水電室 的英文怎麼說

中文拼音 [shuǐdiànshì]
水電室 英文
pump &electricians
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ名詞1 (有電荷存在和電荷變化的現象) electricity 2 (電報) telegram; cable Ⅱ動詞1 (觸電) give...
  • 水電 : hydroelectricity; hydropower; water and electricity
  1. Stability analysis on adjoining rock of large - scale underground chamber group of suofengying hydropower station

    索風營站大型地下洞群圍巖穩定分析
  2. Design of surge chamber in mianhuatan hydropower station

    棉花灘站調壓設計
  3. Type selection of tailrace surge chamber of longtan hydropower station

    龍灘站尾調壓形式選擇
  4. Optimization design of tailrace surge chamber concrete lining layers for dachaoshan hydropower station

    大朝山站尾調壓混凝土襯砌分層優化設計
  5. Design of drainage system for tailrace surge chamber and use of high strength pervious hose at ertan hydropower station

    二灘站尾調壓系統設計及高強透軟管的應用
  6. The tailrace surge chamber shared by two units, common in hydropower stations with diversion systems, has problems of water level fluctuation and hydraulic disturbance

    摘要雙機共尾調壓站引系統中一種常見的布置形式,存在尾調壓位波動和力干擾問題。
  7. Share the content of the area to include : path of elevator well, conduit well, stair well, rubbish, change between electric room, equipment, communal hallway, corridor, basement, be on duty gatehouse, and what serve for whole is communal the floor area that uses a room with room and management, with the level umbriferous area is calculated

    共有面積的內容包括:梯井、管道井、樓梯間、垃圾道、變、設備間、公共門廳、過道、地下、值班警衛等,以及為整幢服務的公共用房和治理用房的建築面積,以平投影面積計算。
  8. In accordance with the testing results and the analysis concerned, it is considered that the seismic wave method, borehole acoustic method and indoor rock mechanics test are feasible to evaluate the engineering quality of the foundation rock for the toe slab of the dam comprehensively, and the results can lay a reliable foundation for the accepting the foundation rock for the toe slab of the dam

    根據檢測結果與分析,認為採用地震波法、鉆孔聲波法以及內巖石力學試驗綜合評價站大壩趾板建基巖體工程質量是可行的,其成果可為大壩趾板建基巖體驗收提供依據。
  9. Based on seismic wave method, borehole acoustic method and indoor rock mechanics test, the dynamic and static parameters of the foundation rock for the toe slab of the concrete face rockfill dam for shuibuya hydropower station are tested, and then the relationship among the rock quality, dynamic parameter and static parameter are established with the parameters obtained from the test, furthermore, the classification and the quality evaluation are made as well

    摘要採用地震波法、鉆孔聲波法以及內巖石力學試驗法,對布埡站面板壩趾板建基巖體進行了動、靜參數測試,並根據所獲的參數建立了巖體質量、巖體動力學和靜力學參數三者之間的相關關系,對工程巖體進行了質量分級和質量評價。
  10. Relating closely to the main problem of the high sidewall and wide span underground cavities excavation stability of xiluodu hydroelectric project, the evolution characters of geo - stress field in deep - cutting gorge and the whole features of the stress field, strain field and plastic failure zone around the underground chambers after excavation are studied systematically in the dissertation, based on a great deal of data gathered in field investigation and taking the flac3d v2. 0 software as basic computation tools. meanwhile, in the course of research, the new methods of dynamic numerical simulation are summarized and applied. furthermore, the effects of rock mass qualities, initial geo - stress field and excavation procedure on surrounding rock mass stability are discussed

    本文緊密結合溪洛渡工程大跨度、高邊墻復雜地下廠房洞群,施工開挖過程中和開挖后圍巖穩定性研究這一重大課題,在詳盡的野外地質調查工作和對大量基礎地質資料的整理與分析基礎上,以目前國際工程地質界公認的最新通用軟體flac ~ ( 3d ) 2 . 0版作為基本計算工具,從整個壩區地應力場的研究開始,通過動態數值模擬分析這一新的模擬思路,系統地研究了深切峽谷區地應力場多階段的特徵和演變規律,進而對左、右岸地下廠房洞群開挖全過程中圍巖應力場、變形場和塑性破壞區的變化特徵,進行了全過程動態數值模擬研究,並詳細討論了圍巖質量、初始地應力場、施工開挖順序對大型地下洞群圍巖穩定性的影響。
  11. The main tests and researches are as following : to study the ac flashover characteristic of composite insulator in different icing states by imitating tests in multifunctional artificial climate chamber, and analyze the effect of ice amount and icing water conductivity on flashover voltage, put forward a flashover mechanism by analyzing the icing flashover process. to study the ac flashover characteristic of composite insulator in different altitude and icing states together by imitating tests in multifunctional artificial climate chamber, and mainly analyze the effect of altitude ( air pressure ) and ice amount on flashover voltage, and investigate the flashover mechanism. to investigate the effect of high altitude and icing on the hydrophobicity of composite insulators

