施工方案 的英文怎麼說

中文拼音 [shīgōngfāngàn]
施工方案 英文
construction scheme
  • : Ⅰ動詞1 (實行; 施展) execute; carry out 2 (給予) exert; impose 3 (施捨) give; hand out; best...
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • : Ⅰ名詞1 (方形; 方體) square 2 [數學] (乘方) involution; power 3 (方向) direction 4 (方面) ...
  • : 名詞1 (長桌) table; desk 2 (案件) case; law [legal] case 3 (案卷; 記錄)record; file 4 (提...
  • 施工 : be in the process of construction; be under construction; build; construction
  • 方案 : scheme; plan; programme; project; proposal; suggestion; formula; scenario; outline
  1. On the basis of collecting and arranging a large amount of projects experience, conbined with construction diversion flood passing measures design and hydraulic model test of lihua hydraulic pawer station in 1995 and 1996, the dissertation studies the issues related with characteristics of concrete face rockfill dam including the selection of construction diversion flood passing standard and measures, flood passing during construction period and embankment stage, coffer dam design, construction scheme and general schedule etc. and present preference for project construction

    本文在搜集整理大量程經驗的基礎上,結合蓮花水電站在1995年及1996年導流渡汛程措設計及水模型試驗,對混凝土面板堆石壩的導流渡汛標準、導流式及其選擇、期渡汛及壩體填築分期、圍堰設計以及施工方案及總進度等與混凝土面板堆石壩特點有關的問題進行研究,為程建設提供一定的參考。
  2. For improve site soil condition and ensure piling work safety, we have worked out dewater construction proposal

    為改善現場的場地條件,保證壓樁程的安全進行,編制降水程的施工方案
  3. According to in - situ construction real time observation and inverse analysis results, refinement numerical artificial analysis on a group of headrace tunnels was conducted and influence of different construction schemes and support parameters on rock mass deformation and failure behavior were researched to provide quantized data and technical aid for project construction decisions

    基於跟蹤的現場實時觀測和反演分析結果,對引水發電洞群進行了精細化數值模擬分析,研究了不同施工方案和支護參數對巖體變形、破壞特性的影響,以便為程的決策提供量化資料和技術支持。
  4. Analyzed the reason of stress corrosion cracking on u shape brass tube bundle when it is having penetrative test with ammonia, improved technology of test and gave out the method should be paid attention to during the process of brass tube exchanger

    摘要對黃銅管換熱器管束在氨滲試驗過程中發生應力腐蝕,導致銅管破裂的原因進行了分析,改進了施工方案,並提出了黃銅管換熱器製造過程中對管束進行耐壓試驗時的注意事項。
  5. Adopting the construction scheme which combines iron - frame moulded board with unsegragating concrete underwater and encircling steel hoop on glass fiber reinforced plastic mortar pipes, the difficulty in construction of outfall in riprap mound within a short period period is overcome

    摘要通過採用鋼框模板結合水下不離析混凝土以及對玻璃鋼夾砂排水管採用抱箍的施工方案,成功解決了在較短期內完成拋石棱體中出水口難度大的問題。
  6. General construction scheme of rigid - frame open spandrel aarch bridge

    空腹式剛架拱橋總體施工方案
  7. General construction scheme of rigid - frame open spandrel arch of youxizhou minjiang river bridge in fuzhou

    福州尤溪洲閩江大橋空腹式剛架拱總體施工方案
  8. Aiming at the problems in testing strata with low permeability, hydrogen sulfide - bearing wells and high temperature and pressure, a whole set of mature testing technology and doable construction programs are worked out, which turn out to be mature in technology, secure in construction and objective and accurate in testing results examined by practical construction

    摘要針對低滲透地層測試、含硫化氫井的測試及高濕高壓井測中存在的問題,經過不斷探索和實踐,形成了一整套成熟的測試技術和切實可行的施工方案,經實際檢驗證明,技術成熟,施工方案安全可靠,測試結果客觀準確。
  9. Secondly, this paper made some theoretic researches on its engineering classfication and applicable scope for this technology ; then combining with project example, this paper carried out scheme design for this technology, and compared some different kinds of underpinning scheme and node and structure design, and put forward the method of " reinforcce steel bar through column " to build pile cap beam, " resistant bend and shear anchored reinforce steel bar " to strengthen column consolidation effect, and the method of " steel plate hoop " to build reinforcing bar connection of the foundation beam, etc. in the process of the consturction scheme research and implement, this paper synthetically elaborated the organizaton for project construction, put forward the construction technical measure of specific aim on the artificial pile, and pile cap beam, and underground adding layer and structure stabilization, and overall structure stabilization and so on. for this project, adopt reinforcing bar concrete to brace hole wall to ensure the safety of engineering in the artificial pile construction, use flexible connection catch to make the cage hoisting easier to simplify the construction process, use the method of earthwork statified symmetrical balance in the process of underground adding layer excavation

