最大庫存量 的英文怎麼說

中文拼音 [zuìcúnliáng]
最大庫存量 英文
maximum inventory
  • : 副詞(表示某種屬性超過所有同類的人或事物) most; best; worst; first; very; least; above all; -est
  • : 動詞1 (存在; 生存) exist; live; survive 2 (儲存; 保存) store; keep 3 (蓄積; 聚集) accumulat...
  • : 量動1. (度量) measure 2. (估量) estimate; size up
  1. The electronic temperature, intensities of all lines and continuous spectra gradually increased with the increment of laser energy, and they got to maximum at different laser energy. our results of copper and aluminum show that there are possibly different thresholds of laser energy to electronic temperature and intensities of emission spectra of laser ablated plasma. at the different environmental gas pressure, spatial emission intensity distribution is explained by the competition among " heat reservoir effect ", " confined effect " and " s hadow effect "

    認為cu等離子體羽的發光機制是由電子與粒子的碰撞傳能、電子與離子的復合形成的;隨激光能的增加, cu等離子體特徵輻射(分立譜) 、連續背景輻射(連續譜) 、電子溫度都出現值;結合對al的實驗結果說明:激光燒蝕金屬產生的等離子體,其特徵輻射、連續輻射、電子溫度可能都在一定的能閾值;背景氣壓對激光燒蝕等離子體譜線的影響,其機理可以認為是「熱效應」 、 「約束效應」及「陰影效應」相互競爭的綜合結果。
  2. This paper develops a deterministic inventory model for perishable items with a mixture of back orders and lost sales under inflation and time discounting, where the backlogged demand rate is dependent on the negative inventory level during the stock out period. the main differences from the existing related models are that the present model takes the maximum present value of profit in a repeatable order cycle as the objective function and proposes a more practical constraint of maximum customer - waiting time to ensure a proper customer service level. then the existence and the uniqueness of the solution to relevant systems are examined and a solution algorithm is shown to find the optimal replenishment policy. at last, some numerical examples are presented to illustrate the applicatioh of the model

    本文建立了一種考慮通貨膨脹與時間價值的變質性物品的模型,在模型中允許短缺發生且拖后的需求速率與在缺貨期間已經發生的缺貨有關.和已有相關模型的主要區別在於本模型把一個可重復的訂貨周期內的平均利潤的凈現值作為目標函數,且增加了在缺貨期間長顧客等待時間的限制,以確保系統擁有較高的服務水平.然後討論了模型優解的在性與唯一性,並提供了尋求模型整體優解的演算法.後用實例說明了此模型在實際中的應用
  3. Our company is built in 2000, mainly design, produce and sell lcd and lcm with industrialishts more than one thousand. we provide tn htn stn fstn lcd and smt cob cog lcm that can be used in instrument, car, company, gps and so on. we have cooperated with haier delux galanz and son on these wellknown enterprises, provide good after service

    公司主營: skf ntn nsk iko nachi fag koyo ijk等進口軸承,備有現貨,實行全天候配送貨,能在短的時間內為用戶解決軸承的配套供應和提供個性化的優質服務,公司技術力雄厚,擁有全國一流的專家顧問群,能為用戶提供儲備二個月以上的用減輕工廠的壓力,並保證工廠的生產不會因缺少軸承而影響生產進度。
  4. Modern logistics system simulate optimization this thesis in theory aspect, establish the mathematics model and bring up the calculate way using heuristics method to optimize the right conveyance problem in the simulative logistics system ; solution logistics the center choose problem, make use of the number analysis the method ( center of gravity method ) to proceed the optimization design solution to calculate ; the thesis furthest extrude put great emphasis on the logistics system production total cost had bigness affect and difficult to control over the problem of the manufacture and stock quantity make use of the matlab to bring up the simulative optimization design project separately with simple optimization algorithm and simplex method algorithm

    現代物流系統模擬優化論文在理論方面,用物流系統模擬對運輸優化問題運用啟發式方法建立數學模型、提出演算法;在解決物流中心選址問題時,利用數值分析法(重心法)進行優化設計解算。本文為突出的是運用簡單尋優技術的單純形法利用matlab就物流系統中對總成本有巨影響並難以控制的生產和問題提出可行的模擬優化設計方案。
  5. The result of experimentation on coupling effect of water and fertilizers on spring corn in the three gorges reservoir area indicate that water stresslead the effect low of highness and lai, and the most effect is made in shooting stage ; it has a significant positive correlation between the yield of corn and biomass, and hasn ' t none significant positive correlation between the yield of corn and the weight of roots ; the coupling effect of water and n is significant, but the coupling effect of water and k is not significant, the maximum yield of corn condition fitting - water and medium n, corn absorbs n has a threshold value during the growth, and using superfluous n is able to prick up soil drought and crop drought ; water is the leading factor which effects the yield of corn, next is n and k

