施工布置圖 的英文怎麼說

中文拼音 [shīgōngzhì]
施工布置圖 英文
construction plan
  • : Ⅰ動詞1 (實行; 施展) execute; carry out 2 (給予) exert; impose 3 (施捨) give; hand out; best...
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • : 動詞1. (擱; 放) place; put; lay 2. (設立; 布置) set up; establish; arrange; fix up 3. (購置) buy; purchase
  • : Ⅰ名詞1 (繪畫表現出的形象; 圖畫) picture; chart; drawing; map 2 (計劃) plan; scheme; attempt 3...
  • 施工 : be in the process of construction; be under construction; build; construction
  1. The technological innovation and optimum design were implemented by the design organization during the working drawing period, as a result, the new technology of separated floor for draft tube bend is applied, and the optimized arrangement plan of structure is more compact, the structure form is more rational, rate of progress is accelerated, about 1. 37 hundred million yuan is saved, which is of significant general benefits

    階段,設計單位根據創建節約型社會的宗旨,積極開展一系列技術創新和優化設計作,並首創了廠房尾水管肘管段分離式底板新技術,優化設計后樞紐更加緊湊,建築物結構形式更為合理,加快了進度,節約程投資約1 . 37億元,綜合效益顯著。
  2. The main functions of the module for initializing drawing environment are to set up the scale. linetype. breadth and frame of drawings according to the characteristics of the general arrangement drawing to passenger shippings. the main functions of the second module is to establish and extend graph library, retrieve from graph library and output graph blocks. using the parameterization design method to design interactively and modify automatically graphs of the local cabin are the tasks of the third module. in the help module, the drawing specifications of passenger shipping are integrated, such as equipments of anchor and moor, arrangement of cab, cabin and baggage, measures to come through and ration of passengers, etc. there are some advantages in the proposed system, such as friend interface, operation easily, drawing conveniently and modification automatically

    其中初始化繪環境模塊主要針對客船總繪制的特點來完成比例、線型、幅和框的設;客船總庫模塊主要完成庫的建立和擴充、庫的查詢以及塊的輸出;局部艙室參數化設計模塊採用參數化技術完成對局部艙室形的自動修改以及交互設計;客船規范幫助模塊則集中了一些武漢理大學碩士學位論文客船繪制規范,如錨泊及系泊設備、駕駛室、乘客艙室及行李的放、脫險措及乘客定額等規范。
  3. Because of the complexity of calculation result data, and in order to simplify the analysis of results, this paper only provides annual temperature isoline map of february, may, august and november during construction, temperature isoline map of the first, fifth, tenth, twentieth and thirtieth year during operation, duration curve of temperature and stress of typical point at different elevation, the maximal stress distribution along dam height, point at different elevation, the maximal stress distribution along dam height, and the maximal and minimal temperature and the maximal tensive stress and its position of every month

    因計算結果數據量非常大,為便於成果分析,本文僅給出期每年2 、 5 、 8 、 11月份和運行期第1 、 5 、 10 、 20 、 30年的溫度等值線,壩體不同高程典型點溫度和應力歷時曲線,最大應力沿壩高分,逐月最高、最低溫度和最大拉應力值及相應的位等。
  4. Then, the continuous beam bridge cad system is taken as a real example, to analyse the system structure including the layout, data requirements, procedure diagram of the sub - systems such as beam calculating and modeling, construction simulating, structure analysis, result output, pre - stressed tightwire layout, general tightwire layout, design graphic plotting

    然後,以「連續梁計算機輔助設計系統」為實例,詳細分析了該系統的整體結構,以及梁部計算模型生成子系統、過程模擬子系統、結構分析子系統、計算結果審核和文本輸齣子系統、預應力鋼束子系統、普通鋼束子系統、設計表子系統的層次結構、數據需求和處理流程。
  5. Step 3 : complete the bury of all anchors and connection of construction equipment & slings according to figure 3 : plan layout for lifting and figure 4 : elevation layout for lifting

    第三步:依據三:吊裝平面四:吊裝立面,完成所有錨點的埋設和機索具的連接。
  6. This paper involves the refrigeration principle and technology, the thermodynamics principle, the exergy analyses principle and its applications, the sensor principle and its applications, the microcomputer testing technique, the auxiliary engine of the ship etc. at the same time, to realize the measuring of cold store running parameters so that the main equipment of this system can run safely and reliably, measuring points are disposed at inlet and outlet of main devices, and computer detecting technology is used to measure the real time data at every point

