施工布置 的英文怎麼說

中文拼音 [shīgōngzhì]
施工布置 英文
construction plan
  • : Ⅰ動詞1 (實行; 施展) execute; carry out 2 (給予) exert; impose 3 (施捨) give; hand out; best...
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • : 動詞1. (擱; 放) place; put; lay 2. (設立; 布置) set up; establish; arrange; fix up 3. (購置) buy; purchase
  • 施工 : be in the process of construction; be under construction; build; construction
  1. During the second phase of the east lake lakeshore scenery construction project, an approach was taken to establish a public domain including a cha - gang lose - water " observation platform, bathing beach and parking lots. the design and analysis of all these elements have been addressed in the following article as well as other components such as roadway alignment, installation, water bank stabilization, planting, street lighting, sculptures and accessible paths for disables. the proposed landscape will ensure a systematic visual system with enhanced cultural, artistic, and unique characteristics, and properly arranged facilities along the shoreline

    本文通過東湖環湖景觀建設綜合整治二期程中的茶港親水平臺、沙灘浴場及停車場的道路和景觀設計,對東湖環湖的路面、鋪裝、駁岸、綠化、亮化、燈飾、小品、殘疾人通道等多個方面進行了分析,以期建立一個統一有序的視覺體系,增強東湖環湖旅遊線的文化性、藝術性和獨特性,合理安排配套設,使之成為一條步移景異,集秀、翠、幽、雅為一體的湖畔風光游覽路。
  2. It elucidates the grade and layout of the construction diversion structures, testifies the technical rationality and economic advisability that the alternative of the cofferdam uses to dam up the discharge ( p = 10 %, q = 275. 2m3 / s ) during the post - flood period, was made by hydraulic calculation, structural design, investment comparison, progress analysis and investment risk analysis

    文中說明了導流建築物的等級、水。通過水力學計算、結構設計、導流方案投資比較、進度分析和投資風險分析,說明了四湖溝水利樞紐程採用圍堰擋汛后時段洪水導流方案的合理性和經濟性,為決策提供理論依據。
  3. The software ansys6. 0 is used to analysis the stability of the state after construction of tongwamen bridge, linear method is used in analyzing the finite element model of the bridge, the coeffient of stability of different state after construction is given. on the basis, the effect of different factors such as the arrangement of lateral brace, the sloping angle of arch ribs, the stiffness of bridge deck system, the effect of non - orientedly conservative loadings of the hanger and tie bar etc is discussed. the different coefficients of stability of changing these factors are given, so the factors that are vital to the lateral stability of x - type arches are found, and the rationality of the methods taken to enhance the lateral stability of tongwamen bridge is evaluated

    本文應用有限元分析商業軟體ansys6 . 0 ,採用線彈性方法,通過對該橋的空間有限元模型進行穩定性分析,得出其成橋運營階段各種況下的穩定安全系數。在此基礎上,本文還通過有限元模型分析,就拱的矢跨比、吊桿(立柱)的非保向力效應、橋面系的剛度、橫撐形式、拱肋側傾角等因素對該橋整體穩定性的影響展開探討與研究。文中給出了各因素變化情況下的穩定安全系數,指出了對鋼管混凝土提籃拱橫向穩定性有顯著影響的因素及其合理變化范圍,並對銅瓦門大橋提高橫向穩定性的措的經濟合理性進行了分析。
  4. The main parts of this paper is now be showed in the following : 1 ) the development for the compiling of the schedule had been finished 2 ) the realization of the management function for the schedule system, the base managements can be processed with the management tools. 3 ) the data taken and expressed from the drawing layout system, in the schedule system. 4 ) the data transfer from the schedule system to the drawing layout system

    本文的研究作主要包括以下幾個方面: 1 )適合電廠程的進度計劃編制功能的開發完成; 2 )實現電廠程的進度計劃管理功能,可以利用進度計劃編制系統的管理具對進度計劃進行基本的管理; 3 )實現在進度計劃定製系統中對平面系統中的數據的讀取和表達; 4 )完成進度計劃數據向平面系統的傳送。
  5. The technological innovation and optimum design were implemented by the design organization during the working drawing period, as a result, the new technology of separated floor for draft tube bend is applied, and the optimized arrangement plan of structure is more compact, the structure form is more rational, rate of progress is accelerated, about 1. 37 hundred million yuan is saved, which is of significant general benefits

