施工承包 的英文怎麼說

中文拼音 [shīgōngchéngbāo]
施工承包 英文
construction contracting
  • : Ⅰ動詞1 (實行; 施展) execute; carry out 2 (給予) exert; impose 3 (施捨) give; hand out; best...
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • : Ⅰ動詞1 (托著; 接著) bear; hold; carry 2 (承擔) undertake; contract (to do a job) 3 (客套話...
  • 施工 : be in the process of construction; be under construction; build; construction
  1. On the base of systematic background analysis, this thesis points it out that construction ' s total contract pattern will be amain contract - pattern of domestic building - market as before

    本論文在系統的背景分析基礎上,指出模式依然是國內建築市場主要的模式。
  2. Claims for apo apc under fidic conditions

    合同條件下的商索賠問題分析
  3. Contract with yanjing ( guilin ) beer co. involving fermentation tank, bbt and tank area ; turnkey project of 100, 000t brewhouse for zhejiang xiandu beer factory ; contract with chengde sihai brewery involving all fermentation tank and bbt ; order from a transnational company involving fermentation tank ; other large quantities of contract from a world famous beer company and juice company. the total contract value exceeds rmb1, 000, 000, 000

    由樂惠寧波公司負責總的燕京福建啤酒有限公司60m3冷麥汁的糖化系統交鑰匙程項目,經過約80天的近日一次投料試車成功,各項指標全部合格,目前已經進入全面試生產階段。同樣由樂惠公司接的36個不銹鋼發酵罐和8個清酒罐早於6月底開始交付燕京啤酒投入使用,以滿足燕京啤酒供不應求的市場需求。
  4. The main points of hlsip quality control includes : during the design stage, it is necessary to control the scheme comparison and optimum design, esp. the waterwork, electromechanical device and irrigation region planning, to improve the design quality and pay attention to control the long - term benefits of design results ; during construction period, the supervisor should help proprietor choose construction contractor, sign the construction contract, supervise the manufacture of equipment and strictly execute the quality control procedure to subject the construction to controlled mode ; in addition, the contractors must improve their quality self - control, maintain the notion " quality first " and insist the full process, multiway, and multi system control of construction quality

    高揚程梯級提水灌溉程質量控制的重點括:設計階段控制好方案對比、設計優化,特別是水建築、機電安裝、灌區規劃等多專業多目標的確定和協調,提高設計質量和深度,注重控制設計成果的長期效益;階段協助業主選擇好施工承包商,制定出嚴謹、完備的合同,搞好設備監造,嚴格執行質量控製程序,使時時處于受控狀態;同時要提高商的質量自控能力,堅持質量的全過程、多方法、多體系控制。
  5. Contract letting party can sign the construction project contract with general contract, and also can sign investigate, design and construction work contract with investigator, designer and constructer

    人可以與總人訂立建設程合同,也可以分別與勘察人、設計人、人訂立勘察、設計、施工承包合同。
  6. The developer may enter into a contract for construction project with a prime contractor, or enter into contracts for survey, design, and construction with the surveyor, designer, and constructor respectively

    第二百七十二條發人可以與總人訂立建設程合同,也可以分別與勘察人、設計人、人訂立勘察、設計、施工承包合同。
  7. Finally the model is explained and checked by using a road project in china, and it is emphasized that project cash flow forecast be conducted circularly

    並通過實例進行說明、檢驗,指出施工承包企業項目現金流預測應該採用循環滾動的方式進行。
  8. Party b ' s working staff shall consciously abide by “ management rules and regulations of shenzhen guanlanhu golf club for construction contract staff from outside sources ” ( see attachment for details ) and any breach will be punished accordingly to the rules and regulations thereof

    乙方作人員應自覺遵守《深圳觀瀾湖高爾夫球會外來施工承包隊員管理規章制度》 (詳見附件) ,違者按該規章制度予以處罰。
  9. General and special contractors : general contractors refer to construction enterprises that have the qualification for signature of general contract of construction projects and are entitled to implement the whole project under the general contract or the principal part of the project

    和專業企業:總企業是指具有資質,可以對程實行或者對主體程實行施工承包的建築業企業。
  10. Article 36 the preparation and construction office is responsible for the following concrete works : examining the designs of the project, signing the project construction contract, organizing the purchase and inspection of related equipment, materials, etc., working out the general schedule of project construction, compiling the expenditure plans, controlling project financial payments and final accounts of the project, drawing up managerial methods and keeping and filing documents, drawings, files and materials, etc., during the construction period of the project

    第三十六條籌建處具體負責審查程設計,簽訂施工承包合同,組織有關設備、材料等物資的采購和驗收,制定有關的管理辦法,做好過程中文件、圖紙、檔案、資料的保管和整理等作。
  11. Abstract : considering the status quo, characteristics and prospects of decorative engineering including design, construction and contract and according to the current engineering cost supervision system and relevant policy, law and regulations in china, this paper introduces a method of budgeting for construction drawing of decorative engineering which can better meet the present - day needs

    文摘:根據我國裝飾程在設計、施工承包等方面的現狀、特點和發展前景,結合我國現階段程造價管理體制和相關政策、法令、法規等,提出可能較好地適應現實需要的裝飾圖預算的編制方法。
  12. The solution for all problems, which were arising during the construction process, has fully fallen upon the construction players

    作者認為,對于階段所產生各類問題的解決完全取決于業主、施工承包商等。
  13. Minimum 2 international industry project experience on pm or cm ' s role in epcm contractor or construction contractor ' s team

    作為經理或者項目經理在程公司或者施工承包商的團隊中,參與過2個以上的國際程項目。
  14. Minimum 1 international industry project experience on lead field engineer or project engineer ' s role in epcm contractor or construction contractor ' s team

    作為技術負責人或者項目程師在程公司或者施工承包商的團隊中,參與過1個以上的國際程項目。
  15. Besides, in case of disagreements, the owners and a / es should keep all the pertinent and relevant records along with the contractors, which will settle the matters later

    此外,在業主和建築程師的意見不一致時,他們必須與施工承包商保留所有中肯、相關的記錄,這有利於今後問題的解決。
  16. Choosing of the right construction methods ( project delivery systems ), selection of contracting methods ( payments ) and selection of contractors have an equal importance in avoiding of claims during the project construction life which have strongly been stressed in this thesis

    在項目建設周期中,正確的方法(項目支付系統) 、方式(支付)和施工承包商的正確選擇對避免索賠也具有同樣重要的作用,這些在本論文中都作了研究。
  17. Project owners can able to recognize warning signs of a potential claims, and volunteer to stretch their hands for cooperation and to work as a team with the contractors, without any consequences creates high chances that the project will be completed successfully with the required quality, on time, within budget and without excessive expense and lengthy arbitration and litigation - in the courtroom

    業主要及時發現潛在的索賠警告信號,並加強與施工承包商的合作,以使程項目取得成功,即按時保質完成程項目,並將程費用控制在預算內,盡量避免長時間的仲裁和訴訟。
  18. Subject to consent by the developer, the prime contractor or the contractor for survey, design, or construction may delegate part of the contracted work to a third person

    人或者勘察、設計、施工承包人經發人同意,可以將自己的部分作交由第三人完成。
  19. The third person and the prime contractor or the contractor for survey, design, or construction shall be jointly and severally liable to the developer in respect of the work product completed by such third person

    第三人就其完成的作成果與總人或者勘察、設計、施工承包人向發擔連帶責任。
  20. The management method for construction project contacting award amp; amp; contracting cost

    建築計價管理辦法
分享友人