施工區 的英文怎麼說

中文拼音 [shīgōng]
施工區 英文
construction area
  • : Ⅰ動詞1 (實行; 施展) execute; carry out 2 (給予) exert; impose 3 (施捨) give; hand out; best...
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • : 區名詞(姓氏) a surname
  • 施工 : be in the process of construction; be under construction; build; construction
  1. This paper introduces construction technique and method of asphaltum concrete surface in a construction section of reruan road in songbei district of harbin city

    本文介紹了哈爾濱市松北新熱源路道路程某路段瀝青混凝土路面面層藝和方法。
  2. To avoid the retardation of flood water, improve the discharging conditions and reduce flooding frequency and flowage damage on flood retarding basins, huai river commission made a decision to adjust and regulate the middle courses of huai river. the authorial thesis is based on the main part of huai river flood - protection planning, i. e., the flood - protection planning of huai rivers middle courses. author of thesis participated in the drawing up and the administrating of the plan

    為了擺脫中、小洪水行洪不暢,減少行、蓄洪在中、小洪水條件下的行洪機遇,淮河水利委員會在淮河流域總體防洪規劃中,決定重點解決淮干中遊河道防洪問題,論文作者親自參與制定了淮河中、上遊河道防洪規劃制定作,並組織、領導規劃中各項骨幹程的建設,前後數年之久。
  3. The method of close water test has been used for a long time, so richer experience has been achieved. however, it not only takes pains and time, but also consumes raw materials during the close water test because of miscellaneous working procedures such as bricklaying in the two ends of pipe, water - repellent layer plastering, maintaining and water offletting, brick - block backouting after the test, especially in the region short of water and some drainage pipe with prop - pipe construction. in order to satisfy the fast development of municipal construction, new detection methods should be developed

    閉水試驗方法因其應用時間較長,目前已積累了較豐富的經驗,但在閉水試驗時,管道兩端砌築磚堵、抹防水層、養護、灌水浸泡,以及試驗后的放水、磚堵拆除等繁雜序,不僅費、費時,而且消耗原材料,尤其是在缺水的地以及頂管的無壓管道,這些矛盾更加突出;因此,為滿足迅速發展的市政建設需要,有必要探索新的檢測方法,閉氣試驗就是其中一種,但是閉氣試驗目前還不完善,有待于進一步深入研究。
  4. Where the building lot for a building and connected facilities in a hot spring area is subject to a restriction requiring the installation of a pedestrian footpath to be set back from the building line or the side of a roadway within the building lot, the city / county ( municipal ) government with due jurisdiction shall consider the particular situation of the hot spring area in setting the principles for review of the setback distance or exemption from setback in accordance with article 263, paragraph 2 of the building design and construction section of the building technical regulations

    溫泉建築物及相關設之建築基地,受應自建築線或基地內通路邊退縮設置人行步道之限制者,直轄市、縣(市)政府應考量溫泉特殊情形,依建築技術規則建築設計編第二百六十三條第二項規定,就退縮距離或免予退縮,訂定認定原則審查。
  5. But the west area is mainly coteau, in a highway there are many bridges, so the construction is very difficult, which results in the high expense

    而西部地多為山,山高谷深,地勢險峻,建一條公路橋梁較多,而且難度大,造價高。
  6. Directed against the problem on confirming vertical bearing capacity of large diameter cast - in - place pile in the west of coteau area of yunnan province, the paper, analyses the influence degree of the variety of soil physics and mechanics property in area geology condition on bearing capacity of pile foundation, through 5 piles " loading test ; the influence degree of construction technics on bearing capacity of pile foundation under the influence of every exterior factors ; the influence degree of grouting injection around the pile shaft on bearing capacity of pile foundation

