水躍消能 的英文怎麼說

中文拼音 [shuǐyuèxiāonéng]
水躍消能 英文
energy dissipation by hydraulic jump
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : 動詞(跳) leap; jump
  • : 動詞1 (消失) disappear; vanish 2 (使消失; 消除) eliminate; dispel; remove 3 (度過; 消遣) pa...
  • : 能名詞(姓氏) a surname
  1. Using the model experiment data, the authors calculate the decreased percentage of water jump length, unit width hydraulic jump volume and the water depth downstream of the jump ; and also calculate the energy dissipation rate of dentoid baffle, it is concluded that the device of dentoid baffle can increase the energy dissipation rate of hydraulic jump theory and decrease the engineering cost

    計算了新增齒墩設施的量,同時計算了新增齒墩設施的深、長度和單寬容積減少的百分數。結果表明,採用齒墩設施,可增進作用,並取得顯著的經濟效益,達到附加射流理論所預期的效果。
  2. The water current flows over the top of the dentoid baffle to the hydraulic jump as additional momentum. while it is cooperated with a stilling basin, the flowing condition emerged in the basin may be improved greatly and the length and downstream water depth required by the basin can be decreased to a great extent. such an appliance may be also used to solve the problems of insufficiently dissipating water flow energy and aerating flow, which are often faced with those hydraulic engineering constraction as acted by high waterhead, great specific discharge and low froude number

    本文通過齒墩頂部的擴散舌所形成的附加射流,從上部射入,即可改善力池內的流流態,又可降低第二共軛深,減小長度,增進水躍消能效果,同時還解決大單寬、低佛勞德數條件下摻氣和不足的問題,試驗證實它是一種安全、經濟的工。
  3. What ' s more, we put forward some experienced formulas on the basis of the cortical analysis. the result of the research show that by installing diffluent piers with low ridge, we can eliminate the root of oscillatiny water jump, perfect the energy dissipation effect of water jump, also, we can improve the flow condition of down - stream. the fact that the main flow of down - stream is in the middle, not only effectively lower the speed of the bottom flow in the ridge rear, alleviate the erosion to the river bed, but also avoid the heavy wave resulted from the main flow in the surface, thus improve the surface wave of down - stream obviously. we can work out the body style parameters of diffluent piers with low ridge according to the project flow condition and experience formulas, and then reckon the down - stream surface wave condition for the protected building of the down - stream bank

    研究結果表明:設置低坎分流墩后,除了擺動舌擺動的根源,提高了效果,改善了下游流流態。下游體的主流在中部,既有效的降低了坎后流底流速,減輕流對河床的沖刷,又避免了主流位於表面導致波浪過大的結果,下游的面波浪明顯得到削減。依據經驗公式,可根據工程流條件設計出低坎分流墩的體型參數,進而估算出下游沿程的面波浪,為下游岸邊的砌護提供依據。
  4. It is concl uded that dental baffle - pier can increase energy dissipation rate of stilling b a sin and decrease engineering cost. the obvious economic benefits and the expected effect of additional momentum hydraulic jump theory are achieved

    結果表明:採用齒墩設施,可增進力池的作用,並取得顯著的經濟效益,達到了附加動量理論所預期的效果。
  5. Completely improve the water - retaining function of eye cells, instantly repair dry and ageing skin, effectively regenerate ageing cells, promote lymph circulation, eliminate toxin, activate skin tissue, firm skin, relieve eye fatigue and keep skin clear, tender, remove fine lines and make eyes bright and charming

    全面促進眼部細胞的鎖力,迅速滋潤修護缺、衰老皮膚;有效修復老化細胞,促進淋巴循環,排除眼部聚積的毒素,活眼部肌膚組織的緊密度與時刻充滿彈性,減輕眼部疲勞,維持皮膚透明細致,除眼部細紋,使您的雙眼閃亮迷人。
  6. A summary aboutthe direction to research the low fr current energy dissipator

    水躍消能工的研究
  7. Uning the experimental data, the dec r eased percentages of conjugate depth, length of hydraulic jump or unit width hydr a ulic jump volume with the increased dissipated energy facilities are calculated

    並通過模型試驗驗證了的理論分析,計算了新增設施的量、深、長度或單寬容積減少的百分數。
  8. However, because of the particularity that is hydraulic jump, before jumping, when water ' s froude number is less than four point five, the damping ratio is so low that energy dissipator ' s lower river produce serious flushing, so much so that it may threaten energy dissipation structure ' s safty

    然而,因為本身又具有其特殊性,在流佛汝德數( froudenumber )小於4 . 5時,率很低,致使工下游產生嚴重的沖刷,甚至危及建築物本身的安全。
  9. The economic benefits of new additional energy dissipation facilities are estimated in terms of the decreased percentage of the sequent depth of hydraulic jump and length of jump, or the capacity of hydraulic jump under the unit width. the additional flow hydraulic jump theory has been demonstrated by model tests

    文中用新增齒墩設施的深、長度和單寬容積減少的百分數,估計新增設施的經濟效益,並通過模型試驗驗證了附加射流水躍消能的理論分析。
  10. ( 2 ) validate whether the crest elevation can meet the require of energy dissipation and erosion prevention during the beginning period of flood discharge. ( 3 ) calculate the altitude of downriver cofferdam, and make it meet the require of energy dissipation and erosion prevention. ( 4 ) calculate some average velocity of flow through some sections, including contracted section in stilling basins behind upriver cofferdam, if the hydraulic jump happen in lower reaches of the river. the program will calculate the average velocity of flow of contracted section and the length of the apron

    主要設計內容包括:計算上游圍堰后力池的尺寸;驗證泄洪初期壩面高程是否夠滿足防沖需要;計算下游圍堰堰頂高程,使其滿足泄洪期圍堰和壩體過流的防沖和工程進度的需要;計算部分斷面平均流速,包括:上游圍堰后力池中收縮斷面的斷面平均流速;壩首和壩末的斷面平均流速;當下遊河道發生時,計算下遊河道的收縮斷面平均流速及需要鋪設護坦的長度。
  11. It makes the t type barrier and continuous end sill connected. by this method, it can produce forced jump dissipation of energy. as a result, it decreases the length of the stilling basin and lows the cost

    T形墩力池是在平底力池內,設置t形墩與連續尾坎相連接,藉以產生強迫進行,從而減小力池的長度,降低造價。
分享友人