橋梁工長 的英文怎麼說

中文拼音 [qiáoliánggōngzhǎng]
橋梁工長 英文
bridge foreman
  • : 名詞1. (橋梁) bridge 2. (姓氏) a surname
  • : 名詞1 (屋架中架在柱子上的長木) beam 2 (通常也指檁) purlin 3 (橋) bridge4 (物體中間條狀隆起...
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • : 長Ⅰ形容詞1 (年紀較大) older; elder; senior 2 (排行最大) eldest; oldest Ⅱ名詞(領導人) chief;...
  • 橋梁 : bridge; approach
  1. B87c breaker is a pneumatic instrument manufactured with the mature technology of america gardener denver corporation. it is more powerful in breaking ferroconcrete, rocks and asphalt. boasting greater efficiency and durability, it suits the requirements of breaking outsized, super - thick and hard objects. it is ideal machinery for the substructural construction of mines, bridges, roads and civil infrastructure

    B87c破碎機採用美國迦納德?丹佛氣動集團公司成熟技術,是以壓縮空氣為動力的破碎具,能高效完成鋼筋混凝土、巖石、瀝青等破碎作,具有馬力更大、效率更高、壽命更等特點,特別適宜對特大、特厚、特堅硬物體的破碎作業,是礦山、、道路、市政建設等基礎程施的理想具。
  2. The basket symmetrical cantilever construction, which is often used, is one way of large - span bridge construction. with the length of cantilever longer, the risk is increased as well

    掛籃對稱懸臂施是大跨度中常用的一種方法,隨著懸臂度的加,風險也隨之加大。
  3. There has not been a scientific design theory about the jointless bridge whereas it has been conducted successfully for a long time in the u. s. the actual design ways basically depend on the experience and observaration. what is more, the analytical method and the design of the crunodal details are still dealed with on the whole. in fact, it is a very important part to deal with the crunodal structure between the abutment and beam in the design and conduction of the jointless bridge. in addition, the loaded properties of the crunode are the key and difficulty in the study of the jointless bridge. therefor, there are engineering and practical significances of analyzing the crunodal structure and studying its loaded properties

    盡管無伸縮縫在美國已經成功地使用了很時間,但至今還沒有一個比較科學的設計理論。目前的設計方法基本上依賴于經驗與觀察,還沒有從根本上解決無伸縮縫有關的分析方法和設計細部構造。應該說,對于無伸縮縫而言,處理臺與主的結點構造是設計和施中非常重要的部分,結點部分的受力性能是研究無伸縮縫的重點和難點。
  4. Based on the background of a city key construction project 棗 hongshan bridge, the loading characteristics of the deck system consisting of mutirow cantilever in composite structure of steel and concrete is studied in the thesis

    本文以沙市洪山大程背景,對組成面板系的多排懸臂鋼-混凝土組合的受力特點進行了研究和探討。
  5. Location : nguyen van linh st. distr. 7, hcmc work description : 17. 8km long, 10. 5m wide two lane road, including 10 nos. bridges with overall 1450. 8 meter

    南西貢大道程位於胡志明市阮文靈大道。程包括17 . 8公里10 . 5米寬道路和全1450 . 8米的
  6. Hydraulic pile hammer is one of the pile driving machines that drive prefabricated piles into the ground in the construction of pile foundation such as construction, bridge, dock, etc. with the development of science and technology, the prefabricated pile driving machines evolve from block hammer, steam - hammer, diesel hammer to hydraulic hammer. hydraulic pile hammer is one of ideal prefabricated pile driving machines because it can adjust stress waveform, decrease stress peak value, prolong effectual action when it drives piles. hydraulic pile hammer is used widely and formed series in developed countries now

    液壓打樁錘是用於建築、、碼頭等樁基礎施中打入預制樁的樁機械。隨著科學技術的進步,預制樁施機械由落錘、汽錘、柴油錘,發展到了液壓打樁錘。用液壓打樁錘打樁,可以調整撞擊應力波波形,減小應力峰值,延有效作用時間,是一種比較理想的預制樁施機械,目前在發達國家已被廣泛使用,並形成了系列化。
  7. Since the air pressure sink - box technology was abandoned, and the steel - plate peg round the barrage pipe peg foundation was adopted at first time in the wuhan changjiang bridge project, the steel round the barrage has been adopted in bridge foundation construction more and more. especially after the double wall steel sink well round the barrage bore peg foundation was creatively adopted in jiujiang changjiang bridge foundation, which was built in 1985

