水壓計 的英文怎麼說

中文拼音 [shuǐ]
水壓計 英文
hydraulic gage
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : 壓構詞成分。
  • : Ⅰ動詞1 (計算) count; compute; calculate; number 2 (設想; 打算) plan; plot Ⅱ名詞1 (測量或計算...
  • 水壓 : water gage; hydraulic pressure (用英寸高度表示的)水壓泵 hydraulic pump; 水壓鍛造 hydraulic forg...
  1. Based on the modern design theory of tunnels construction that the adjoining rock be regarded as primary load - bearing structure, this thesis have made researches on the stability of tunnels mother rock and the safety of support pattern under the high external waterpressure and high geostress

    這就使本隧洞工程的建設面臨著極大的挑戰。本文是在將圍巖作為主要承載結構,支護與圍巖共同作用的現代隧洞設理論的基礎上,來研究高外力及高地應力下隧洞圍巖穩定性及支護結構安全的。
  2. In addition, this paper carry out successfully the support design practice in the preceding excavation of 4km long exploratory tunnel. according to the thesis research results, the following conclusion can be drawn. if the grouting rock can possess sound anti - seepage capability and the liner structure can hold higher hydraulic permeability relatively, and if the adjoining rock can be made as primary load - bearing structure by construction measure, the stability of country rock and the safety of liner structure will be guaranteed

    算結果表明,如果能使錦屏工程引隧洞灌漿圈圍巖具有較好的防滲性能,將高外力控制在灌漿圈以外,再配合透性相對較好的支護結構以及排措施,使灌漿圈圍巖成為主要承載結構,並使襯砌結構和灌漿圈共同承載,是可以保證圍巖的穩定和支護結構安全的。
  3. Because of the technical complexity of the turbine for the three gorges project and on the basis of several important technical problems which have been defined in the international bidding documents for 14 generating units in the left bank power station, the owner of the project has decided another some important technical problems based on appraisal and comparison in the bid appraisal stage after the bidding documents are analyzed and the tender documents are cleared by the tenderers

    由於三峽工程輪機技術上的復雜性和挑戰性,在左岸電站14臺機組國際招標文件已明確了若干重大技術問題的基礎上,在機組議評標階段,對招標文件進行分析和投標商對投標文件進行澄清說明后,經評議比選,業主又決策了幾個重大技術問題,主要有:輪機設頭的確定,負傾角葉片輪機的應用,兩套力設,舍棄初期轉輪,蝸殼進行試驗等。
  4. The paper can concern the soil ' s instantaneous fallout, soil ' s main settlement due to concretion, and the coactions of soil and pile by applying the contact surface to simulate the coactions. the paper can analyze the service behavior of reuniting foundation and the effect of the pile ' s intensity, length and distance. the paper is concerned with the stressing of pile and the arrangement of pile for the smaller cost to fit the subsidence of throughway

    通過有限元算,分析了復合地基樁土工作性狀,分析了樁的剛度,長度,樁距對地基沉降及超孔隙力的影響,並根據復合地基中樁的受力特點,提出合理的樁的布置方式,在滿足高速公路路面沉降要求的前提下,節省工程投資,加快建設進度。
  5. The additional flow is formed by the device of dentoid baffle, and the application of the device of dentoid baffle cooperated with a stilling basin has been investigated by systematic model tests. based on the research results, the hydraulic problems such as the characteristics of hydrodynamic pressure and cavitation on the head of the denotid baffle, the properties of flow under the condition that the device of denotid baffle is used with a stilling basin, the hydraulic computation about a stilling basin, the estimation of energy dissipation and its various affection factors, the mechanism and effect of energy dissipation, and distributions of velocity and pressure and aerating concentration, etc, have been analyzed ; the method and step of hydraulic design of device of denotid baffle by which the additional flow is produced has also been proposed

