正拱 的英文怎麼說

中文拼音 [zhēnggǒng]
正拱 英文
right arch
  • : 正名詞(正月) the first month of the lunar year; the first moon
  • : Ⅰ動詞1 (兩手相合 臂的前部上舉) cup one hand in the other before the chest 2 (環繞) encircle; ...
  1. In this paper, a new amendatory shear mechanism of beams and columns based on the " truss + arch " mechanical model is put forward

    在本文中修的提出了建立在桁架+力學模型基礎上的抗剪理論。
  2. Therefore how to simulate exactly an arcuated built - up system bridge, carry calculation and design of it and obtain behaviors in accord with facts, is a urgent task in front of bridge workers

    因此如何確模擬式組合體系橋梁,進行式組合體系橋梁的設計和計算,獲得符合實際的受力性能,一直是擺在橋梁工作者面前的一項迫切任務。
  3. The first power station of jinping mountain lies in the west section of the yanglongjiang river from santan to shoupagou gully, with a double - curved arch dam of 305 - meter height and a normal water storage of 1880metres. the exposed strata of the damsite are marbles and arenaceous rocks of triassic and solution fissures have been developed in the marbles of the left - bank ' s dam abutment, and they have become a stratum of strong leakage. as a result, it has been an important problem for the dam foundation to stop leakage

    錦屏一級電站位於西雅礱江的三灘至手爬溝河段,壩型為305米高雙曲壩,常蓄水位標高1880米。壩址區出露的地層為三疊系雜谷腦組二段大理巖和三疊系雜谷腦組三段的砂板巖。在勘探過程中,發現左岸壩肩大理巖體中的構造裂隙和溶蝕裂隙發育,且成為強滲透地層,為此壩基的防滲成為重要問題。
  4. When you come riding shinto rock basilica, will feel the immediate reforms, black streams at the foot of remote contingency, left alone in front of miles - rock blast surrounding rock, right in front of the soaring rock - wing chui days, the public is the front - tianzhufeng arch supporters, was full of castle peak, fog enveloped, lin qiong court palace, dan greenfield wall tile, people instantly durian for cents feeling

    當您踏神道走過南巖大殿,會覺眼前豁然開朗,腳下黑虎澗幽深不測,左前方獨陽巖萬丈削壁,右前方飛升巖飛翼垂天,前方天柱峰眾山擁,滿目青山,雲霧繚繞,琳宮瓊閣,丹墻翠瓦,讓人頓生飄飄欲仙之感。
  5. Which went on to boffo ticket sales with the charismatic andy lau as aaron, a rich businessman shipwrecked, stranded and mistaken for an illegal immigrant. taken in by a close - knit family who owns a grocery store on the rural island, he reinvents himself as a simple man while falling in love with the store owner s daughter

    本片與九一神鵰俠侶於九一年聖誕檔期同日推出,一部是劉德華架起天幕,希望別人如他所願去看他,另一則是王晶給予身的嘉許,群星照,扶劉德華的巨星地位。
  6. Clough, r. w., " reservoir interaction effect on the dynamic response of arch dams ", proceedings of us - prc bilateral workshop on earthquake engineering. vol. 1, august, 1982, harbin, china

    張楚漢、王綦,緊水灘壩動力分析,壩技術(中國壩情報網刊物) , 1985年三期
  7. For jiangpinghe double - curved arch dam, 3 - d elasto - plastic fem is made, in which the point safety factors of the dam - abutments system and the safety margin for coefficients of sliding resistance on 7 potential sliding blocks of the dam before and after the reinforcement of the dam are calculated under the conditions of the normal storage level and the design flood level respectively based on the results from the analysis made with fem

    摘要對江坪河雙曲壩進行了三維彈塑性有限元分析,利用有限元應力成果分別計算了常蓄水位、設計洪水位等3種工況下加固前後壩體壩肩系統的點安全系數和7個可能滑動塊體的抗滑富餘系數。
  8. The box beam ' s temperature stress of longitudinal direction and transverse direction with different conformation are analyzed, it finds that there is largish temperature tensile stress in the bottom of top deck and the haunch of box beam increase temperature tensile stress in the bottom of top deck. the paper makes a study of different thermal effects resulted from several kinds of closed rigid frame

    根據大量實測溫度場結果建議採用一個有利於理論推導的指數函數的公式來擬和箱梁體內的溫差分佈,既貼近實測數值,計算又比較簡單;通過對空腹式剛架橋尤溪洲大橋所在地夏季、秋季、冬季的溫度場及溫度應力的實測,以及與本文所提出計算方法的理論解進行的分析比較,證實了本文計算方法的確,同時改進了已往混凝土箱梁溫度自應力的計算方法。
  9. Specification and type for conventional domed metallic bursting discs