    內容涉及到製冷原理與技術,熱力學原理,火用分析原理及應用,傳感器原理與應用,微型計算機檢測技術,船舶輔機等諸多方面的知識。同時,為了實現對冷庫系統運行參數的全程檢測,以利於系統主要設備的安全可靠運行。在系統的主要設備進出口均了測量點,同時利用計算機檢測技術對各測量點數據進行在線檢測,檢測軟體是基於魯班組態軟體平臺而開發的,可以實時動態顯示檢測數據及數據的趨勢,還可以完整保存歷史數據,以利於分析系統常年運行況,進一步制定改進措
  7. My main job is to design piping layout, do process calculation and supervise site construction

    我的作主要是畫管道藝計算以及現場
  8. Based on practical engineering experience, a suit of template for project scheduling system including the commonness of different engineerings has been customized. in addition, some special functions have been added to it. they are the updating of the completion of tasks, the relationship with the construction ration, data exchange between the scheduling system and the layout system of the drawings and the picturing of the earned curve, etc. besides, the project database has been designed in accordance with the theory and criterion for database design

    本文根據現場程經驗,總結不同程中存在的共性,在project2000基礎上定製開發了電力安裝進度計劃模板,並且在該模板上增加了一些其特有的功能,包括:任務的更新,與定額相聯系,與平面中數據的交互以及利用贏得值原理繪制贏得值曲線等。
  9. In the end, an evaluation system has been developed according to the cascade analytical method in order to make a scientific evaluation to the construction scheme, the project scheduling and the layout system of the drawings

    最後,本文利用層次分析法,開發了組織設計評價系統功能模塊,從而對方案、進度計劃和平面的確定做一個科學的、量化的評價。
  10. This database is the core of project management and information management, realizing data exchang among the scheduling system, the layout system of the drawings and the information management system on site

    此外,本文還設計了程項目數據庫,作為程項目管理和信息管理的核心,實現程項目管理的各個模塊,進度計劃、平面現場信息管理之間數據的交互。
  11. Firstly, the paper sums up program foundation of the auto design system for the structure of prestressed composite slab, in which object - oriented programming and multi - language programming are discussed emphatically. secondly, the paper illustrates program design of the auto design system in preprocess section, analyses calculation section and postprocess section respectively, in which the function design of the intellectualized collocation, the continuous beam model, the check of the precast slab, auto generation of the calculations and shop drawings is described weightily. finally, the practical design methods and process of the structure system of prestressed composite slab are expatiated by representative example

    在綜述了預應力樓蓋體系以及計算機輔助設計的相關內容,分析了國內外研究現狀,研究了疊合樓蓋的受力機理、抗彎抗剪性能以及經濟指標后,文中首先概括了預應力疊合樓蓋體系自動設計系統的編程基礎,其中重點討論了面向對象程序設計和混合語言編程技術;然後分前期處理、分析計算、後期處理三部分,詳細說明了預應力疊合樓蓋體系自動設計系統的程序設計,其中突出描述了程序所特有的智能、連續梁模型、預制板校核、生成計算書及等功能的設計;最後用實例講述了預應力疊合樓蓋體系的實際設計方法及步驟。
  12. Based on the characteristics of the design of ocs, combined with development trends of ocs cad system and the rich experience of the author, the paper gives a thorough presentation of the design method of ocs cad system in five different chapters : chapter one gives a brief introduction of the structure of ocs cad system, meanwhile it shows the functions of each sub - system in detail ; chapter two and three give a thorough explain of the technology of ocs cad system and its application on windows98 and latest operating system ; chapter four expounds the data interface between the ocs design and oter related fields ; chapter five, also the last chapter, summarizes the technology of ocs cad system and analyzes its application in the future

    本論文從接觸網設計特點、結合組織方式和勘測設計cad一體化發展趨勢,分五章對接觸網平面cad技術實現方法進行了詳細介紹。第一章,簡要介紹了接觸網平面cad系統的構成及功能;第二章和第三章,以代表性區間和隧道為例,詳細闡述了在windows98及以上操作系統中接觸網平面cad技術的實現方法;第四章,論述了接觸網專業平面設計與其它專業的數據介面cad技術實現方法;第五章,對接觸網平面cad技術的實現方法進行總結,並對其發展趨勢進行了展望。
分享友人