    文中利用齒墩設施實現附加射流,對齒墩設施與消力池聯合應用進行了大量的和系統的模型試驗,分析研究了中低佛勞德數條件下,齒墩墩頭的動強及空化特性,齒墩設施與消力池聯合應用時的流態特性,消力池的算,消能量的估算及其各種影響因素,消能機理和效果,消力池內的流速、強特性,摻氣濃度分佈等力學問題,並提出了實現附加射流齒墩設施的力設方法和步驟。
  6. Code for design of sewage sludge dewatering with belt filter press

    帶式濾機污污泥脫規范
  7. Secondly, detailedly analyzing reasons inducing these problems, author finds it is that not thinking of the slope of pipeline and the friction in the process of producing water hammer pressure functions, but, thinking of the effect of the slope of pipeline in the process of producing the consequent water hammer calculative continuity function, which results in the inconsequent illogicality in the whole process of producing

    接著,對這些問題存在的原因進行了詳細分析,發現在當前推導強公式的過程中沒有考慮管道的傾斜度和摩擦阻力的影響,而在後面算的連續性方程的推導過程中則考慮了管道的傾斜度,這就導致了在當前連續性方程的整個推導過程中前後矛盾的不合理現象。
  8. The optimization system of water supply networks is very complicated. it deals with lots of factors from the process of networks " modeling, node demand calculation, initial flow distribution, and the optimal design to the drawing of pipe networks and isopiestic line. the total effect will be better if amelioration is imposed on each part of these processes

    管網優化系統是一個比較復雜的系統,從管網的建模、節點流量的算、初始流量的分配、優化算到管網圖形和等線的繪制,涉及的因素很多,任何一部分的改進與完善都有利於整體優化效果的提高。
  9. With the research object of overbank soft clay near the yiluo river, by means of pack drain to accelerate the consolidation of the soft ground and analysis of fourteen selected representative observation section, in the same time with the help of such testing apparatus as settlement plates, deflection inclinometer, piezometer, telescoping tube, my study not only evaluate the effect of pack drain ' s quickening up the consolidation of soft ground impersonalily and scientifically but also sum up the settlement disciplination of overbank soft clay after more than one years ? observation of settlement and stability continuously

    本文以伊洛河河灘相軟土為研究對象,利用沉降板、測斜管、孔隙、分層沉降標等多種測試儀器,選取14個有代表性的觀測斷面,進行了一年多的沉降與穩定觀測。通過對觀測數據的分析,進而對袋裝砂井加速河灘相軟土固結效果進行了客觀、科學的評價,同時推算了沉降系數m _ s和固結度參數,並對河灘相軟土的沉降規律進行了分析。
  10. Soil quality. determination of pore water pressure. tensiometer method

    土質.孔隙的測定.拉力
  11. The waterpower calculation table exploitation and its application about low pressure branch gas pipelines

    枝狀燃氣管道算表的開發及應用
  12. Such as mercury which may be contained in thermometers or blood pressure gauges, acids, alkalis and wet cell batteries

    ,比如銀包括儲存在體溫或是血內的,酸,堿以及液態的電池
  13. In this thesis hydraulic experimental studies and theoretical analyses on the vortex - flow drop shaft were conduced and the following results were accomplished : ( 1 ) in the model test some hydraulic characteristics including the shape of air core in the center of the drop shaft, the radial distribution of water flow velocity and the distribution of pressure on the wall of the drop shaft were measured under the condition of high water head above 250m and large discharge above 1400m3 / s. ( 2 ) a kind of computational method for the spiral water flow in the air core region of drop shaft was discussed and applied and the results agree the experimental data well. ( 3 ) the total ratio of energy dissipation in the drop shaft can reach 90 % and the energy dissipation in every region was discussed quantitatively