    本文首先對于基礎托換與結構加固技術的目的和意義、國內外發展狀況進行了綜合闡述;其次對該項技術程分類及適應范圍進行了理論上的分析研究;然後結合程實例對該項技術進行了設計,對比幾種不同的托換和節點及構造設計,提出了「通筋穿柱法」做承臺梁, 「抗彎抗剪錨筋法」強化柱加固效果, 「鋼板箍法」做地基梁鋼筋連接點等多項技術;在施工方案的研究和實過程中,對于組織進行綜合闡述,並就人挖孔樁、承臺梁、地下加層及結構加固、整體結構穩定等專項施工方案提出有針對性的技術措,人挖孔樁採用鋼筋砼護壁確保挖孔樁的安全成型,使用柔性連接鉤進行鋼筋籠吊裝簡化序;承臺梁採用梁主筋橫穿柱身化學膠錨固等;地下加層綜合技術採用土分層對稱平衡開挖,分段挖土做筏基結構自穩等;最後對于該程實后的效果分析,說明該項綜合技術的可行性。
  10. The comparison of constructive programs with shallow burying method and subsurface excavation method at ciqikou station in beijing metro

    北京地鐵磁器口車站淺埋暗挖法進洞施工方案比較
  11. 3 decoration standards and plan should be strictly carried out according to fuyaluosi standards

    3加盟店必須嚴格按照「富雅夢斯」的裝修標準及施工方案裝修
  12. The article structure the landslide prevention and cure, the structure of prestress anchors and its application in detail. basing on the geology condition of fabricating yard, we calculate the solid power and the length of anchor rope. we have worked out the experiment research scheme, and has carried on the earlier stage experiment, field demarcation experiment and has opened pulling the experiment on the spot. ten teams of steel rope to two teams of structure types twist the experimental data that thread internal stress and the total pulling force has been in progress research, and has put forward raising the measure of solid capability of prestress anchor and administering possessing

    本文以川藏公路滑坡路段為研究對象,對滑坡的治理、預應力錨索的結構、作用及其在滑坡防治中的應用進行了詳細的分析;基於現場的地質條件,對錨索錨固力及錨索最佳錨固段長度進行了理論計算;制定了實驗研究,進行了前期實驗、現場標定實驗、實地張拉實驗;對兩組結構型式的十組鋼絞線內應力及總張拉力的實驗數據進行了研究,提出了提高預應力錨索錨固性能的措,以及具體的施工方案藝。
  13. A whole set of design scheme and construction program has been worked out and utilized in metro engineering in this thesis through the analysis and study on high pressure shot grouting method

    本文通過對高壓噴射注漿法進行分析研究,制定出一整套設計施工方案,並將成果應用到地鐵程中。
  14. High bridge pier construction belongs to the special structure construction category, the choice of site construction plan has stressed continuously in the experience and neglected the construction stress analysis

    摘要橋梁的高橋墩屬于特種結構范疇,現場施工方案的選擇一直以來偏重於經驗而忽視受力分析。
  15. This paper introduces the development and present situation of concrete - filled steel tube arch bridge in the world ; generally analysis the mechanism, construction technology, construction equipment of the job practice ; advance the entire scheme of the long - span concrete - filled steel tube arch rib construction ; at last give the analysis the concrete scheme of the concrete - filled arch rib construction. this paper declares the reference value of the study through the above

    本文介紹了國內外大跨度鋼管混凝土拱橋主拱肋的發展和現狀;綜合分析了拱橋的機理、技術和設備情況;提出了大跨度拱橋主拱肋的完整解決,最後通過具體橋梁施工方案的設計分析,說明了本項研究成果的現實參考價值。
  16. Construction scheme of tunnel passing through landslide area and fault zone

    穿越坍區及斷層帶的隧洞檢修洞施工方案
  17. The real estate development cost control methods are specified of decision, design, execution stage to reduce the construction cost, and it is compiling feasibility study report and capital invest estimation in decision, optimizing the design scheme and designed rationally in the technique and construction drawing design stage, electing rational construction scheme in construction stage, controlling the change in the work and field visas strictly, examining and approving budge detailed, budge planning use the quantities list, electing the best subcontractor, preventing some monopoly raise the price, collecting the detailed data in the fieldwork, making strict bargain

    討論了房地產開發項目的決策階段、設計階段、實階段分別需要採取的相關措法,以盡量降低項目的程造價,即在決策階段編寫詳細的可行性研究報告和編制投資估算;在設計階段優化設計,進行合理的技術設計和圖設計;在實階段選擇合理的施工方案,嚴格控制程變更和現場簽證,嚴格審核圖預算,程造價的預算採用程量清單報價,擇優確定專業分包單位,防止少數壟斷性行業任意抬價,深入現場,收集和掌握有關資料,制定嚴密的合同條款。
  18. Optimum design of a rigidity over line arch bridge main circle construction project

    跨線剛拱橋主拱圈施工方案優化設計
  19. The cost control of hlsip shoud take a method of quota design step by step during the design stage ; during the construction seage, the emphasis should be attached to optimizing construction scheme, check and signing the working drawing and making a strict demand on metering pay. at the same time, the cost out - of - control should be avoided, and the constructor should treat the project change cautiously and properly handle the claim

    高揚程梯級提水灌溉程的投資控制,在設計階段應逐步推行限額設計的作法;階段以優化施工方案,審簽圖紙,嚴格計量支付為重點,防止投資失控,同時要謹慎對待程變更,正確處理索賠事宜。
  20. Selection and application of construction plan for crossing point of road and inclined shaft at same seam

    同一煤層平巷與斜巷交叉點施工方案的選擇應用
分享友人