施工可能性 的英文怎麼說

中文拼音 [shīgōngnéngxìng]
施工可能性 英文
constructability
  • : Ⅰ動詞1 (實行; 施展) execute; carry out 2 (給予) exert; impose 3 (施捨) give; hand out; best...
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • : 能名詞(姓氏) a surname
  • : Ⅰ名詞1 (性格) nature; character; disposition 2 (性能; 性質) property; quality 3 (性別) sex ...
  • 施工 : be in the process of construction; be under construction; build; construction
  1. To avoid manual labor of chiseling - grossness, in the area of second - stage concrete construction, permanently non - removed metal molding boards nets are used as molding boards of first - stage concrete. substitution joints of reinforcing steel bars for traditional electric welding and usage of equipments for joints of reinforcing steel bars efficiently improve strength of junctions and rate of connecting reinforcing steel bars, and safety of construction and stability of quality, and greatly reduce cost. it ' s possible that three gorges project become top - ranking project in the world by study on systems engineering of high - strength concrete construction

    混凝土縫面處理採用高壓水流沖毛技術,大大提高了效,減少了倉面污染;模板程大量採用定型鋼模板技術,提高了壩體混凝土成型質量和程進度;在二期混凝土區域,為免除人鑿毛勞動強度,採用永久免拆金屬模板網作為一期混凝土模板;鋼筋連接改進傳統的電焊連接方式,採用大量採用鋼筋接頭機械連接技術,有效提高了接頭強度和鋼筋連接速度,安全大大加強,質量穩定有效提高,經濟成本大大降低;三峽二期程持續高強度混凝土系統程的研究,使三峽程成為名符其實的「世界一流程」成為;三峽二期程混凝土溫控綜合技術的應用,有效降低了壩體混凝土溫度的產生;混凝土表面處理及裂縫處理技術的應用,提高了建築物的整體和耐久
  2. Neither the bank, its associates, nor any of their directors, officers or employees, shall be liable to the customer for any expenses, loss or damage suffered by or occasioned to the customer by reason of any action taken or omitted to be taken by any one or all of the bank, its associates, their directors, officers, employees or agents pursuant to these conditions or in connection therewith other than as a result of the fraud, wilful default or negligence of the bank, its associates, their directors, officers, employees or agents ; the bank s failure in good faith to honour any stop - payment instructions given by the customer ; the presentation to the bank of any cheque or other payment order which is post - dated ; the bank failing to honour any draft drawn on it by the customer, but the bank shall immediately return such draft to the customer through the normal channels giving the reason for the dishonour ; any loss, damage, destruction or misdelivery of or to the securities howsoever caused unless the same shall result from the negligence of, or theft by, the bank or its associates or any of their directors, officers or employees, in which event the extent of the liability of the bank shall be limited to the market value of such securities at the date of discovery of the loss and even if the bank has been advised of the possibility of such loss or damage ; unauthorised use or forging of any authorised signature as a result of the negligence, wilful default or fraud of the customer ; subject to condition 5. 5, any act or omission, or insolvency of, any person not associated with the bank including, without limitation, a third party nominee or depositary ; viii the collection or deposit or crediting to the custodian accounts of invalid, fraudulent or forged securities or any entry in the custodian accounts which may be made in connection therewith ; any malfunction of, or error in the transmission of information caused by, any electrical or mechanical machine or system or any interception of communication facilities, abnormal operating conditions, labour difficulties, acts of god, or any similar or dissimilar causes beyond the reasonable control of the bank and notwithstanding paragraph, the error, failure, negligence, act or omission of any other person, system, institution or payment infrastructure

    本行其聯系人士其各董事高級人員或雇員均毋須向客戶因以下理由而使客戶蒙受或產生之任何開支損失或虧損負責: i本行其聯系人士其董事高級人員雇員或代理人根據此等條件採取或遺漏採取有關之行動,但由於本行其聯系人士其董事高級人員雇員或代理人之欺詐行為故意失責或疏忽所造成者除外ii本行本真誠地未依約替客戶執行止付指示iii向本行提交任何遠期支票或其他付款指示iv本行未兌現由客戶開出之匯票,但本行將立即透過正常渠道將該匯票退回客戶,並解釋拒付之理由v無論如何導致之任何證券之損失損毀毀壞或錯誤交付除非上述各項乃因本行或其聯系人士或其任何董事高級人員或雇員之疏忽或盜竊所引致,而在該等情況下,本行的責任將只限於在發現損失當日該等證券之市值,以及即使本行已獲知該等賠償之vi因客戶之疏忽故意失責或欺詐行為而導致的任何偽造授權簽名或不獲授權使用該簽名vii在第5 . 5 a條之規限下,與本行無關者之任何行動或遺漏或無償債力包括但不限於第三者代名人或寄存處viii代收或存入或貸存於保管人賬戶的無效偽造或假冒證券或在保管人賬戶記入與此有關之賬項ix任何電子機械或系統失靈或因該等機件或系統產生的資料傳送錯誤或任何通訊設之終斷不正常操作情況勞問題天災或非本行所合理控制之任何類似或非類似原因及x盡管有第ix項,任何其他人系統機構或付款設的錯誤故障疏忽行動或遺漏。
  3. Through adding low viscidity hpmc, workable performance of the dry - mixed mortar can he greatly improved, and this dry - mixed mortar can well solve the crack problem of wall

