拆裝式和液式兩種模板的設計、製作要求和使用方法;綜合考慮、優化混凝土配合比,混凝土灌注從兩端至中間、先底板、后腹板、再板的施工順序和向分段、腹板水平分層、附著式振搗為主、插入式搗固為輔的施工工藝,蒸汽養護的方法和規定;應力應變雙控制確保預應力施工質量的施工技術;採用重物移運器有效移梁的施工方法;漿、封端、橋防水層和保護層施工的一些規定和注意事項等都是對箱梁製造行之有效的施工技術和施工方法,並可為以後類似施工作借鑒。
  3. Abstract : by means of the basic climatic principle and the local astronomical parameters the optimal dip angle, maximum wind pressure borne by the roof material, the depth of the cold - proof ditch and the suitable distance between the greenhouses in chengdu area are calculated

    文摘:應用氣侯學基本原理,當地天文參數與氣候資料,計算了成都地區節能日光溫室採光最佳傾角,覆蓋材料承受最大風,防寒溝深度及溫室間適宜距離。
分享友人