施工中 的英文怎麼說

中文拼音 [shīgōngzhōng]
施工中 英文
under construction
  • : Ⅰ動詞1 (實行; 施展) execute; carry out 2 (給予) exert; impose 3 (施捨) give; hand out; best...
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • 施工 : be in the process of construction; be under construction; build; construction
  1. Tbm roadway ripping machine used in adit construction

    巖巷掘進機在平峒施工中的運用
  2. This thesis tries to solve the problems in the design and construction of jinping cascade 2 hydropower station. a typical section is selected to analysis seepage, seepage control and fem numerical simulation. the influence of different plans of excavation and support on seepage field of subsurface water and stability of adjoining rock are studied. the homologous support pattern is suggested according to the research results

    本文就錦屏二級水電站(一期)深埋長隧洞的設計和施工中面臨的一些問題,選取隧洞的一個典型斷面進行滲流、滲控分析和開挖及支護的有限元數值模擬,從而就深埋隧洞不同的開挖及支護方式對地下水滲流場及圍巖穩定性的影響和所應採取的支護措等方面進行了探索、研究。
  3. The transplanting technology of big tree in botanical garden construction

    園林施工中大樹的移栽技術
  4. ; 1. the trend of the development of burden and light hanging basket in the cantalever construction of continuous rigid frame bridge has been prospected, the roof truss and cable - state composite hanging basket also has been designed by analyzing and comparing with other ones. 2

    對大跨度橋梁懸臂澆築的各種形式掛籃藝進行了比較和總結,對連續剛構橋懸臂澆築掛籃施工中重載輕型的發展趨勢進行了展望,提出了一種用於解決重載輕型懸臂澆築的新型桁架斜拉式組合掛籃,並進行了可行性分析計算和設計。
  5. ( 4 ) the instability problem of the columniation supporting was solved in the construction of side - span. ( 5 ) the circle - steel nip - patch anchor was applied for the thread - snap of the prestressed crude steel wire, the double facility anchor was used for deeling with the slip - wire of steel wring

    ( 4 )在邊跨直線段施工中,採用一端設立柱另一端吊掛在已合攏梁段上的梁式膺架,解決了支柱支承在古錯落體上的不穩定問題。
  6. This paper introduces the construction technology of the super high - rise building with the frame - core tube structure, analyzes on the defects existing in the construction process, and advances some matters that should pay attention to during the constructing

    介紹了超高層框架?核心筒結構技術,分析了過程存在的缺陷,提出了施工中需注意的事項。
  7. Abstract : duri ng concrete deep well constructi on , because of thediffi culti es i n engi neeri ng geographi cal conditi ons , the ordi nary bilateral hydrauli c sli di ng formwork technology can not be adopted. therefore , an unilateral sli di ng formwork technology lifted by chai n block method can beappli ed to advantage and better solved the proble m

    文摘:在混凝土深井施工中,由於受地理環境的限制,不能內外安裝模板時,難以應用一般的液壓滑模技術,而採用單面模板、鏈條葫蘆提升滑模藝,可較好地解決這一問題。
  8. And the paper analyzed the energy cost according to the value showed on ammeter, then linked to the former analyses presented the optimal running condition was 20 heat exchangers. then the paper presented some technical requires about cybernation of the system and compared water - water gshp air conditioning system with air source heat pump air conditioning system from economy

    本文還從程上對該系統進行了控制上的一些要求以及同風冷熱泵進行了經濟和效果兩個方面的分析比較,最後從程應用的角度對施工中的一些技術要求進行了針對性的分析,希望能在實際起到一定的作用。
  9. Application of diamond drilling to the detailed investigation in bouldery formation for liumei bridge

    金剛石鉆進在流美大橋礫卵層詳勘施工中的應用
  10. However, as a result of numerous steps in operation, large obstacles of project condition, and disunion in present design regularities, control blasting technology is hardly techno - communicated, and the study progeny is hardly applied to other project practice

    由於爆破繁瑣零亂,受程具體條件的制約大,再加上目前爆破設計規范不統一,控制爆破設計難以進行技術交流,研究成果也很難推廣應用到其它爆破施工中
  11. Application of numerical calculation into draft tube construction

    數值計算在三峽電廠尾水管施工中的應用
  12. Study of high - pressure rotary jet grouting in inclined shaft construction crossing through drift sand ground

    高壓旋噴在斜井井筒過流沙層施工中的技術研究
  13. The controlling parameters for smooth blasting in qin - ling zhongnanshan tunnel project are optimized according to the fundamental principle of smooth blasting, considering the minimal resistance, coefficient of embrasure density, coefficient of non - coupling, density of dynamite and rate of exploding. the efficiency of this method has been analyzed and justified by the high speed and good quality of the project

    根據光面爆破的基本原理,從最小抵抗線、爆眼密集系數、不耦合系數、線裝藥密度、爆破進尺等幾個方面確定秦嶺終南山隧道光面爆破主要參數的選取,分析了該隧道鉆爆設計在隧道施工中的運用取得的成效,提高了進度,同時也保證了質量。
  14. Application of modified asphalt and sma aggregate in the construction of express highway

    混合料在高速公路施工中的應用
  15. The analysis and protecting of appearing temperature crack in the process of large volume ferroconcrete project

    大體積鋼筋混凝土施工中溫度裂縫的分析與防治
  16. The dynamic characteristics of wharf piles subjected to lateral load is analyzed, used the dynamics theory. it gives an analysis and research to the functional mode of wharf foundation pile under flood tide torrent

    論文對水平荷載下碼頭基樁的動力特性進行分析,用振動力學理論對碼頭施工中的基樁進行動力分析。
  17. Due to complex and varied geological conditions for 4 headrace tunnels at zipingpu project, real time monitoring technique was used during informatization construction according to new austrian tunneling method, system observation for typical sections was conducted by following in - situ construction, based on which inverse analysis for rock mechanics parameters was conducted

    針對紫坪鋪程4條引水發電隧洞復雜多變的地質條件,採用新奧法隧洞信息化施工中倡導的實時動態監測技術,跟蹤現場進行了典型斷面的系統觀測,在此基礎上進行了圍巖宏觀力學參數的反分析研究。
  18. This article comtined the practice of the projtct of jiaojiang bridge and analyzed strand wire with high strength and low laxation, the anchorage system, the tentioned technice in the construction, and the principle of anchorage

    摘要本文結合椒江大橋程實踐,分析了國產高強度低鬆弛鋼絞線和預應力錨固體系,在施工中的張拉藝、錨固原理。
  19. Analysis on the application of manual hole - digging and perfusion stake

    淺析人挖孔灌注樁在施工中的應用
  20. Effect of temperature control on tunnel construction in permafrost

    溫度場控制在多年凍土隧道施工中的作用
分享友人