暫時硬度 的英文怎麼說

中文拼音 [zhànshíyìng]
暫時硬度 英文
bicarbonate hardness
  • : Ⅰ形容詞(時間短) short; momentary Ⅱ副詞(暫時) temporarily; for the moment; for the time being
  • : shí]Ⅰ名1 (比較長的一段時間)time; times; days:當時at that time; in those days; 古時 ancient tim...
  • : 形容詞1 (堅硬) hard; stiff; tough 2 (剛強; 堅定; 強硬) strong; firm; tough; obstinate 3 (勉...
  • : 度動詞[書面語] (推測; 估計) surmise; estimate
  • 暫時 : temporary; transient; for the time being
  • 硬度 : hardness; solidity; scirrhosity (腫瘤的)
  1. Reactive power are calculated using the new algorithm. on the basis of analyzing different kinds of control strategies of var compensation, the paper applies the criterion of voltage and var to control switching and illustrates a improved mode of switching capacitor which can prevent the switched - capacitor from the impacting of instantaneous rush currents by means of zero - crossing triggering of scr components, and can realize auto - tracking var and auto - switching shunt capacitor bank. initial operating parameters are stored in information flash memory of the mcu using flash self - programming technique in order to decrease complexity of the circuit and improve stability

    高壓智能無功補償控制器以flash型16位單片機msp430f149為控制核心,採用了一種相角實測量的新演算法,並在此基礎上計算出了功率因數、有功和無功,減少了運算量提高了精;在分析了各種無功補償控制策略的基礎上,以母線電壓和無功功率復合判據控制投切,並提出一種改進的電容器投切方式? ?態投切控制晶閘管過零觸發,避免了電容器投切的電流沖擊;穩態運行接觸器替代晶閘管,實現無功補償的自動跟蹤和電容器的自動投切,解決了投切態電流沖擊和穩態可靠運行的難題;控制器的原始運行參數採用flash自編程技術,將其保存在msp430f149片內的信息flash中,簡化了體電路,大大提高了系統的可靠性。
  2. Since that the choosing line hardware for the neutral ungrounded system has just passed part of the dynamic simulative test, matlab software was chosen to do a lot of simulative tests on single phase - to - grounding fault. and the simulative sampling ratio is almost the same as the hardware ' s. because there is a low wave filter in the hardware, i choose the db15 wave - let to carry out the multidimensional decomposition on the sample by the method of one dimension discrete wavelet in order to obtain low frequency signal including the high frequency transient information on single phase - to - grounding fault

    鑒于實驗室已有的小電流接地系統選線體的研製只通過了實驗室里的動模試驗,故選用matlab軟體對小電流接地系統進行大量的單相接地故障模擬試驗,模擬的采樣率和體基本一致,由於體中帶有低通濾波器,故在進行采樣數據的morlet小波分析先採用db15小波對采樣進行一維離散小波的多尺分解,使得分解得到的低頻信號剛好包括了小電流接地系統單相接地故障態高頻信息,然後對這一信息再繼續進行小波演算法分析,分析結論表明利用變換后的實部、虛部和模值能夠較準確的實現單相接地故障的故障選線和態高頻分量的提取。
  3. Then some methods including optimizing the spectrum and intensity of 3w1 beam line and improving the performance of pmma were put in force, and pmma structure with aspect ratio 100 was obtained under these optimum conditions. moreover, such steps as controlling ph, electrodepositing, using activator and a second cathode, and mending the power supply were taken to solve a series of problems coming into being during electroforming process correspondingly, for example, air holes, inner stress, and ununiformity of deposition

    並針對3w1光源中x光成分較多、光強和功率密太高的特點,提出了用ni吸收膜改善光譜和用x光波器法優化光強的方法,同嚴格控制和改善pmma光刻膠的性能,經過反復的計算分析和實驗改進后,獲得了深寬比高達100的膠結構圖形。
分享友人