每年成本等值 的英文怎麼說

中文拼音 [měiniánchéngběnděngzhí]
每年成本等值 英文
equivalent annual cost
  • : Ⅰ代詞(指全體中的任何一個或一組) every; each; per Ⅱ副詞(表示反復的動作中的任何一次或一組) often; every Ⅲ名詞(姓氏) a surname
  • : Ⅰ名詞1 (時間單位) year 2 (元旦或春節) new year 3 (歲數; 年紀) age 4 (一生中按年齡劃分的階...
  • : Ⅰ動詞1 (完成; 成功) accomplish; succeed 2 (成為; 變為) become; turn into 3 (成全) help comp...
  • : i 名詞1 (草木的莖或根)stem or root of plants 2 (事物的根源)foundation; origin; basis 3 (本錢...
  • : Ⅰ量詞1 (等級) class; grade; rank 2 (種; 類) kind; sort; type Ⅱ形容詞(程度或數量上相同) equa...
  • 等值 : equivalent; equivalence
  1. Shanghai xinli battery manufacture co., ltd. to establish in 1994 lately, the precursor is shanghai xinli battery factory lately, the company takes making the alkaline battery alkaline as to predominate the product, various specification, species is basic to cover all serieses of the dry battery, and accept various combination battery of the not standard type of design, to satisfy customer " s demand. xinli battery company lately to have already passed iso - 14000 environment system attestations of iso - 9001 : 2000 international quantity system attestation, the product quantity passes the battery examination center examination of the national light industry bureau and the sgs measurement of the eu ros serieses, the product is qualified. company annually with pass to increase continuously, the extension exports outward and the superior economic specific value service of the underneath brand peony, hongdan, fengdian. etc

    上海新立電池製造有限公司立於1994,前身是上海新立電池廠,公司以製造堿性電池alkaline為主導產品,各種規格品種基涵蓋干電池的所有系列,並承接設計非標準型的各種組合電池,以滿足客戶的需要。新立公司已通過iso 9001 - 2000國際質量體系認證和iso 14000環境體系認證,產品質量通過國家輕工業局電池檢測中心檢測以及歐盟ros系列的sgs測定,產品合格。公司以不斷遞增擴大對外出口和旗下品牌牡丹紅丹豐電的最優經濟比服務于廣大國內外客戶,並得到用戶的歡迎。
  2. Because of the complexity of calculation result data, and in order to simplify the analysis of results, this paper only provides annual temperature isoline map of february, may, august and november during construction, temperature isoline map of the first, fifth, tenth, twentieth and thirtieth year during operation, duration curve of temperature and stress of typical point at different elevation, the maximal stress distribution along dam height, point at different elevation, the maximal stress distribution along dam height, and the maximal and minimal temperature and the maximal tensive stress and its position of every month

    因計算結果數據量非常大,為便於果分析,文僅給出施工期2 、 5 、 8 、 11月份和運行期第1 、 5 、 10 、 20 、 30的溫度線圖,壩體不同高程典型點溫度和應力歷時曲線圖,最大應力沿壩高分布圖,逐月最高、最低溫度和最大拉應力及相應的位置
分享友人