    本文通過試驗研究與理論分析對旋流式豎井泄洪洞應用於高頭、大泄流量情況時存在的一些力學問題進行了研究和探討,取得以下主要成果:一、結合小灣工程導流洞改建,對高頭( 252m ) 、大泄流量( 1400m ~ 3 s )條件下旋流式豎井中的流運動特徵進行了比較全面的測量,包括空腔形態、徑向流速分佈及井壁強等;二、提出了豎井空腔段螺旋算方法,其算結果與實測值吻合良好;三、利用試驗與算結果,對旋流式豎井的消能機理進行了探討,對豎井各部分的消能能力有了總體認識;四、對豎井下部消力井的合理井深進行了優化試驗研究,發現消力井合理深度為0 . 9d左右;五、通過試驗研究,歸納出豎井流總摻氣量估算方法,為導流洞排氣方案的設提供了參考依據;六、在高頭、大流量條件下,豎井空腔段下部流速很高,盡管流螺旋運動引起的離心力可以確保井壁強保持正,但空化數依然較低,因此豎井的空化空蝕始終是工程界關注的重大問題。
  14. This paper establishes a model simulating dam actual placing process and considering the non - continuity of initial temperature on the boundary of new and old concrete, daily air temperature change, concrete - placing temperature, hydration heat, heat insulation on boundary, water - storing process, placing intermission and curing with water. the calculation of stress field considers the concrete weight, static water pressure, thermal stress, different autogenous volume change between rcc and normal concrete, change of elastic modulus of concrete with age and creep action

    考慮了乞今最為全面的初始條件和邊界條件,包括模擬壩體的實際升程過程,考慮了新老混凝土接觸面上的初始溫度不連續,逐日的氣溫變化,混凝土的入倉溫度,化熱溫升,邊界保溫,庫蓄過程,澆築間歇以及灑養生等因素;應力場的算考慮了混凝土的自重,靜力,溫度應力,常態混凝土與碾混凝土不同的自生體積變形,混凝土的彈性模量隨齡期的變化以及徐變的作用。
  15. As one of the four important parts of water hydraulic axial piston pump, the design of sliding shoes friction matching mainly takes hydrostatic bearing

    作為軸向柱塞泵的四個關鍵組件之一,滑靴摩擦副的設主要採用靜支承的方法。
  16. Borrowing ideas from design theory and structure type of oil hydraulic proportional throttle valve and taking domestic and overseas correlative development as reference, this paper determines working conditions of the valve, designs its structure, selects suitable materials of its components, and performs corresponding intensity and temperature check

    在借鑒油比例節流閥的設理論、結構型式以及參考國內外相關研究成果的基礎上,確定了比例節流閥的工作條件,設比例節流閥的結構型式,選取了合適的元件材料,並進行了相應的強度和溫升校核。
  17. Obtain these chief research achievements. ( 1 ) the method of hydraulic fracturing, kaiser effect experiment and the finite element numerical simulation computation results, the direction of maximum horizontal principal stress intersect the small - angle of tunnel axial line, it is favorable to the stability of tunnel peripheral rock ; according to the test rust of field stress - relief method, at the present time, zhe gu mount tunnel have n ' t access to high crustal stress site, maximum principal stress magnitude is 17mpa ~ 20mpa

    主要獲得以下研究成果: ( 1 )綜合致裂法、室內巖石kaiser效應試驗和有限元數值模擬算研究成果,最大平主應力方向與隧道洞軸線小角度相交,對隧道圍巖穩定性有利;根據現場應力解除法測試結果,目前鷓鴣山隧道尚未進入高地應力段,最大主應力量級為17mpa 20mpa 。
  18. The principle, the characteristics, the structure design and the supporting performance of sliding shoes hydrostatic bearing of water hydraulic pump are analyzed and investigated in this thesis

    本文對滑靴靜支承的原理、特點、結構設和支承性能進行分析和討論。
  19. The authors and their research team design a sat of bran - new hydro jacking test equipment and suited software on the basis of their hydro - fracture research

    摘要在致裂法地應力測試研究的基礎上,結合工程實際情況設出一套全新的劈裂測試系統設備和相匹配的測試軟體。
  20. ( 2 ) when tunnel water is blocked up fully behind the lining, water pressure on the lining will reach maximum at last so long as surrounding rock near the lining is infiltrative no mattter how much the permeability coefficient of surrounding rock is

    ( 2 )隧道採用完全不排措施時,只要襯砌附近的圍巖滲,襯砌背後與含圍巖有力聯系,不論滲透系數多大,襯砌背後最終會達到靜算時不宜折減。
分享友人