施工安裝圖 的英文怎麼說

中文拼音 [shīgōngānzhuāng]
施工安裝圖 英文
construction and erection drawing
  • : Ⅰ動詞1 (實行; 施展) execute; carry out 2 (給予) exert; impose 3 (施捨) give; hand out; best...
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • : Ⅰ名詞1 (服裝) dress; outfit; attire; clothing 2 (演員的化裝品) stage makeup and costume Ⅱ動詞...
  • : Ⅰ名詞1 (繪畫表現出的形象; 圖畫) picture; chart; drawing; map 2 (計劃) plan; scheme; attempt 3...
  • 施工 : be in the process of construction; be under construction; build; construction
  1. The author considers as follows : ( 1 ) we should understand how to define the price of architecture products the cost of engineering and the price of engineering, we should compare the connotations of plan price, float price and market price, we should clarify how engineering cost and architecture installation engineering cost are formed and what is the difference between balance price and final accounts price ; ( 2 ) through analyzing and comparing the account bases and composing contents of enterprise individual production cost and social average production cost, analyzing from the design mechanism ' s function of auction and bid and the purpose of actualizing auction and bid, we can confirm that the foundation that the titles are weeded when judged is enterprise individual production cost, not social average production cost ; ( 3 ) the author considers there is diverge between shop drawing budget based on ration and auction and bid, carrying out bill quantity of construction works can advance the formation of cons truction - product market price, also is the outset and integrant route to close international, but though code of valuation with bill quantity of construction works has a lot of advantage to advance the form of architecture market price, we also see it has lack and it should be amended

    針對以上問題,筆者認為:應該了解建築產品價格與程造價、程價格是如何界定的、比較建築產品的計劃價格、浮動價格與市場價格的含義,搞清楚程造價的構成和建築程費用的構成以及竣結算價格與決算價格的區別;通過分析、比較建築產品的「社會平均生產成本」和「企業個別生產成本」的計算依據和構成內容,從招標投標的設計機制的功能和實招投標的目的來分析,確認在評標中剔除低於成本價標書的依據是投標企業的個別生產成本,而不是社會平均生產成本;筆者認為以定額為計價依據的預算方法與招標投標之間存在悖論,程量清單計價的推行是對建築產品市場價格形成改革的推進,也是建築產品價格形成方式與國際接軌的開端與必經之路,但是也必須認識到雖然《建設程量清單計價規范》具有推進建築市場價格形成的諸多優勢,但仍存在不足與需要完善的地方。
  2. Construction and erection drawing

    施工安裝圖
  3. Answer : preparative job includes : understands workplace one, the moving circumstance of 2 equipment, this job has with moving equipment without direct connection, have the job that cooperates without need with other team and group ; makes working priority discipline and the blemish that prepare to solve and weak point ; the staff member makes clear to divide the work and be familiar with the concerned data such as blueprint and test gauge cheng ; should be had the blueprint that agrees with actual state, record that examines last, newest rectify spare parts of the instrument that decides requisition, test gauge cheng, qualification, machine parts or tools kept in reserve, tool and join lead to wait ; is a few righter important equipment, especially complex protector or couplet jumps loop protector, should weave test program, working controller should fill in ticket of protection safety precaution, examine and approve via technical chief, just can carry out

    答:預備的作包括:了解作地點一、二次設備的運行情況,本作與運行設備有無直接聯系,與其他班組有無需要配合的作;制定作重點項目及預備解決的缺陷和薄弱環節;作人員明確分並熟悉紙與檢驗規程等有關資料;應具備與實際狀況一致的紙、上次檢驗的記錄、最新整定通知單、檢驗規程、合格的儀器、備品備件、具和連接導線等;對一些重要設備,非凡是復雜保護置或有聯跳迴路保護置,應編制試驗方案,作負責人應填寫繼電保護全措票,並經技術負責人審批,方能實
  4. Based on practical engineering experience, a suit of template for project scheduling system including the commonness of different engineerings has been customized. in addition, some special functions have been added to it. they are the updating of the completion of tasks, the relationship with the construction ration, data exchange between the scheduling system and the layout system of the drawings and the picturing of the earned curve, etc. besides, the project database has been designed in accordance with the theory and criterion for database design

    本文根據現場程經驗,總結不同程中存在的共性,在project2000基礎上定製開發了電力進度計劃模板,並且在該模板上增加了一些其特有的功能,包括:任務的更新,與定額相聯系,與平面布置中數據的交互以及利用贏得值原理繪制贏得值曲線等。
  5. The word " work " means the engineering, design ( including, but not limited to, primary design, extended preliminary design and preparation of detailed design and construction drawings ), construction ( including, but not limited to, early work, site setting out, earth back filling works, sub - structure works, civil works, above - ground works, installation and testing ) and construction management services to be performed by the development manager and subcontractors pursuant to the provisions of this contract and a written authorization, and as modified from time to time in accordance with the provisions of this contract, and includes all designs, drawings, plans, means, methods, techniques, sequences and procedures and, unless expressed to the contrary in this contract, all materials, tools, utilities, labor, equipment services, licenses, permits, tests, warranties, guarantees, transportation and other items and facilities of every kind necessary for the complete performance of this contract

    程」一詞應指由開發管理人和分包商根據本合同的規定和書面授權書執行的程、設計(包括但不限於初步設計、擴初設計以及深化設計的準備) 、(包括但不限於前期作、現場布局、回填土程、次結構程、市政程、地上程、和測試)及管理服務,該等服務可根據本合同的規定被不時修訂,並包括所有的設計、紙、計劃、手段、方法、技術、序和程序以及,除非合同中有相反規定,所有的材料具、設人、設備服務、執照、許可證、測試、保證、擔保、交通以及其他為圓滿執行本合同所需要的各種物品和設
  6. Shanghai lequn advertising co, s ltd, it is a professional production years produced neon lights, small and large outdoor advertising, exhibition design exhibition, graphic design, indoor decoration design and construction, all kinds of domestic and foreign advertising agency network, web design and other kinds of advertising agencies, set design, production, publishing, installation into an integrated entity specialized advertising units

    上海樂群廣告有限公司是一家多年專業生產製作霓虹燈、戶外大小型廣告,展覽展會設計製作,文設計製作,室內潢設計及,代理國內外各類廣告、網路、網頁設計製作等各類廣告代理,集設計、製作、發布、於一體的綜合性專業化的廣告實體單位。
  7. Before embedding of the foundation and embedment parts, technical clarificaiton will be don by the engineer in charge and the working group on the basis of design drawing 、 installation documentation 、 design amendment notification and supervision nofification 、 the principle of no impeded the progress schedule 、 the requirement of the relevant regulations and specification, setting out the embedment locaiton applied by the theodolite 、 water level and tape after that carrying on the embedment process and the record will be well kept

    以設計紙、設備資料及設計修改通知單和監理通知單為依據,按規程規范的要求,以不影響程進度為原則,由主管程師對班組進行技術交底,利用經緯儀、水準儀和捲尺等測量具放點定位進行基礎及預埋件預埋並做好預埋記錄。
  8. The theory setup chiefly consists of : systems analysis, project scope management, project procurement management, contract administration, installation diagram management, project joint management, project time management, project quality management, project cost management, project human resource management & project communication management, building completed management, project evaluation, after - sales service management etc.

    該理論體系主要包括:建築企業項目的系統性分析、范圍管理、招投標管理、合同管理、管理、交叉管理、進度管理、質量管理、成本管理、人力資源及溝通管理、竣驗收管理、項目后評價、保修維護管理等。