    詳圖階段,設計單位根據創建節約型社會的宗旨,積極開展一系列技術創新和優化設計作,並首創了廠房尾水管肘管段分離式底板新技術,優化設計后樞紐更加緊湊,建築物結構形式更為合理,加快了進度,節約程投資約1 . 37億元,綜合效益顯著。
  6. This paper draws lessons from the design experiences of domestic large scale power station which uses gis technology and combines with the 330kv gis design of the gong bo xia and li jia xia power station that are designed the northwest investigation design and research institute. this paper not only advances some common questions about gis such as selecting model and demonstrating, compiling technology standardization of the device, layout and design, test, enviromental protection and maintenance, etc, but also supplies effective solution commonly used in engineering

    本論文借鑒國內採用gis技術的大型電站的設計經驗,結合國家電力公司西北勘測設計研究院承擔的公伯峽、李家峽電站330kvgis設計,提出gis在選型論證、設備技術規范書編寫、設計、試驗、環保維護等方面的常見問題,並提供在程應用中較常用的有效的解決措
  7. The main functions of the module for initializing drawing environment are to set up the scale. linetype. breadth and frame of drawings according to the characteristics of the general arrangement drawing to passenger shippings. the main functions of the second module is to establish and extend graph library, retrieve from graph library and output graph blocks. using the parameterization design method to design interactively and modify automatically graphs of the local cabin are the tasks of the third module. in the help module, the drawing specifications of passenger shipping are integrated, such as equipments of anchor and moor, arrangement of cab, cabin and baggage, measures to come through and ration of passengers, etc. there are some advantages in the proposed system, such as friend interface, operation easily, drawing conveniently and modification automatically

    其中初始化繪圖環境模塊主要針對客船總圖繪制的特點來完成比例、線型、圖幅和圖框的設;客船總圖圖庫模塊主要完成圖庫的建立和擴充、圖庫的查詢以及圖塊的輸出;局部艙室參數化設計模塊採用參數化技術完成對局部艙室圖形的自動修改以及交互設計;客船規范幫助模塊則集中了一些武漢理大學碩士學位論文客船繪制規范,如錨泊及系泊設備、駕駛室、乘客艙室及行李的放、脫險措及乘客定額等規范。
  8. Because of the complexity of calculation result data, and in order to simplify the analysis of results, this paper only provides annual temperature isoline map of february, may, august and november during construction, temperature isoline map of the first, fifth, tenth, twentieth and thirtieth year during operation, duration curve of temperature and stress of typical point at different elevation, the maximal stress distribution along dam height, point at different elevation, the maximal stress distribution along dam height, and the maximal and minimal temperature and the maximal tensive stress and its position of every month

    因計算結果數據量非常大,為便於成果分析,本文僅給出期每年2 、 5 、 8 、 11月份和運行期第1 、 5 、 10 、 20 、 30年的溫度等值線圖,壩體不同高程典型點溫度和應力歷時曲線圖,最大應力沿壩高分圖,逐月最高、最低溫度和最大拉應力值及相應的位等。
  9. In the construction peak, always leaked the protector the frequent trip to affect the work site normal construction seriously, regarding this kind of situation besides the enhancement job location management, to leaked the protector according to the job location actual situation to carry on the reasonable arrangement, both satisfied the security which the work site used electricity, and might reduce the leakage protector the frequent trip, for normal construction creation good power supply condition

    摘要在高峰期,總漏電保護器的頻繁跳閘嚴重影響了地的正常,對于這種情況除了加強現場的管理外,根據現場實際情況對漏電保護器進行合理,既滿足地用電的安全性,又可以減少漏電保護器的頻繁跳閘,給正常的創造較好的供電條件。
  10. Planning and arrangement of the site for the bored pile construction

    鉆孔灌注樁場地規劃與
  11. Continuous rigid - framed and box - typed bridge of middle span. according to the wording feature of pc. continuous rigid - framed bridge in cantilever casting construction, every kind of temporary measurement has been analyzed

    中等跨度預應力混凝土箱形連續剛構橋橋跨時,為方便及減小主橋橋長,邊跨跨徑在無特別要求的情況下,可考慮選用較小的邊、中跨比例。
  12. To specify the project, by selecting materials, choosing construction methods, arranging construction process, locating expanding joints, disposing key construction, the outside shell temperature was controlled not exceeding + 25 at surroundings, which met the need of design and check requirement

