柱墩 的英文怎麼說

中文拼音 [zhùdūn]
柱墩 英文
column pier
  • : Ⅰ名詞1. (土堆) mound 2. (墩子) a block of stone or wood Ⅱ量詞(用於叢生的或幾棵合在一起的植物) cluster
  1. What is structural area points to form a building to bearing system, the area that the component part place such as mound of the wall of each component, column, wall and partition occupies disjunctive plane

    什麼是結構面積指構成房屋承重系統,分隔平面各組成部分的墻、、墻以及隔斷等構件所佔的面積。
  2. Structural area of the residence is to point to form a building to bearing coefficient, the area that the component part place such as mound of the wall of each component, column, wall and partition occupies disjunctive plane

    住宅的結構面積是指構成房屋承重系數,分隔平面各組成部分的墻、、墻以及隔斷等構件所佔的面積。
  3. The factory undertakes the composing of the following business mainly : white marbl carved stone crouches the lion, the sleeping white marbl carved stone lion leak from the lion, white marbl carved stone, white marbl kylin, white marbl mythical wild animal ( pixiu ), white marbl dragon and phenix lamp pole, white marbl ornamental column, the cattle opening up virgin soil, white marbl figure of the buddha, the top of a pillar stone, white marbl fairy maiden, white marbl personage, white marbl carved stone elephant ( figure in stone ), white marbl dolmen, white marbl shi ting, stone bridge, white marbl stele, white marbl check dragon post, white marbl balustrade, granite dysmorphism, stone strip, flat piece of stone, foundation stone, door block, jade article treating, emboss, ornamental column, dragon post, lettering, silica sand, white marbl woollen cloth, ancient times build gardens ( breast board, platform ming dynasty, artificial stone with textures cut with an axe, rockery design, flowerpot, eroded limestone, mechanism cobblestone, mushroom stone etc. ), rockery fountain, nursery stock flowers and plants etc. paper of, saying that the stone table, stone bench, stone light, board carve characters on a seal, the column, vase post, window cover with, the door pocket, geomantic omen ball wait, and managing

    本廠主要承做以下業務:漢白玉石雕蹲獅、漢白玉石雕走獅、漢白玉石雕臥獅、漢白玉麒麟、漢白玉貔貅(皮休) 、漢白玉龍鳳燈、漢白玉華表、拓荒牛、漢白玉佛像、頂石、漢白玉仙女、漢白玉人物、漢白玉石雕大象(石像) 、漢白玉石牌坊、漢白玉石亭、石橋、漢白玉石碑、漢白玉盤龍、漢白玉欄桿、花崗巖異形、石條、石板、漢白玉奠基石、門、玉器加工、浮雕、華表、龍、刻字、硅砂、漢白玉毛料、古建園林(欄板、臺明、剁斧石、板道、石桌、石凳、石燈、牌匾刻字、圓、花瓶、窗套、門套、風水球等,並經營假山石、花盆、太湖石、機制鵝卵石、蘑菇石等) 、假山噴泉、苗木花卉等。
  4. The second temporary pier was such that its legs straddled the width of the pier.

    第二臨時的立間距超過橋的寬度。
  5. Construction of pier and pierhead completed

    已完成的橋
  6. Precast pier - head segment erection with lifting frame

    用吊架安裝橋頂預制構件
  7. The superstructure of the bridge is a three - span ( 80m + 130m + 80m ) continuous rigid frame. the main piers are single - column flexible solid piers, whose foundation are 2. 0m dug piles. the abutments are light - type box abutments, whose foundation are 1. 2m bored cast - in - place piles

    該橋上部為80m + 130m + 80m三跨連續剛構;主為單柔性實體,其基礎為2 . 0m挖孔樁;橋臺為輕型箱式橋臺,其基礎為1 . 2m鉆孔樁。
  8. The design and construction of obliquely supported high bent for pier cap beams of lu pu bridge

    上海盧浦大橋蓋梁斜撐高排架的設計和施工
  9. After the vibration test and analysis on the chuhe bridge, we drafted to reinforce the bridge ' s double - pillar type light buttresses. we accomplished the testing buttresse reinforcement while under the premises of without railroad break - off. it outlined one of the optical methods to reinforcing the double - pillar buttresses of the whole bridge

    通過對滁河特大橋的振動測試分析,確定了該橋雙式輕型橋的加固方案,並針對在不中斷行車的前提下,研究制定了加固施工工藝,高質量地完成了試驗橋的加固工作,為全橋其他雙式橋的加固提供了可供選擇的優良方案。
  10. Experimental investigation on width of superficial eddy area around cylindrical pier