    自從武漢江大程中擯棄了過去一直沿用的氣壓沉箱,首次採用了鋼板樁圍堰管柱基礎以來, 1985年建成的九江江大基礎獨創性地採用雙壁鋼沉井圍堰鉆孔樁基礎,鋼圍堰在基礎施中的應用越來越多。
  8. Secondly, calculation theory of construction for suspension bridge is presented under the ideal condition of dead load design. linetype change stiffness of cable and slip stiffness of supporting points are deduced based on segmental catenary theory. then numerical analysis method through sgkz2000 software are introduced in detail about calculating design linetype for suspension bridge, unstressed length of cable, erection linetype of cable and pre - displacement of saddle without loads, erection linetype of wire strands, the fixed position for erecting cable band and linetype of lifting stiffening girders

    其次,根據懸索恆載設計理想狀態建立了懸索計算原理;以分段懸鏈線索理論為基礎,推導了懸索的線形變化剛度和懸索支點的滑移剛度;介紹了懸索設計線形計算、吊索無應力度計算、空纜線形與預偏量計算、絲股架設線形計算、索夾安裝位置計算和加勁吊裝線形計算的具體方法、數值演算法及軟體sgkz2000的計算模塊的實現。
  9. There are many materials and members to be hoisted during construction of the suspension bridge, unfortunately, the out - spread overhead curved cable makes it impossible for hoisting the stiffening girder with normal cable - supported lift. in order to ensure the construction proceeded smoothly, a multifunctional overhead cableway system is developed, thus accommodating all the hoisting tasks for the superstructure ( stiffening girder )

    懸索中需要吊裝的材料和構件很多,豐都江大懸索主纜採用空間外張式,使加勁的吊裝不能採用一般的纜載吊機形式,為使施的順利進行,本中開發了多功能高架索道施方案,以一副索道完成了多種作,全面解決了上部結構(包括加勁)的多項吊裝作業。
  10. So it will speed up the erection of bridges and shorten the time of construction. 3

    ( 3 )施機械化程度高,特別適合於的快速施
  11. The machine can adopt positive and negative circulation and other deep drilling technique, adapts to various stratum, is the first selected equipment for foundation construction of river ' s bridge and dock, and also adapts to large diameter borehole construction such as tall building, coal mine vertical well and sewage well, it exerts great action many changjiang river large scale bridges foundation construction

    該機可採用正反循環等鉆進藝施,適合於各種地層,是江河、碼頭基礎施的首選設備,也適用於高層建築、煤礦豎井和污水井等大口徑鉆孔施,在多座江大型基礎施中發揮了巨大作用。
  12. Speaking at a ceremony to mark the completion of works on the main drainage channels for river indus, river beas and river sutlej, the director of territory development, mr wong hung - kin, said today ( september 17 ) that the works for these three rivers in the river indus basin were sizable and entailed the straightening and widening of some 9km of existing meandering rivers with raised river embankments. the works also included the re - provisioning of existing facilities that were affected by the projects such as the reconstruction of 12 river - crossing bridges

    拓展署署黃鴻堅今日(九月十七日)在梧桐河、雙魚河及石上河主要排水道程竣典禮上致辭時表示,整項梧桐河盆地的治河程涉及上述三條位於新界北區的主要河道,規模龐大,新河道總約9公里,將原來迂迴曲折的河道拉直及擴闊,並且將河堤加高及重置受程影響的原有設施,包括12條過河
  13. With the great development of brides with large - scale span in china, the application of superlong and superhigh bridge pile in construction is increasingly popular, so that the bridge - pile buckling analysis ( hereafter abbreviated as bpb analysis ) gradually receives its due importance

    隨著我國大跨度的高速發展,超、超高的基樁在程建設中應用日益廣泛,因此基樁的屈曲分析也日益受到應有的重視。
  14. Making reference to the anqing changjiang river highway bridge construction and the construction control, firstly, this paper studies the philosophy of the cable - stayed bridge construction control simulation analysis systematically, and pays much attention to the theory of simulating the construction process : backward analysis and forward analysis. then on the basis of introducing the construction process of the anqing changjiang river highway bridge, analysis the construction course fully, and analysis comparatively the result of each girder segment construction simulation, and study the variation philosophy of the line style of large cable - stayed bridge during construction

