橋墩承臺 的英文怎麼說

中文拼音 [qiáodūnchéngtái]
橋墩承臺 英文
pier cap
  • : 名詞1. (橋梁) bridge 2. (姓氏) a surname
  • : Ⅰ名詞1. (土堆) mound 2. (墩子) a block of stone or wood Ⅱ量詞(用於叢生的或幾棵合在一起的植物) cluster
  • : Ⅰ動詞1 (托著; 接著) bear; hold; carry 2 (承擔) undertake; contract (to do a job) 3 (客套話...
  • : 臺名詞(指臺州) short for taizhou (in zhejiang province)
  • 橋墩 : (bridge) pier
  1. The factory undertakes the composing of the following business mainly : white marbl carved stone crouches the lion, the sleeping white marbl carved stone lion leak from the lion, white marbl carved stone, white marbl kylin, white marbl mythical wild animal ( pixiu ), white marbl dragon and phenix lamp pole, white marbl ornamental column, the cattle opening up virgin soil, white marbl figure of the buddha, the top of a pillar stone, white marbl fairy maiden, white marbl personage, white marbl carved stone elephant ( figure in stone ), white marbl dolmen, white marbl shi ting, stone bridge, white marbl stele, white marbl check dragon post, white marbl balustrade, granite dysmorphism, stone strip, flat piece of stone, foundation stone, door block, jade article treating, emboss, ornamental column, dragon post, lettering, silica sand, white marbl woollen cloth, ancient times build gardens ( breast board, platform ming dynasty, artificial stone with textures cut with an axe, rockery design, flowerpot, eroded limestone, mechanism cobblestone, mushroom stone etc. ), rockery fountain, nursery stock flowers and plants etc. paper of, saying that the stone table, stone bench, stone light, board carve characters on a seal, the column, vase post, window cover with, the door pocket, geomantic omen ball wait, and managing

    本廠主要做以下業務:漢白玉石雕蹲獅、漢白玉石雕走獅、漢白玉石雕臥獅、漢白玉麒麟、漢白玉貔貅(皮休) 、漢白玉龍鳳燈柱、漢白玉華表、拓荒牛、漢白玉佛像、柱頂石、漢白玉仙女、漢白玉人物、漢白玉石雕大象(石像) 、漢白玉石牌坊、漢白玉石亭、石、漢白玉石碑、漢白玉盤龍柱、漢白玉欄桿、花崗巖異形、石條、石板、漢白玉奠基石、門、玉器加工、浮雕、華表、龍柱、刻字、硅砂、漢白玉毛料、古建園林(欄板、明、剁斧石、板道、石桌、石凳、石燈、牌匾刻字、圓柱、花瓶柱、窗套、門套、風水球等,並經營假山石、花盆、太湖石、機制鵝卵石、蘑菇石等) 、假山噴泉、苗木花卉等。
  2. In which, it gives inquiring of the construction of deep - water foundations and the usage of floating crane. the construction program of bridge pier foundation will be fixed according to the water depth. if the water depth is less than 4m, pier foundation will adopt the method of building island by earth filling ; if the water depth is more than 4m and there is over burden at river bed, at the same time, it has sufficient bearing capacity to load steel pipe pile, the steel pipe pile platform will be adopted

    其中,對深水基礎的施工及浮吊的使用進行了探討,根據水深確定基礎的施工方法,對水深不超過四米的基礎,採用填土築島的方法:對水深大於四米,河床有覆蓋層,且能保證鋼管樁具有足夠的載力的,採用鋼管樁平;對主河道上河床沒有覆蓋層,鋼管樁無法插打的,採用浮式平
  3. Construction of cofferdam for bearing platform and steel sheet pile of main piers of huangzhou bridge

    黃洲大鋼板樁圍堰施工
  4. In the light of the low - lying pile cap foundations designed for main piers no. 2 and no. 3 of tianluo bridge on wenzhou - fuzhou railway. this paper describes the ways to resolve the construction problems of the foundations in deep water in sea and at seabed that is steep and without overburden, using the construction techniques of underwater rock blasting, steel cofferdam floating, positioning, bottom sealing and manual pile digging

    摘要針對溫福鐵路田螺大2號、 3號主設計上採用低樁基礎情況,介紹運用水下巖石爆破,浮運鋼圍堰就位、封底、人工挖孔樁等施工技術解決海上深水、河床陡峭且無覆蓋層的基礎施工難題。
  5. Based on the construction practice of steel cofferdam for pier base of main pier no. 6 close to the pylon of sutong bridge, the key techniques for design and construction of the deep water double - wall steel cofferdams of the bridge are described

    摘要以蘇通大近塔主6號鋼圍堰工程實踐為基礎,介紹該深水雙壁鋼圍堰設計、施工的關鍵技術。
  6. Temperature control of no2 abutment concrete mass in huangcao bridge of wujiang river

    黃草烏江大2號大體積混凝土溫度控制
  7. The energy due to the beam ' s falling is overwhelming. this impact will do great harm to the sub structure. the beam ' s falling, mainly because the displacement of the pier ' s top supporting the beam makes the span become greater, or the pier ' s displacement brings the beam change its position, which makes it come away from the pier ' s top

    對于簡支梁,當地震作用發生時,落梁是一種主要的破壞形式,落梁的能量具有壓倒性優勢,沖擊會給下部結構帶來極大的影響,而墜落的原因,多數由於支梁的兩頂位移而使跨度變大,或是因為位移帶動梁使梁錯位,造成梁在頂處脫開。
  8. The overall length of the bridge is 27. 2km, and the bridge piers, composed of steel piles and platforms, have resistance to the flow in some degree

    整個長27 . 2km ,由鋼樁和組成,對水流有一定的阻力作用。
  9. This test combines the temperature control of the base slab of big bridge in yangtze river of badong, study and analyze the regulation for changing of internal temperature field and stress of mass concrete and the measure ' s actual result of thermal control that adopt hi the engineering

    本文結合湖北巴東長江大7 ~ #主大體積混凝土溫度控制的工程實踐,研究分析了大體積混凝土內部溫度場和溫度應力變化的規律和工程中採用的溫控措施的實際效果。
  10. Then analysis the testing data at the base slab of big bridge in yangtze river of badong comparing with calculating result. by means of this, conclude the principle of temperature field and thermal stress, summarize the effect of different crack control measures, propound some useful suggestions for worksite, show the direction for further more investigation at last

    對巴東長江大施工現場主溫度、應力測試結果和計算結果的分析比較,總結了大體積混凝土溫度場和溫度應力變化的一般規律,討論了施工現場常用控制溫度技術措施的實際效果,提出了施工現場裂縫控制的一些建議。
  11. The analysis of the testing data of temperature and thermal tress at the base slab of the badong yangtze bridge, study the regulation for changing of internal temperature field and thermal stress field of mass concrete

    通過對巴東長江大施工現場主的溫度和應力測試結果分析,研究了大體積混凝土內部溫度場和溫度應力場變化規律。
分享友人