    本文主要進行了以下試驗研究: 1 )在多功能人工氣候里模擬不同覆冰程度下合成絕緣子的交流閃絡特性,主要分析覆冰量和覆冰導率對閃絡壓的影響,並對其覆冰閃絡過程進行機理分析; 2 )在多功能人工氣候里模擬不同海拔高度和覆冰程度綜合作用下合成絕緣子的交流閃絡特性,主要分析海拔高度(即氣壓)和覆冰量對閃絡壓的影響,並進行閃絡機理分析; 3 )研究高海拔和覆冰對合成絕緣子憎性的影響。
  12. With the further economic growth and the implement of development of the western regions, hydroelectric construction in our country is undergoing rapid growth, anumber of high - dam power - station is in building or in programming. in view of its higher - head and larger magnitude of spill structure outlet, it is difficult for conventional concrete or reinforced concrete structure of pier and pier room to support its vast water pressure. coupled with the improvement of prestressed method, it has been the noteworthy tool in solving the problem

    隨著我國經濟的加速發展及西部大開發戰略的實施,我國事業也迎來了迅猛發展的大好時機,一批高壩站正在建設或規劃之中,其泄建築物孔口及頭愈來愈大,常規混凝土或鋼筋混凝土閘閘墩結構難以承受如此之大的推力作用,隨著預應力技術的成熟,這一技術已成為解決該問題的關鍵技術措施之一。
  13. Reliability assessment of xi - luo - du underground water - power plant : the results have been used by the cheng - du surveying, design and research institute for the preliminary design ; ( 2 ) the stress and strain analysis for the xiao - guan - zi sluice and its foundation : the report has been applied for the reinforcement of the foundation ; ( 3 ) the thermal control procedure for the no. 7 - 14 power plant dam segments of the three gorge project : the research report provides the effective and efficient methods for the controlling of the temperature field in the mass concrete structure ; ( 4 ) the software system development for the long - term monitoring for dikes : the software can automatically give the results of the seepage field and the probability of soil piping of dikes and underground ; ( 5 ) reliability assessment of xiang - jia - ba underground water - power plant : the results have been used by the zhong - nan surveying, design and research institute for the preliminary design ; ( 6 ) fatigue reliability estimation of shipping berthing pillar : the results give the optimized design scheme and prediction of the structural age ; ( 7 ) 3 - d static and dynamic stochastic finite element analysis for the strength, stability and thermal control problem for xi - luo - du project

    溪洛渡站超大型地下洞群圍巖穩定的安全可靠性分析:被成都勘測設計研究院應用於比選報告及可行性論證中; ( 2 )小關子站攔河閘壩及地基的應力應變分析:被成都勘測設計研究院應用於地基加固處理方案; ( 3 )三峽廠房7 # - 14 #壩段溫控並縫措施研究:為廠房壩段並縫方案的可行性提供了依據; ( 4 )堤防工程體系的長期監控預報預警決策系統開發:為監控、預測預報堤防滲漏管涌破壞提供分析軟體; ( 5 )向家壩地下洞群圍巖穩定的安全可靠性分析:被中南勘測設計研究院應用於初步設計方案中; ( 6 )靠船墩的疲勞可靠度研究:為廣東航運規劃設計院的靠船墩優化設計和加固提供依據; ( 7 )溪洛渡高拱壩壩體壩基(壩肩)強度和穩定的三維靜動力隨機有限元分析及可靠度計算:為溪洛渡重大工程壩體的靜動力安全穩定性及溫控方案提供依據。
  14. Party b shall pay fee for water, electricity, telephone, internet and other day - to - day costs occurred in its office in the factory center and take liabilities for deferred payment

    乙方應按時繳納乙方工廠中心辦公內的話、網路等各項日常費用,承擔延期付款的違約責任。
  15. The jiangkou hydropower station adopt double curve dam and underground powerhouse. major structures for the underground powerhouse were built under the ground, the whole cavern mass are quite complicate

    站採用雙曲拱壩、地下廠房設計方案,廠房埋深約120m ,站的主要建築物均修建於地下,整個地下洞群錯綜復雜。
  16. Combined with hydrogeological information gained by exploration and hydrographical drilling, groundwater types and leakage ways under the water curtain corridor and air - cushioned surge chamber are found out, which provide the grouting engineering with more effective treatment

    結合工程勘查及文地質鉆探獲取得的地下文地質信息,查明了幕廊道和氣墊調壓的地下類型和滲漏途徑,為調壓的進一步灌漿處理提供了依據。
  17. Finally, some suggestions were made for stochastic analysis of waterhammer and surges at hydropower stations

    針對研究現狀,提出了擊與調壓涌浪隨機分析的3點建議。
  18. The hydropower station has occupied the very important position in improving chinese energy sources construction, and with the increase of the size of the hydropower plant, its ventilation and air conditioning systems will be more complex

    站地下洞群在通風時,是一個由交通洞、廠房、母線洞、主變洞、出線道、進風洞、排風洞等洞以及各專門布設的送排風管道系統組成的通風系統。
  19. Application of hydrochemistry components analysis to the leakage ways research of air - cushioned surge chamber in hydro - electric power station

    化學分析方法在站調壓途徑調查中的應用
  20. Future facade ltd. - services include design, interior design, design and build ( for apartments, retail, office ), facade consulting and engineering for external facade work for skyscrapers

    柏藝內設計裝修工程-提供內、外等裝修設計、、泥工程等服務,舞臺布景設計及搭建、維修工程等。
分享友人