    摘要三峽區春玉米盆栽水肥耦合試驗研究結果表明,水分脅迫導致玉米株高和葉面積指數降低,以拔節期受到影響;玉米產與生物呈顯著正相關關系,產與根重無顯著正相關關系;水氮耦合效應顯著,適宜水分和中氮處理下玉米的產高,玉米生長發育對氮肥的吸收在一定的閾值,過多施用氮肥會加劇土壤乾旱和作物乾旱,水和鉀耦合效應對玉米產影響不顯著;水分是影響玉米產的主導因素,其次是氮效應和鉀效應。
  6. The nucleotide ( nt ) sequence of the insert in phz1754 is 2299bps in size. computer assisted analysis of the sequence revealed an open reading frame ( orf ) with a g + c content of 70. 3 % that would encode a protein of 552 amino acids ( aa ). the nt seque nce comparision revealed that the orf in the sequenced region exhibits 85 % dna sequence homology with the cholesterol oxidase gene choa of streptomyces sp

    對phz1754進行外切核酸酶( exonuclease , exo )順序缺失,獲得單向長度漸減重疊的系列突變體,核苷酸序列測定顯示出該ecor - sal片段的精確小為2299bps , frameplot程序分析揭示出該區域一個完整的開放閱讀框( orf )的在,其小為1656bps , g + c含為70 . 3 ,編碼552個氨基酸,利用blastsearch程序將orf的核苷酸序列及推導的氨基酸序列與因特網上基因及蛋白質數據進行綜合比較,發現無論在核苷酸水平還是在蛋白水平上,該orf均與膽固醇氧化酶表現出同源性,而且與鏈黴菌膽固醇氧化酶同源性高,說明該orf編碼膽固醇氧化酶基因。
  7. With an updated analysis on inventory structure and quantity, it provides reliable planning on production, purchasing material requisition and sales. to manage inventory level and stocking in order to control the cause of storage or over storage to achieve the optimism of stocks, inventory turns and storage costs, so as to accelerate the turnover of capitals

    即時處理各種出入憑證,隨時查詢各種資訊,及時分析結構及數情況,有效減少或避免物料的短缺超儲呆滯積壓,限度地降低,減少資金佔用,加速資金同轉。
  8. Aim at ubiquitous parallel multi - reservoir structure in our country ' s basin, the universal objective function including coefficient bi embodying a spatial significance difference at different flood control points and variable ai denoting a selection of scheduling mode is established, which provide a valid intervenor interface for flood control consultation decision. according to the real - time requirement, a model of reservoir storage allocation is proposed, which embody basic idea of phasic compensation. passing the dynamic correction to cut down the disadvantageous influence that indetermination result in on the certain degree, joining together the step alternation solving method, this model can maximally consider bias of decision makers, ensure the rationality and practicability of the solutions

    針對我國流域中普遍在的並聯群結構,論文提出包含不同防洪點重要性的系數_ i和選擇調度模式的變_ i的通用目標函數,為防洪會商決策,提供了有效的人工干預介面,根據實時性要求提出動態分配防洪容的容分配方法,體現了相機補償的基本思想,通過動態修正在一定程度上可以削減不確定性造成的不利影響,結合分步迭代求解技術,能限度體現決策者的偏好,保障解的合理性和可操作性。
  9. Hydroelectric power exploitation can reduce sediment disposal, lengthen life of power plants in lower stream, control stream, better water quality, and reduce contamination etc. considering the structure of power of sichuan province and pointing out its six problems in power development, this thesis comes up with sustainale development strategy of sichuan hydroelectric power exploitation, that is, prefentially exploit large scale hydropower plant which has good water - adapting capability, comprehensively use water resource, try to reduce cost caused by drowning, stimulate rotating exploitation, well deal with settlement of people in hydroproject construction, and alleviate contamination