    本文緊密結合安慶江公路大的主及施控制實踐,首先系統地分析了斜拉控制模擬計算的整體思路,並重點分析探討了斜拉過程計算的理論:理想倒退分析和實時前進分析,然後在介紹安慶江公路大過程的基礎上,全面地計算分析了全的施過程,並且應用施過程計算結果,對每一個段的施模擬況進行對比分析,研究了大跨度鋼斜拉在施過程中的線形變化規律。
  15. It has also pounded the keys, devices, disposition of surveyed spots, measure method and procedures, data gathering and process ( relation with construction workmanship ), error analysis and adjustment, control precision and rules, mechanism and method of control, tables of records, results and discussion. after completion, the bridge has good behaviors in dead loads state, cable forces, shape style of main beam, stress and strain of concerned sections, displacements of the tower top, which assure the reasonable state of cables, main girder and towers, and safe under running, demonstrate supervision

    通過課題研究與實運用,荊州江公路大斜拉過程各狀態和成恆載狀態下,斜拉索索力、主線形、主關鍵截面應變、索塔塔頂水平偏位等關鍵項目的施控制結果均滿足設計期望值的要求,滿足范圍的要求,大線形流暢,斜拉索、主和索塔三大體系的受力狀態合理,結構安全可靠,大的監測監控取得了圓滿成功,並為該營運階段的期監測監控奠定了良好的基礎。
  16. Yhppdi is a member of executive board of china survey and design society, china highway survey and design society, communications standardization society, bridge engineering branch of china highway society, yunnan engineering consultancy society, yunnan survey and design society, standing member for executive board of yunnan survey and mapping society as well as yunnan highway society

    雲南省公路規劃勘察設計院是中國勘察設計協會及中國公路勘察設計協會理事單位,中國《交通標準化》理事會理事單位、中國公路學會委員會理事單位、雲南省程咨詢協會理事單位、雲南省勘察設計協會副理事單位、雲南省測繪學會常務理事單位、雲南省公路學會常務理事單位。
  17. With the fast development of large span bridge and high - rise buildings, the bearing capacity and the length of piles are increasing, and the analysis and design principle of piles under inclined loads has been become a problem to be solved in civil engineering

    隨著我國近年來大跨徑及高層建築的迅速發展,基樁的承載能力及樁日益增大,傾斜荷載下基樁的受力分析和設計理論已成為目前土木程界亟待解決的重要問題之一。
  18. The committee are seriously concerned that because of the confidentiality provisions in the general conditions of contract for the bridge contracts concerned, the director of audit has to exclude from his report the relevant information, i. e. detailed information relating to the contractors, the dispute resolution processes and the settlement sums, thereby causing unnecessary delay in the committee s work and reducing the overall usefulness and timeliness of the director of audit s report

    委員會深切關注到,基於有關合約的合約一般章程所戴的保密條文,審計署署須在其報告書內剔除有關資料,即關于承建商、解決爭議過程及和解金額的詳情,以致委員會的作出現不必要的阻延,並減低了審計署署報告書的整體效用及在時間上的適切性。
  19. A new method, which is based on the force equilibrium condition and the geometrical compatibility condition of cable, according to the constant unstressed length of cable, is presented in this paper to determinate the geometric of suspension bridge free cable. numerical examples with humen suspension bridge are given to demonstrate the effectiveness and the validity of the proposed method

    根據索的力的平衡條件及變形相容條件,由纜索無應力度不變的原則來建立纜索狀態方程,提出了懸索主纜空纜狀態線形分析的一種新方法.以虎門懸索為例對該方法的正確性和適用性進行驗證,可供程技術人員設計參考
  20. Abstract : a new method, which is based on the force equilibrium condition and the geometrical compatibility condition of cable, according to the constant unstressed length of cable, is presented in this paper to determinate the geometric of suspension bridge free cable. numerical examples with humen suspension bridge are given to demonstrate the effectiveness and the validity of the proposed method

    文摘:根據索的力的平衡條件及變形相容條件,由纜索無應力度不變的原則來建立纜索狀態方程,提出了懸索主纜空纜狀態線形分析的一種新方法.以虎門懸索為例對該方法的正確性和適用性進行驗證,可供程技術人員設計參考
分享友人