施工組織設計 的英文怎麼說

中文拼音 [shīgōngzhīshè]
施工組織設計 英文
construction design
  • : Ⅰ動詞1 (實行; 施展) execute; carry out 2 (給予) exert; impose 3 (施捨) give; hand out; best...
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • : Ⅰ名詞1 (由不多的人員組成的單位) group 2 (姓氏) a surname Ⅱ動詞(組織) organize; form Ⅲ量詞(...
  • : 動詞(編織) knit; weave
  • : Ⅰ動詞1 (設立; 布置) set up; establish; found 2 (籌劃) work out : 設計陷害 plot a frame up; fr...
  • : Ⅰ動詞1 (計算) count; compute; calculate; number 2 (設想; 打算) plan; plot Ⅱ名詞1 (測量或計算...
  • 施工 : be in the process of construction; be under construction; build; construction
  • 組織 : 1 (組織系統) organization; organized system 2 (組成) organize; form 3 [紡織] weave 4 [醫學] [...
  • 設計 : devise; project; plan; design; excogitation; layout; layout work; styling
  1. The application of value engineering in trnnel work organization design

    價值程在隧道施工組織設計中的應用探討
  2. Code for design of organized construction of surface coal mine

    露天煤礦施工組織設計規范
  3. Discussion on the compilation of the construction organization plan

    淺論建築施工組織設計的編制
  4. Standard for construction organization design of chemical engineering project

    項目施工組織設計標準
  5. Discussion on the implementation of the operational construction organization plan

    淺議實施工組織設計的貫徹
  6. Analysis of relationship between construction organization design and quality plan

    淺析施工組織設計與質量劃的關系
  7. Construction management plan

    施工組織設計
  8. It is an impotent part that plans and selects the place for sand & stone in the planning and the construction order of hydraulics and electric power project on base of concrete dam. material field choose and receive many kinds of restriction of terms is influence factor a lot of

    砂石料場的規劃選擇是混凝土壩為主體程的水利水電施工組織設計中的重要環節,料場選擇受到多種條件的制約,影響因素很多。
  9. Some factors that should be stressed in the engineering organizing and settling accounting

    施工組織設計程預結算中應注意的幾個問題
  10. Probe into the relation between the engineering ' s construction organization plan and the preliminary estimate

    施工組織設計與概預算關系的探討
  11. Design guide for construction planning of underground engineering of hydropower and water conservancy project

    水電水利程地下施工組織設計導則
  12. The former part is to analyze the principle of architectural construction proposal and the function of construction management, which sums up in data methods in existed documents systematically, gives a presentation of compiling basis, contents, methods and program for construction proposal, through my 3 - year relative knowledge. and then the relations between construction proposal and enterprise management and development, as well as the relations between construction proposal and its project and management on site are also described. making comprehensive utilization of multi - scientific theories, i studied how to compile construction proposal for large - scale metallurgical factory construction project

    本文分兩部分論述,前半部分系統地分析了建築施工組織設計的原理以及在程項目管理中的作用,並系統地歸納了已有文獻的數據方法,結合三年來學習的相關知識,闡述了施工組織設計的編制依據、內容、方法和程序,同時也探討了施工組織設計與企業管理和企業發展的關系以及同建項目和現場管理的關系等,並綜合運用多學科的相關理論,對如何編制大型冶金建項目的施工組織設計進行了應用研究。
  13. Promotes built environments that are harmonious with their environment. introduces feng shui, platonic forms, sacred geometry, sustainability and vedic building. links to related sites

    -主要內容包括規范,施工組織設計,技術資料,考試,培訓,藝標準,造價師建造師考試培訓報名,等建築資料和建築效果圖。
  14. 6. to going on wheels, this dissertation brings forward project monitor scheme and construction design of daheba landslide

    6 .文中提出了滑坡治理中的程監測方案及項目施工組織設計,為治理程順利實打下堅實的基礎。
  15. ( 7 ) the monitoring system of landslide and the project management design are presented at last, which lays strength foundation for the harness engineering

    ( 7 )提出滑坡及危巖綜合治理程中的滑坡監測方案及項目施工組織設計方案,為綜合治理程的順利實打下了堅實的基礎。
  16. Supervision engineer ' s responsibility and proper right limit in organizational arrangement for construction

    監理程師在施工組織設計審查中的責任和分寸
  17. Optimum design for construction management by limiting the period of survey, drilling, loading and exploding, ventilating and transporting is intensively studied and the applicability of boosting the speed of construction by well organization of space, manpower and machine is fully illustrated

    論文重點闡述了通過縮短測量劃線、鉆眼、裝藥爆破、通風排煙、裝碴運輸作業時間,達到快速施工組織設計優化的目的,說明了採用鉆爆法充分利用隧道空間,合理配備人力、機械,隧道開挖進度得到提高的可行性。
  18. For the elevation of the scientification and rationality of the construction organization designment and construction management in the modern construction projects, an computer aided design system of integration of construction schedule and layout drawing has been researched and developed in this paper. with this cad system we can realize the layout of the drawings and the compiling of the construction schedules separately, and also this system can used to exchange the data between the two separate systems, and then they can express each other

    為了提高現代建築程項目施工組織設計管理的科學性和合理性,本文以電廠建程項目為例研究和開發了集成化的進度劃和布置的算機輔助系統,利用該系統不僅可以獨立的實現布置和進度劃的編制,而且可以利用開發的自定義文件進行這兩種系統的數據交流和表達。
  19. In the end, an evaluation system has been developed according to the cascade analytical method in order to make a scientific evaluation to the construction scheme, the project scheduling and the layout system of the drawings

    最後,本文利用層次分析法,開發了施工組織設計評價系統功能模塊,從而對方案、進度劃和平面布置圖的確定做一個科學的、量化的評價。
  20. ( 4 ) the thesis converts unrest model ( arima model ) of time series to the rest model ( arma model ) of time series. it sets up models acrossing some procedures, such as model identify, factor estimation, model check, ect, then predict the development short - term warp of road foundation. it predicts the time of the filling soil of the next grade utilizing the growth theory of the strength of the road foundation, assures that the working organization and design go smoothly during the filling work of road foundation and saves time and money

    ( 4 )從路基實測變形數據出發,將時間序列非平穩性模型( arima模型)轉化成時間序列平穩模型( arma模型) ,通過模型識別、參數估、模型驗證等步驟來建立模型,從而進行路基動態變形預測,利用路基變形的控制標準對路基下一級填土的時間進行預測,優化了施工組織設計,節省了時間和資金。
分享友人