施工組織 的英文怎麼說

中文拼音 [shīgōngzhī]
施工組織 英文
construction organization
  • : Ⅰ動詞1 (實行; 施展) execute; carry out 2 (給予) exert; impose 3 (施捨) give; hand out; best...
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • : Ⅰ名詞1 (由不多的人員組成的單位) group 2 (姓氏) a surname Ⅱ動詞(組織) organize; form Ⅲ量詞(...
  • : 動詞(編織) knit; weave
  • 施工 : be in the process of construction; be under construction; build; construction
  • 組織 : 1 (組織系統) organization; organized system 2 (組成) organize; form 3 [紡織] weave 4 [醫學] [...
  1. The application of value engineering in trnnel work organization design

    價值程在隧道施工組織設計中的應用探討
  2. Secondly, this paper made some theoretic researches on its engineering classfication and applicable scope for this technology ; then combining with project example, this paper carried out scheme design for this technology, and compared some different kinds of underpinning scheme and node and structure design, and put forward the method of " reinforcce steel bar through column " to build pile cap beam, " resistant bend and shear anchored reinforce steel bar " to strengthen column consolidation effect, and the method of " steel plate hoop " to build reinforcing bar connection of the foundation beam, etc. in the process of the consturction scheme research and implement, this paper synthetically elaborated the organizaton for project construction, put forward the construction technical measure of specific aim on the artificial pile, and pile cap beam, and underground adding layer and structure stabilization, and overall structure stabilization and so on. for this project, adopt reinforcing bar concrete to brace hole wall to ensure the safety of engineering in the artificial pile construction, use flexible connection catch to make the cage hoisting easier to simplify the construction process, use the method of earthwork statified symmetrical balance in the process of underground adding layer excavation

    本文首先對于基礎托換與結構加固技術的目的和意義、國內外發展狀況進行了綜合闡述;其次對該項技術程分類及適應范圍進行了理論上的分析研究;然後結合程實例對該項技術進行了方案設計,對比幾種不同的托換方案和節點及構造設計,提出了「通筋穿柱法」做承臺梁, 「抗彎抗剪錨筋法」強化柱加固效果, 「鋼板箍法」做地基梁鋼筋連接點等多項技術;在方案的研究和實過程中,對于施工組織進行綜合闡述,並就人挖孔樁、承臺梁、地下加層及結構加固、整體結構穩定等專項方案提出有針對性的技術措,人挖孔樁採用鋼筋砼護壁確保挖孔樁的安全成型,使用柔性連接鉤進行鋼筋籠吊裝簡化序;承臺梁採用梁主筋橫穿柱身化學膠錨固等;地下加層綜合技術採用土方分層對稱平衡開挖,分段挖土做筏基結構自穩等;最後對于該程實后的效果分析,說明該項綜合技術的可行性。
  3. The results and conclusions are helpful and valuable for the soil nailing bracing. in the case study of deep foundation pit of dalian zhongyin mansion, the discussions are emphasized on how to analyze and modify the previous design according to practical engineering geological conditions, periphery surroundings and the construction organization process and others. furthermore, optimization of bracing design for the project is done considering construction technology and urgent measures

    綜合考慮實際地質條件、周邊環境約束條件、施工組織過程與程序等多方面,對原有支護設計方案進行了分析與修改,並進行了優化設計,其中考慮了藝、應急處理措等方面;並由此進一步表明了深基坑程中動態設計與信息化的重要性。
  4. Code for design of organized construction of surface coal mine

    露天煤礦施工組織設計規范
  5. Organizing construction with new austrian tunneling method

    新奧法設計原理在施工組織中的應用
  6. Discussion on the compilation of the construction organization plan

    淺論建築施工組織設計的編制
  7. A design on a neural network for resource balance optimization

    公路施工組織網路資源優化的啟發式演算法
  8. Standard for construction organization design of chemical engineering project

    建設項目施工組織設計標準
  9. Discussion on the implementation of the operational construction organization plan

    淺議實施工組織設計的貫徹
  10. Analysis of relationship between construction organization design and quality plan

    淺析施工組織設計與質量計劃的關系
  11. Construction management plan

    施工組織設計
  12. Analysis of the factors affecting the construction organization of shield tunnels of subway

    地鐵盾構隧道施工組織影響因素分析
  13. The result shows this modified method is great, and gives some reference for other line ' s embankment settlement prediction

    結果顯示本方法能夠準確地預測沉降,從而使後期施工組織安排達到最優化。
  14. The damming technique is relatively perfect now, but because of the problems in construction management are more and more severe, such as construction scheme and matching machine, which manifest the high construction expenses

    雖然碾壓混凝土築壩技術已達到較成熟的地步,但是由於採用不同施工組織方案和機械配套方面存在的管理問題越來越突出,這集中反映了碾壓混凝土壩費用的巨大浪費。
  15. This paper outlines the design and construction conditions of the yangtze estuary deepwater channel regulation project, describes the comparison and selection of the design schemes for the 1st & 2nd phase projects, and expounds the construction organization and administration, the core of which is dynamic management

    摘要全面介紹長江口深水航道治理程整治建築物程和疏浚程的設計條件和條件,並在此基礎上介紹一、二期程設計方案的優選情況,以及程實過程中以動態管理為主要內容的施工組織管理情況。
  16. It is an impotent part that plans and selects the place for sand & stone in the planning and the construction order of hydraulics and electric power project on base of concrete dam. material field choose and receive many kinds of restriction of terms is influence factor a lot of

    砂石料場的規劃選擇是混凝土壩為主體程的水利水電施工組織設計中的重要環節,料場選擇受到多種條件的制約,影響因素很多。
  17. As to self - finished engineering, used internal contract pattern to conduct construction organizing. ( 2 ) network plan technique has been fully introduced to plan management and schedule control, so that can finish constructing tasks according to time and quality

    以內部承包模式對自行完成程進行施工組織。在計劃管理中全面導入網路計劃技術用於項目的計劃管理和進度控制,以確保按期保質完成任務。
  18. Simulation and optimization of large hpp construction : to pursue best construction proposal by optimizing theory and method and applying information technology, including layout of access, providing and allocation of construction equipment, coordination of construction progress, arrangement of resources, selection and arrangement of construciton materials to develop three - dimensional modelling and optimize the system

    大型水電模擬與優化? ?根據當前水電施工組織與管理的現狀,通過優化理論與方法、信息技術等的應用,尋求最優化的施工組織方案,包括道路的布置、機械的配備與調度、進度的協調、資源配置、材料的優選、料物的優化調配等,開發三維模擬與優化系統。
  19. The paper discusses accelerating the construction schedule and shortening the time limit for a project

    本文對建築施工組織中來用先進技術的進度計劃后如何縮短期問題進行了探討。
  20. It has been proved that the design and construction organization presented in this thesis for the strata consolidation by means of high pressure shot grouting method be a success, and the design procedure and construction scheme can provide a guide for soft foundation treatment and waterproof in underground engineering

    實踐證明,高壓噴射注漿法地層加固的設計和施工組織是成功的。本文提出的設計思路和施工組織方案對地下程軟地基處理和防水止滲具有指導意義。
分享友人