    本文針對滇西山大直徑灌注樁豎向承載力確定存在的問題,進行了5根試樁的靜載荷試驗,分析了域地質條件下土的物理、力學性質的變化對橋梁樁基承載力的影響程度;地下水對樁承載力的影響程度;各種外部因素影響下,樁的藝對樁承載力的影響程度;通過在樁體周圍土中注漿對樁承載力的影響程度。
  7. Discussion on safety excavating method of coal and gas outburst danger zone

    淺談煤與瓦斯突出危險掘進安全
  8. The high geotectonic stress at the construction region and the activity subsurface water will have important effects on construction and operation

    隧洞穿越高地應力,且施工區活躍的地下水對隧洞及日後的安全運行有著重要的影響。
  9. Tunnel construction is very difficult hi region with high geotectonic stress and high subsurface water pressure. few deep - lying tunnels are constructed in civil conveyance and hydropower engineering up to now

    特別是對在高地應力、高地下水位域的隧洞建設,其難度更大,在國內的水利水電程建設中並不多見。
  10. By the large quantity of indoor and field soil mechanics test, this paper investigated physics and mechanics property of xigeda stratum and xigeda compounding filling, profoundly and systematically studied on shearing strength, cbr ( including indoor cbr and field cbr ) and intensity feature of xigeda compounding filling. the new achievement and cognition as follows : ( 1 ) cbr value is decided by moisture content and mudstone content of xigeda compounding filling. the filling material can satisfy minimum intensity standard of express highway when mudstone content is less than some fixed value, ( 2 ) this paper established field cbr standard value which can synthetically evaluate the filling material nature and field compaction degree. ( 3 ) the optimal compacting mean of xigeda compounding filling is hard oscillation first and weak oscillation later, not traditional way which is weak oscillation first and hard oscillation later. ( 4 ) this paper put forward the conception of optimum moisture content in construction different from optimum moisture content of indoor impaction

    本文以昔格達填料強度特徵為研究對象,通過大量的室內及現場試驗,從昔格達地層巖組的物理力學性質、昔格達填料的物理性質入手,對昔格達填料的抗剪強度、室內承載比及現場承載比特徵進行了較系統地研究,獲得了如下認識及進展:昔格達混合填料承載比值受填料含水量及其中泥巖含量的影響,當泥巖含量小於一定值時,昔格達混合填料具有較高的承載比值,能夠滿足高速公路對填料的最低強度要求;建立了綜合評判昔格達填料性能及現場壓實效果的現場承載比( cbr )標準;對于昔格達填料而言,最佳的碾壓方式為先強振后弱振而不是傳統的先弱振后強振;提出了與室內擊實最優含水量相別的最佳含水量的概念。
  11. This procedure can imitate the single well pumps water the chronometer calculates at all point water level in district declines deep with horary variety ; study the sport law of the rivers ; solve definitely flow draw water issue wanton boundary the wells of termses, predict that dives under water in the location, guide and construct and excavate the progress, appraise the rationality of the precipitation scheme

    此程序可以模擬單井抽水時計算域各點水位降深隨時間的變化,研究水流運動規律;求解任意邊界條件下的井定流量抽水問題,預測潛水位,指導開挖進度,評價降水方案的合理性。
  12. Construction technology of drilled pile in karst area

    巖溶地大直徑鉆孔樁技術
  13. Construction of karst pile foundation for lushui bridge

    巖溶地橋梁基礎鉆孔樁技術
  14. As the increase of domestic high - rise buildings, more and more deep foundation trench supporting constructions have come into existence. among the general geographical condition of the urban district in qingdao, most of regions, which mainly consist of strong de composed rocks, are in quite good condition. except for the sandy soil and oozy soil along sea sides. but the development of rock cracks and breaking zones and unstable lamprophyre still exist, so blasting is needed during constructions of foundation trench. blasting have bad influence on the stability of slopes. moreover. the slope - liding has happened for several times, so the engineering project of foundation trench attracts more attention of people