    周圍水流表層渦漩區寬度的試驗研究
  11. Visual impacts will be mitigated by treesclimbers planting below the viaduct and on columns and parapets, reinstatement of fishponds and integration of the viaduct design with the local environment

    九鐵會在高架橋下面種植樹木,並以攀藤植物粉飾橋身和柱墩,而高架鐵路的設計亦會盡量與環境融和,把視覺上的影響減至最少。
  12. A series of arches supported by columns, piers, or pillars

    拱形建築物由、橋或臺支撐的一系列拱
  13. Considering the past research results, frost resistance of concrete using portland cement, and the designed service life of 100 years of testing bridge, the control indexes of high durability concrete are defined in this paper. mixture proportion of concrete used in pier column, coping, precast box beam and plate of bridge is designed based on the compact pile theory, and construction technique is studied also

    結合課題組以往的研究成果,根據試驗橋設計使用壽命100年的要求,確定出高耐久性混凝土的設計控制指標,基於最緊密堆積原理和最佳漿骨比原理對橋梁的、蓋梁、預制箱梁和橋面板用高耐久性混凝土的配合比進行設計,並對其施工應用技術進行了研究。
  14. Widening design of bent cap of cylinder pier platform

    臺蓋梁的加寬設計
  15. Ignoring the jerking of her chest muscles and holding her breath resolutely, she pushed away from the post and swam along the bridge shadow. the bridge was long, but it had to lead to shallow water. she kept going

    顧不得胸肌的抽搐,拼全力憋住呼吸,她離橋那根支,沿著橋的影子游去。橋是很長,但總有淺水橋端。她不停地游。
  16. Soil nailing near wsd catchwater has been completed and grouting for piling at the central pier of bridge no. str17 will commence

    鄰近於長沙引水道的泥釘工程經已完成,與及將會為橋編號str17的中間橋展開樁灌漿的工程
  17. Failure or even collapse of bridge structures in past earthquakes were largely. in particular, shear failure of short bridge pier columns is the most dangerous failure pattern due to the brittle nature. consequently, it is quite meaningful to study the seismic resistance performance and retrofitting for reducing bridge damages and losses

    從已建橋梁在歷次地震中破壞的共同特點可以看出:現代混凝土橋梁結構中,因鋼筋混凝土橋破壞導致橋梁嚴重破壞甚至倒塌,已成為橋梁震害的主要特點,特別是橋梁短的破壞尤為嚴重,而脆性剪切破壞是鋼筋混凝土短最為危險的破壞方式之一。
  18. Calculated length of compression bar in pile bent column pier

    單排樁柱墩壓桿的計算長度
  19. In this paper, i have analyzed the distortion of continuous rigid frame bridge at the condition of temperature uniform change by displacement method and finite element method computer aided design program - sap91. it included : the distortion and inner force condition at the bottom of single pier when it is consolidated, the distortion and inner force condition of thin double piers - rigid frame bridge ; the distortion and inner force condition of thin double piers - rigid frame bridge when the consolidation is elastic consolidation and confinement adopted different rigidity factor ; and the inner force condition of thin double piers - rigid frame bridge when the distance of piers is different

    本文利用位移法和結構有限元電算程序sap91 ,對連續剛構體系橋梁在受到均勻溫變情況下:底固接單柱墩、雙薄壁連續剛構橋;底彈性固接時的雙薄壁連續剛構橋採用不同轉動約束剛度系數情況;以及雙薄壁間距不同的連續剛構橋梁的受力情況進行了分析和比較。
  20. Next, a three - span curve continuous box beam has been studied by fem, and how to set the single - pedestal pier in curve continuous box beams has been discussed. when setting the single - pedestal pier, the vehicle flow should be inspected firstly, and then a best offset distance should be selected within the feasible range of the offset distance. meanwhile, increase the spacing interval of the double supports to the largest extent when installing a double supports on a sharing single - pedestal pier, which can enhance the stability and security of the bridge as a whole

    對上石立交橋中一座三跨連續的曲線箱梁進行有限元分析,詳細地討論了在曲線箱梁中如何合理設置獨柱墩的問題,分析表明獨柱墩的設置應該根據車流調查的實際情況,再結合結構本身的特徵,在可行的偏距范圍內選擇一個最佳的偏距,另在對公共上的雙支座進行設置的時候應該盡量使雙支座的間距增大,這樣可以保證橋梁整體的穩定性和安全性。
分享友人