最大跨距 的英文怎麼說

中文拼音 [zuìkuà]
最大跨距 英文
maximum outreach
  • : 副詞(表示某種屬性超過所有同類的人或事物) most; best; worst; first; very; least; above all; -est
  • : 動詞1 (抬起一隻腳向前或向左右邁) step; stride 2 (兩腿分在物體的兩邊坐著或立著) bestride; stra...
  • : Ⅰ名詞1 (距離) distance 2 (雄雞、雉等的腿的後面突出像腳趾的部分) spur (of a cock etc )Ⅱ動詞...
  • 跨距 : [工業] span; spread; spacing; strided distance; track跨距長度 length of span; 跨距中心 centre of span
  1. The highest bridge in the world measured by distance from deck to ground level remains the royal gorge bridge in colorado, us which is 320 metres 1, 053 feet above the river arkansas

    如果按照從橋面到地面的離來算,世界上高的橋仍然是橫阿肯色河之上,高320米1053英尺的美國科羅拉多州皇家峽谷橋。
  2. Ith a max span of 36m, built - up area of 31608

    最大跨距36米,建築面積
  3. 6 maximum span centre to supports of psb shall be 60. 96mm ( 200 ’ - 0 ” )

    鋼架橋度中心到支柱的離是6090毫米( 200英尺) 。
  4. The 1 596 - metre stonecutters bridge, with a main span of 1 018m, will be the longest cable - stayed bridge in the world. it is the first long - span bridge located in an urban environment in hong kong and will be highly visible from hong kong island and kowloon peninsula

    昂船洲橋全長1596米,主長1018米,建成后將會是世界長的斜拉索橋,亦是本港首座位處市區環境的長吊橋,屆時在香港島和九龍半島都可以望到這座雄偉的建設。
  5. It comprises two bridges, where tsing ma bridge on ma wan channel is the world s longest road and rail suspension bridges with a main span of 1377 meters and a total length of 2. 2 kilometres, and also the main part of the lantau link

    干線由兩組橋組成,其中越馬灣海峽的青馬橋,是現時世界上長的鐵路行車兩用吊橋,達1377公尺,全長2 . 2公里,是青嶼干線的主要部分。
  6. The maximum load, span of supports yuelong brand type cable tray must be less allowable load and span of supports

    「躍龍」品牌系列電纜橋架的載荷、支撐間應小於允許載荷和支撐荷和支撐
  7. Supervision and consultation projects completed : ( 1 ) jiangsu xindadou square ( 50, 000m2, two 30 - story buildings ), worked as chief supervision engineer ( consultation ) ; ( 2 ) " yanqiao overpass service center of xicheng highway ( the first overpass type service center on highway in china ), worked as chief supervision engineer ( consultation ) ; ( 3 ) the ninth 5 - year - plan updating technology project of huaiyin tobacco plant, 50, 000m2, worked as chief ( supervision and consultation ) ; ( 4 ) the softy testing, analysis and consultations of nanjing international conference and exhibition center, site - erected structure, 75m span steel roof truss ( the largest one in china ), worked as chief of test and consultation ; ( 5 ) " the consultation service of the testing, analysis and update technology of the reliability of the joints of intermediate floor slabs, beams and columns of base beam of sanshanjie station of nanjing metro " etc

    完成"江蘇新都廣場( 5萬多平方米,二幢30層) "建設監理咨詢(總監) ; "錫澄高速堰橋線服務區(國內首座) "建設監理咨詢(總負責) ; "淮陰卷煙廠9 . 5技改項目( 5萬多平方米) "建築監理咨詢(總負責) ;主持了"南京國際會展中心75m鋼屋架(國內)現場施工安裝結構安全性測試分析咨詢" ; "南京地鐵三山街站中樓板及底板樑柱節點構造技術安全可靠性的測試分析與技術改進咨詢服務"等項目。
  8. Next, a three - span curve continuous box beam has been studied by fem, and how to set the single - pedestal pier in curve continuous box beams has been discussed. when setting the single - pedestal pier, the vehicle flow should be inspected firstly, and then a best offset distance should be selected within the feasible range of the offset distance. meanwhile, increase the spacing interval of the double supports to the largest extent when installing a double supports on a sharing single - pedestal pier, which can enhance the stability and security of the bridge as a whole

    對上石立交橋中一座三連續的曲線箱梁進行有限元分析,詳細地討論了在曲線箱梁中如何合理設置獨柱墩的問題,分析表明獨柱墩的設置應該根據車流調查的實際情況,再結合結構本身的特徵,在可行的偏范圍內選擇一個佳的偏,另在對公共墩上的雙支座進行設置的時候應該盡量使雙支座的間,這樣可以保證橋梁整體的穩定性和安全性。
  9. The tsing ma bridge, with a main span of almost 1. 4 kilometres, is the world ' s longest suspension bridge carrying both road and rail traffic

    青馬橋的主約為1 . 4公里,是世界上長一條兼有公路及鐵路的吊橋。
分享友人