    針對程具體情況,通過材料選擇、方法確定、程序安排、膨脹縫的、關鍵結構的處理等問題,得出使爐墻外壁溫度控制在環境溫度+ 25的范圍內,滿足設計及驗收規范要求的方法。
  13. Frame for pre - heater at kiln inlet will adopt steel structure to save investment, accelerate erection speed and beautify building

    改進窯尾,窯尾預熱器塔架設計為鋼結構,既可加快安裝進度,節省投資,又可美化建築。
  14. ( 4 ) according to the principle of " repair as the old ", the schemes of foundation strengthening, the schemes of the body structure, the schemes of the shear wall strengthening, the schemes of the floor strengthening, the schemes of the brace layout, the schemes of the switch floor construction and special strengthening scheme such as carbon fiber, the wall steel wire grid strengthening are achieved in this paper

    按照「修舊如舊」的原則實現了照舊色做舊,使新舊構件的色澤差別諧調。依據上述原則,論文實現了基礎加固方案,主體結構加固方案、剪力墻加固方案、樓板拆除支撐和砼方案、支撐方案、高層主體結構轉換層方案、木屋蓋拆除方案以及特殊加固技術如粘鋼加固、碳纖維加固、墻面鋼絲網加固等。
  15. Simulation and optimization of large hpp construction : to pursue best construction proposal by optimizing theory and method and applying information technology, including layout of access, providing and allocation of construction equipment, coordination of construction progress, arrangement of resources, selection and arrangement of construciton materials to develop three - dimensional modelling and optimize the system

    大型水電模擬與優化? ?根據當前水電組織與管理的現狀,通過優化理論與方法、信息技術等的應用,尋求最優化的組織方案,包括道路的機械的配備與調度、進度的協調、資源配材料的優選、料物的優化調配等,開發三維模擬與優化系統。
  16. Based on the characteristics of the buried culvert under west no. 4 ring road in beijing for south - to - north water transfer project, the arrangement of the monitoring points and the monitoring results are emphatically described, and then a verification is made for the availability of the excavation parameters of the culvert through the analysis of the monitoring results, which provides a guidance for the construction of the later - period

    摘要結合南水北調北京西四環暗涵特點,著重介紹了南水北調西四環暗涵期監測點的和監測情況,並通過對觀測成果的整理分析,對暗涵開挖參數的可行性進行了驗證,並為後期的提供了指導。
  17. Design guide of construction general layout for hydropower and water conservancy project

    水電水利設計導則
  18. For the elevation of the scientification and rationality of the construction organization designment and construction management in the modern construction projects, an computer aided design system of integration of construction schedule and layout drawing has been researched and developed in this paper. with this cad system we can realize the layout of the drawings and the compiling of the construction schedules separately, and also this system can used to exchange the data between the two separate systems, and then they can express each other

    為了提高現代建築程項目組織設計和管理的科學性和合理性,本文以電廠建設程項目為例研究和開發了集成化的進度計劃和施工布置的計算機輔助設計系統,利用該系統不僅可以獨立的實現施工布置進度計劃的編制,而且可以利用開發的自定義文件進行這兩種系統的數據交流和表達。
  19. In light of the special natural conditions and project layout characteristics of xiangjiaba hydropower station, a stage diversion scheme with the left bank being closed at the first stage and the right bank closed at the second stage has been selected through comparison of several schemes under the consideration of the aspects such as construction layout, late - stage flood control, navigation during the construction, and the construction period before the commissioning of the first hydropower generating unit

    摘要針對向家壩水電站特殊的自然條件和特點,其導流經過對多個方案進行比較,從施工布置、後期度汛、期通航、發電期等方面考慮,選擇了第一期圍左岸、第二期圍右岸的分期導流方案。
  20. In the part of case, the author described the three problems facing the spec / smart hose inc., a hose safety system manufacturer, when it planned to build its new plant in shenzhen : 1. the facility layout. 2

    案例正文描述了斯貝克? ?斯邁特公司,一個生產膠管安全系統的合資公司,在籌建深圳新廠時所面臨的三個問題: 1 、廠及設: 2 、供應商的評價、選擇與管理; 3 、廠mrp系統的建設。
分享友人