    論述水電開發在減緩泥沙淤積、延長下游水電站壽命、調控水流、提高供水、改善水質、提供清潔能源、減少環境污染等方面對長江上游生態屏障建設的作用。本文研究分析了四川水電開發的可持續發展戰略,首先對四川省電力結構現狀進行了分析,指出目前四川電力發展在的六個主要問題,從優先開發具有良好調節性能的型水電站、綜合利用好水資源,盡可能減少水淹沒損失,積極推進流域梯級滾動綜合開發,處理好水移民關系,減輕對環境的不利影響等六個方面論述了水電開發的可持續發展戰略。
  10. Secondly, in the first phase, this paper solves the inventory supplement sub - problem through integer programming model, using the reduction of vehicle routes as the breakthrough to this problem, divides a whole distribution region into many customer subsets by radius - circle partitioning method, determines the optimal number of vehicle of service distribution region, applies two practice - oriented conclusions to reduce the number of routes on the basis of customer grouping, thus decreases considerably the variable scale of integer programming, and solves the problem through professional software to fix inventory supplement plan in plan period

    其次,在第一階段使用整數規劃數學模型來規劃補充計劃子問題,以減少車輛巡迴路線數目為求解該整數規劃的突破口,提出與固定劃分策略( fpp )相似的客戶分組思想,通過徑?環切割法把整個配送區域劃分成多個客戶子集,實現客戶分組並確定服務整個配送區域的佳車輛數目。在客戶分組的基礎上建立了精簡路線的整數模型,然後通過運用兩條基於實際經驗的判斷來進一步減少巡迴路線數目,進而極地減少了整數規劃的變規模,並利用專業的求解軟體來求解該整數規劃問題,從而確定計劃期的補充計劃。
  11. The research paper is based on the the latest softwares of the managing inventory, its research subject is about simulating the most appropriate inventory quantity and ordering quantity by statisticing the probability of the random require quantity. its purpose is to provide the relied basement for determining the most appropriate inventory quantity and ordering quantity, the deterring policy quality will be raised, so the damage caused by unfit inventory quantity and the benefit of the entrerpreneur will be raised. the research method is by building the inventory management information system, the system includes automated management of parts entering and going out the datasbase. requesting the records of parts entering and going out the datasbase and displaying the sygonal when the inventory quantity is short out. computer calculating the fix period remaining, requesting remaining at any time and displaying if goods need ordering, all the partsof certain a product going out of basement and at the same time checking if the storaging quantity is enough. then simulating the most appropriate inventory quantity and ordering quantity simulating method is as follows : statisticing the random required quantity. calculating the probability, standing for the values with data range producing random data by function accordingly calculating the random required quantity. thenext step is simulating all the projects after pressing in the simulating conditions. finally selecting the best

    本文通過分析國內外關于管理軟體的發展情況,提出在線統計貨物出情況的基礎上利用模擬方法確定儲方案,其目的是為制定合理的貨物安全和訂貨提供可靠的依據,提高企業管理人員的決策質,從而減小資金的佔用和缺貨損失,提高企業的經濟效益。通過研製管理信息系統使信息管理自動化,也就是實現貨物入出管理計算機管理、自動查詢貨物入出情況並在缺貨時給予提示、使用計算機貨物余額定期結算、貨物余額實時查詢並顯示是否需要訂貨、裝配出管理使得只要輸入需要裝配產品代號和數,組成它的所有零件就會自動檢和出。然後對安全和訂貨進行模擬,模擬方法是首先自動統計貨物在過去某一段時間內的需求,計算出概率,用隨機數的范圍表示其概率數值的小,利用隨機函數產生隨機數、從而間接的產生隨機需求,給定模擬天數和其他模擬條件模擬各種方案,從眾多的儲方案中找出儲方案。
  12. To evaluate maximum and minimum stocks and have effective stocks. to carry out spot checks

    估計,確定有效。執行現場檢查。
  13. In this paper, a single product stochastic inventory model with a random input and a certain output was proposed, and moreover, given the maximum price the firm would be willing to pay to the end user, the critical value policy depending on the initial inventory level is optimal

    本文採用價格對回收數進行控制,基於一個具有可控隨機輸入、固定輸出的單產品隨機模型,在給定回收價格的前提下,以單周期期望費用小為目標,證明了依賴于初始的關鍵值策略結構為優定價結構。
  14. On the basis of principles of quantum teleportation, work that has been done in this thesis is as following : in practice, the entangled state used as quantum channel is always not a maximally entangled state because of interference of environment

    本論文基於子信息中的子隱形傳態思想,開展了如下工作:由於熱引起的消糾纏問題的在,在實際的子隱形傳態過程中,子通道通常不易保持糾纏態。
  15. It also notifies how to advance the design in different situations with or without inventory transforming given a fixed amount of inventory and period of sales. it discloses that the best ordering quantity of a single retail could affect the profits greatly. in the end, two adaptable dynamistic retail price models are raised companied with a case to testify the possibility of improving the profits using this theory