    通過摻入低粘度的羥丙基甲基纖維素后,砂漿的和易得到了極大的改善,以較好地克服新型墻材出現的墻體裂縫等問題。
  4. In the brief introduction to geographical information system ( gis ), this dissertation proves that by combining reliable management with gis technology, presents a method which built the power structure model and math calculation model by using spatial data in a good interface between computer and user. this dissertation makes a number of target for calculating the distribution system, mainly aimed at circumstances which have an effect on power station repair, switch breaker, type of t connection, and double lines supply via the usage of system reliability calculation. at the same time, it provides the projected estimatio n when power station or transmission line will be added into the power system, and furnishes the theoretical information that the professional needs for power structure programming, design and equipment management

    通過建立輸變電設管理信息系統( mis ) ,真實地反映出油田電網輸變電設的運行管理現狀,為網路計算提供靠的計算依據;在簡述地理信息系統( gis )技術的基礎上,論證了管理與電力gis技術結合的,創立了在簡潔的人機圖形界面下利用空間數據建立網路結構模型及計算模型的方法;通過建立網路計算系統,進行了計及變電所檢修影響、切換開關、 t接點及雙回線供電情況下的指標計算分析,對油田電網及變電所(線路)的改(擴)建方案、增強及接入系統的給予了程評估,為電網規劃、設計及日常的設備管理提供分析決策依據。
  5. But the welding program is complicated and the construction is very difficult so that the welding deformation and welding quality should be seriously controlled

    轉子中心體與支臂連接採用地組焊使轉子支架整體好,夠保證轉子組裝質量,但焊接程序復雜、難度大,必須嚴格控制焊接變形和焊縫質量。
  6. However, it is a prevailing practice in highway projects in our country that the feasibility studies in the preliminary investigation and the appraisal of operation cost in later stage fail to carefully and thoroughly analyze the impact of those indeterminant factors on a proposed project and the probability of those factors. furthermore, in construction period, only those major uncertain factors ( say, wars ) are written in the contract as a part of unpredictable risks so as to rectify the responsibilities of the parties as named in the contract, but the minor factors ( say the change in drawings ) are not singled out but included in other contrast articles

    在國內公路項目前期研究和後期評估運營經濟成本時,只簡單地對一些影響項目的不確定因素羅列出來而沒有認真分析這些不確定對整個項目影響的大小和其發生的大小;在項目實過程(階段) ,只是把一些大的不確定(如戰爭)作為不預見風險成為合同條款雙方分清責任的一部分,而一些小的(如圖紙的變更)一般不單獨列出,而包含在其它合同條款中。
  7. The actual uncovered rock conditions after the excavation show that a series of the optimal designs are correct

    對晚秋初冬趾板混凝土採取有效的養護保溫措質量控制,減少了混凝土裂縫發生的
  8. Another possibility is to use simple on - site fabrication facilities to aid quality assurance and to reduce construction time

    另一種是使用簡單的現場裝配組件製造設備,保證質量並且降低時間。
  9. Firstly, the master zhang binbin ' s tests further verified that the design methods brought forward by the code for design of reinforced concrete high - rise structure ( jgj3 - 2002 ) can not satisfy basic seismic requirement. at the same time, our research group find that some acceptable improved reinforcement arrangement scheme in domestic and foreign researches can not attain satisfying ductility performance

    其中首先通過碩士研究生張彬彬的試驗研究作,進一步證實《高層建築混凝土結構技術規程》 ( jgj3 - 2002 )提出的設計方法不滿足抗震基本要求;同時查明,國內外已提出的某些以接受的改進配筋方案仍未達到較滿意的延
  10. Based on comparison of several technical schemes, the method of sand bedding pre - elevating and step water - filling pre - compressing is adopted. so the dissertation is consist of two parts : ( 1 ) the applicability study for the method of sand bedding pre - elevating and step water - filling pre - compressing, including numerical analyses for the thickness of sand bedding, the consolidation, settlement and stability of foundation, drainage, possibility of foundation liquefaction under seismic loading, et al. ( 2 ) monitoring at construction stage and checking the effect of foundation treatment, including the measurements of the settlement velocity and non - uniform settlement of ring beam under the tank, pore pressures and horizontal displacements in foundation, the pressure distribution at the bottom of oil tank and the strength increase of soils

    通過多種技術方案比較,最終選擇了技術先進的砂墊層預抬高分級充水預壓法,論文作主要由以下兩部分組成: ( 1 )砂墊層預抬高分級充水預壓法的適用研究,其中包括砂墊層厚度、地基沉降與固結度、地基穩定、降水、地震作用下砂土液化的等方面的計算分析; ( 2 )監測與地基處理效果檢驗,其中包括油罐環梁基礎沉降速率與不均勻沉降程度、各分級充水加載階段地基超靜孔壓與深層水平位移、油罐底板壓力分佈及地基土強度增長等方面的實測與數據分析。
  11. Through the analysis of experiments data and designs comparing, we explore the feasibility of working out a high fidelity voltage source and give a practical design of the high fidelity current source. qiang wang ( electronic technology application ) directed by dai zhengang