    隨著國內高層建築的發展,深基坑支護程越來越多,綜合青島市的地質狀況,除海邊有砂性土及淤泥軟土外,大部分地域巖土條件相對較好,多以強風化巖為主,但巖石裂隙發育,間或有斷裂帶和穩定性極差的煌斑巖穿插其中,基坑時需要爆破,對邊坡的穩定造成了不利影響,加之連續出現的幾次滑坡失穩事件,基坑支護程越來越引起了各方面的重視。
  15. In this paper, research is emphasized on the situation of slope protection in shaanxi areas, analyses the engineering and economic effect of all kinds of slope protection, compare the traditional protection with the new, puts forward the protection principle that should be followed in shaanxi areas, study the destruction mechanism and stability analysis of high slope in ocher area, and puts forward effected and economic new protection methods

    本文對陜西地的邊坡防護狀況進行了研究,分析各種防護型式的防護效果及其經濟效益,並結合國內外的防護新技術,對傳統防護型式和新型防護型式進行了對比分析,提出陜西地在以後的防護程中應該遵循的原則,並研究了黃土高邊坡的破壞機理和穩定性判斷的方法,提出巖土邊坡有效、經濟的新型防護措及其藝。
  16. To avoid manual labor of chiseling - grossness, in the area of second - stage concrete construction, permanently non - removed metal molding boards nets are used as molding boards of first - stage concrete. substitution joints of reinforcing steel bars for traditional electric welding and usage of equipments for joints of reinforcing steel bars efficiently improve strength of junctions and rate of connecting reinforcing steel bars, and safety of construction and stability of quality, and greatly reduce cost. it ' s possible that three gorges project become top - ranking project in the world by study on systems engineering of high - strength concrete construction

    混凝土縫面處理採用高壓水流沖毛技術,大大提高了效,減少了倉面污染;模板程大量採用定型鋼模板技術,提高了壩體混凝土成型質量和程進度;在二期混凝土施工區域,為免除人鑿毛勞動強度,採用永久性免拆金屬模板網作為一期混凝土模板;鋼筋連接改進傳統的電焊連接方式,採用大量採用鋼筋接頭機械連接技術,有效提高了接頭強度和鋼筋連接速度,安全性大大加強,質量穩定性有效提高,經濟成本大大降低;三峽二期程持續高強度混凝土系統程的研究,使三峽程成為名符其實的「世界一流程」成為可能;三峽二期程混凝土溫控綜合技術的應用,有效降低了壩體混凝土溫度的產生;混凝土表面處理及裂縫處理技術的應用,提高了建築物的整體性和耐久性。
  17. The domestic water supply works of xiluodu hydropower station undertakes the water supply for the domestic use and the fire fighting within the site during the construction, of which the design is made under the " sanitary standard for drinking water quality ( 2001 ) " with the water supply capacity of 20000 m ^ 3 / d

    摘要溪洛渡水電站期生活供水程承擔電站施工區內的生活、消防等供水任務,設計供水規模為20000立方公尺/ d ,供水水質標準按《生活飲用水水質衛生規范》 ( 2001年) 。
  18. Carry out regularly safety checks and safety audits on all construction areas in nanjing site

    負責對瓦克南京現場所有施工區域進行安全檢查和稽核。
  19. There are many sorts of the modern dredgers, to adapt the various working regions, and soil conditions etc. it is inevitable to select to build the large self - propelled trailing suction hopper dredgers for shanghai channel bureau, because of the developments of the big - scale ports and channels at home and abroad, and the bad working conditions offshore, and the business direction

    現代挖泥船有各種類型,它們適用於不同的施工區域與土質等況條件。世界與國內港口航道的發展愈來愈體現出規模大,向外海推進和條件惡劣的特徵,從上海航道局的企業經營定位出發,建造大型自航耙吸挖泥船是首選方案。
  20. When used as an emergency tripod, it is very easy to set up by applying same method as using an umbrella

    它可以在夜間施工區被用作告警燈,或在汽車事故域進行警示。
分享友人