    正拱形金屬爆破片型式與參數
  10. Combining with the performances of danshan bridge, discussing the methods on the construction controlling and calculation of cable - stayed bridge, this paper raises an efficient construction controlling system, and realizes collecting construction data of the real bridge and technical information. by analyzing on the difference of theoretical calculation and real construction state, the author determines to take self - adapting construction controlling method which uses kalman filter method to identify and adjust construction parameters. by getting rational construction state from forward iteration method, this paper, taking concrete creep effect in consideration, raises a rational scheme to pre - remain deformation and adjust cable force

    結合丹山橋的結構特點,通過對斜拉橋施工控制及結構計算方法的探討,提出了有效的施工控制系統,實現了對實橋施工數據和技術信息的採集;通過分析理論計算與實際施工狀態的差異,確定了以卡爾曼濾波法作為施工參數識別與調整的自適應施工控制方法;通過裝迭代法確定其合理施工狀態,並考慮混凝土的徐變效應,提出了合理的預留度和索力調整方案。
  11. Presently, cfst arch bridges develop in the direction of large - span and lightweight style, accordingly, investigators and devisers should increasingly attach more importance to their dynamic behaviour, and some typical dynamic matter of bridges, such as seismic response, wind induced vibration, coupled dynamic vibration between bridge and vehicle should not be ignored

    目前,鋼管混凝土朝大跨、輕型的方向發展,因此,該類型橋梁的動力特性也日益引起重視,象地震、風振、車振等橋梁的典型動力問題也是該類橋梁所無法迴避的。
  12. A few paces off is an enormous pillar, and another ? seven in all down the length of the hall, supporing in the centre line the springing arches of the double groining

    幾步開外有根高大的柱子,接著又一根,再接著又是一根;大廳縱深一共豎著七根大柱,支撐著雙屋頂落在橫向中的底石。
  13. This combination of influences is illustrated by the city ' s robust walls, archways and vaults, courtyards and open spaces, and the intricate baroque decoration of its facades

    城市靈動的城墻、門、形屋頂、院子、開闊的空間,以及建築面復雜的巴洛克式裝飾,這些都表明了歐洲與本土風格的雙重影響。
  14. In this method, the arch roof with corrugations is equivalent to orthotropic shells, and the equivalent elastic coefficients are determined by simplified calculating formula

    在該方法中,將帶波紋的板等效成交各向異性殼,板殼的等效彈性常數由簡化計算公式確定。
  15. The scheme is a transition between the box girder with vertical piers and the true arch.

    該結構是具有垂直墩的箱梁橋鋼與真橋之間的一種過渡形式。
  16. Based on the discuss of the geologic environment of the high slope of spandrel groove jinping i hydroelectric power station. and the engineering geological conditions of rock mass are carefully studied in the paper. the modified csmr are adopted to perform the classification of the slope rock mass, the results of which are combined with the macroscopic stability of the high slope. on the basis of these, the methods of geological diagnosis and the finite element analysis are applied to analyze and compute the overall stability of the high slope

    本文在闡明錦屏一級水電站壩區巖體的形成和演化特徵的基礎上,詳細研究了肩槽高邊坡巖體的結構特徵及岸坡巖體淺表生改造特徵,建立了岸坡巖體淺表生改造與岸坡演化模式,分析研究了巖體的物理力學性質,採用修的csmr法對肩槽高邊坡的巖體質量進行分級研究,在此上基礎之上,採用地質分析判斷和有限元分析等方法,對高邊坡整體穩定性進行了系統分析、計算與評價;應用塊體理論對高邊坡的局部穩定性進行了分析計算,確定局部不穩定塊體的規模、出露范圍,從而對肩槽高邊坡的局部穩定性有了系統全面的認識和了解。
  17. The impressive facade of the green - brick study hall is distinguished by the solemn granite - block wall base and the overhanging roof supported by ornamental brackets, camel humps and granite columns

    書室面以花崗石塊和青磚築砌,屋頂檐下是雕刻精美的斗、駝峰和花崗石支柱。
  18. The methods of modificatory lattice cross - section and equivalent circular cfst cross - section for calculating the maximum load of dumbbell cfst columns with eccentric loading were presented in this paper. the ultimate strength of 14 specimens were calculated by the two methods were close to experimental results. finally, the two methods were used to calculate the ultimate strength of arch bridge of zhengzhou yellow river highway

    對現有鋼管混凝土啞鈴形構件極限承載力的計算方法進行了分析,在此基礎上,提出了計算鋼管混凝土啞鈴形構件的偏壓極限承載力的修的格構式截面法和等效截面法,兩種演算法的計算結果與試驗值均吻合較好,最後用這兩種演算法計算了鄭州黃河公路二橋肋的極限承載力。
  19. The scale and height of rolling - concrete are spread increasingly, such as the technique studied recently that the 300 meters high gravity dam and the 200 meters high arch dam, which requires more experience in the damming technique, construction crafts and mechanization

    目前,碾壓混凝土壩的規模和高度在日益擴大, 300m級的碾壓混凝土重力壩和200m級的碾壓混凝土壩的研究方興未艾,對碾壓混凝土築壩技術、施工工藝和機械化程度的要求也更高。
  20. Normal crown nc

    常路
分享友人