    另外,本文探討了動態零售價格設計要考慮的因素,並完全結合實際情況勾絡了動態零售價格的形成機制;接著,探討了在固定、固定產品銷售時間條件下,結合易逝性高新技術產品零售鏈的實際,分別考慮了有轉移和無轉移的情況下,動態價格策略的不同,並且發現單個零售商其優訂購對收益有很的影響作用;後,在考慮零售的實際情況下,結合動態價格原理,提出了兩個適應性動態零售價格模擬模型,通過一個實例的模擬,更加驗證了動態零售價格提高銷售收益的可能性和可實踐性。
  16. In this paper, process reengineering, quality management, inventory management, just - in - time system, quality assurance system and many other common methods of modern production management are used when wholly demonstrating the repair system reform of urumuqi western car depot. this paper describes mainly the factors which restrict the industrial development and reforms by analyzing the contradiction between the production condition and rail speed - raise and thereby determines the program of repair system reform, a large - scale repair reform was carried out throughout the car depot after the feasibility demonstration by using the decision - making method, finally obtained excellent result

    文中在對烏西車輛段修制改革進行整體論證時運用了流程再造、質管理、管理、準時生產制、質保證體系等諸多現代生產管理的常用方法,論文主要講述的是? ?通過對生產現狀與鐵路提速之間形成的矛盾進行分析來確定出生產過程中制約企業改革發展的因素,並繼而確定出修制改革的方案,運用決策方法進行可行性論證后,在全段開展了規模的修制改革,後取得了良好效果。
  17. 1. building aerial gamma - ray spectrometric database developed with sql server 2000 database management system, the entity - relation model of aerial gamma - ray spectrometric database is designed. a two - level storage structure is adopted to store aerial gamma - ray spectrometric survey data so as to shorten data rebundancy maxmimumly

    建立航空伽瑪能譜數據以sqlserver2000數據管理系統為開發平臺,設計了航空伽瑪能譜數據的實體?關系模型,採用兩級儲結構來儲航空伽瑪能譜測數據,限度地降低了數據冗餘度。
  18. First, utilizing many advanced management technologies, such as business process reengineering, supply chain management, this paper gives reform to material management process as well as customer service process, flattens the " pyramid " type organization structure of company, and puts forward detailed improving measurements for the material requirement forecast and purchase management. then, this paper offers classification for inventory material into abc three groups, amends the mathematical model of classic eoq on the basis of company ' s actual condition, and calculates the main parameter of inventory control. finally, this paper makes economical benefits analysis for the improving results

    第三部分為解決方案和改進措施,首先用業務流程重組的基本原理,對企業經營影響較的物料管理和客戶服務實行流程化管理變革,盡使公司「金字塔」式的組織結構扁平化,並用供應鏈環境下的物料管理等先進的管理方法和技術,對公司的物料需求預測和采購管理提出了具體的改進措施;其次將abc分類控製法引入公司的管理工作,以經典的允許缺貨、生產時間很短的eoq模型為基礎,根據公司的實際情況對此數學模型進行了修正,並對主要的控制參數進行了計算;後對改進的效果進行了經濟效益分析。
  19. My research subject is based on the data warehouse called hdc ( highway decision center ) which our research group have finished previously. after i study the decision tree thoroughly, ! make some improvement on the problems existed in the model and the algorithm. and i finish the development of the classifier successfully. in order to improve the execution efficiency of the decision tree, this paper realizes the integration of the building phase and the pruning phase

    本課題是在課題組前期完成的hdc ( highwaydecisioncenter )數據倉平臺的基礎上進行的,在對cart決策樹進行了深入研究分析的基礎上,針對在的問題對數學模型、演算法等進行了若干改進,終獨立開發了基於數據倉平臺的適合數據cart分類器。
  20. Two main contents of designing the database are proposed, one is to retrieve zipped data according to some rules, which is fulfilled by a few procedures together and can be controlled by input parameters. anther is to clear up the real - time data stored in database timely, which is fulfilled by using dts function in sql server 2000, and the data out of time can be deleted or saved as a access file

    數據的設計中重要的是兩個內容,一個是要將壓縮的離散的數據按照一定的規律返回,這個任務是由幾個儲過程協同完成的,可以輸入參數控制返回;另一個是,實時數據積累在數據倉中,要定時清理過期數據,因此使用microsoftsqlserver2000的數據導入導出工具dts完成了過期數據的刪除或者選擇保為access文件。
分享友人