    在此基礎上,對高保真度的開關電壓源、電流源的研製進行了多方探索,最後在各類改進型方案中,得出程上電流源研製的設計方案和電壓源研製的
  12. Should explore the possibility to develop more housing and support facilities ( schools, hospitals, clinics etc ) along the boundary to enable people who are working across the boundary to spend more time with their family members

    應探討沿邊界設置更多住屋及其他配套設如學校、醫院、診所等設,讓需要兩地作的人士有更多時間與家人共聚。
  13. Application of the mf method normally involves construction of an intermediate column at every 4 meters. on a crossover section, which serves as a passage for train change directions, intermediate columns placed at 4 - meter intervals would block the route of a turning train. therefore, a solution must be found to the problem of location of intermediate columns on crossover sections

    (四)轉轍段( crossover )處以多圓形潛盾作之,由於轉轍段系為提供電聯車換軌功之處,兩軌道間不有任何障礙物,而多圓形隧道環片間每隔四米即需中間柱,于設計上有何解決之道。
  14. Abstract : the attention has focused on quantifying the capability of nondestructive testing ( ndt ) system for guaranteeing structural safety through damage tolerance analysis. a method of reliability assessment for engine blades ndt is presented, which can determine exactly the probability of flaw detection ( pod ) and assess the probability of flaws missed ( pom ) in the engine blades, as well as control the largest size of the flaws missed at inspections with high probability of flaw detection and confidence level. this method also raises the flaw detection probability and prevents the flight accidents caused by the missed flaws in engine blades

    文摘:提出了一種發動機葉片無損檢測分析方法,利用該方法以有效地提高葉片中裂紋(缺陷)的檢出概率( pod ) ,並對裂紋的漏檢概率( pom )進行準確地評估和控制,使因葉片裂紋漏檢而引起發動機故障的降至最低程度,從而確保發動機的安全運行;該方法簡單方便,易於程實和應用。
  15. On the basis of stability analysis, the author takes the k27 + 825 slope from the type of slope which has lest stability as an example. according to its basic feature, the design ueses the choosed best reinforce and control scheme : lattice beam, anchor wire, grouting and abstraction of water. in the course of design, the author takes into account not only reasonable optimize of whole control plan but also local measure such as whether the unstable block will shear from vnlnerable sections when control plan is laid out concretely, in order to reach the goal of reasonable design and effective control

    在穩定分析的基礎上,以邊坡穩定最差的一類中的k27 + 825邊坡為例,結合其自身的特點,用優選出的加固防治方案:框架梁+錨索斗灌漿+排水進行設計,設計中既考慮總體防治方案的合理優化,又充分考慮了加固程的具體布置時是否存在不穩定體從錨索或框架梁的薄弱部位剪出的等一些細部措,以達到合理設計,有效及經濟治理的目的。
  16. For the needs of second - term project for pudong airport there is possibility to construct a tunnel of serving driveway under the operating runway, but it s obviously of great difficulty, and nowdays there are few such projects for reference, so it is urgent to carry out the research to make sure of the feasibility for the construction based on the analysis of geologic information, cross section of the line and restriction of construction, in this paper three construction schemes and the effects of each scheme were analysed : cut and cover method, pipe roof culvert box advancing method. shield driving method

    摘要浦東國際機場二期程建設存在著在運營跑道下實地下穿越的,在運營跑道下實地下穿越難度很大,而目前國內外軟土地區在跑道下實地下穿越程很少,因此論文通過研究分析了服務車道地下穿越跑道區域的及方案。
  17. " a feasibility study is being conducted on the development of the weif. the study addresses the engineering feasibility, environmental acceptability, health impacts, contract arrangement, site selection, preliminary design and cost estimates

    發言人補充:發展廢物焚化源回收設研究現正進行,研究內容包括程上的行程度,環保上的接受程度、健康影響、合約安排、選址、初步設計及費用估計。
  18. A spokesman for the planning, environment and lands bureau said today friday. " a feasibility study is being conducted on the development of the weif. the study addresses the engineering feasibility, environmental acceptability, health impacts, contract arrangement, site selection, preliminary design and cost estimates

    發言人補充:發展廢物焚化源回收設研究現正進行,研究內容包括程上的行程度,環保上的接受程度健康影響合約安排選址初步設計及費用估計。
  19. So, to summarize and analyze it ' s implementation method, will give other airlines some revelations and help, improve project success probability. the author of article is project manager of cswa m & e system

    因此,對西南航空公司飛機維修程系統項目實方法進行總結和分析,將對其他航空公司實飛機維修程系統提供啟示和幫助,提高項目實成功的
  20. In a research of as - cast concrete applied in rail transit elevated station, this paper mainly discusses the design, construction and cost of as - cast concrete and expresses an optimistic view about its future application in urt elevated station

    針對清水混凝土在高架車站應用的進行了研究,提出了清水混凝土在高架車站的應用范圍、設計和的重點內容以及應用前景。
分享友人