河道水文站 的英文怎麼說

中文拼音 [dàoshuǐwénzhàn]
河道水文站 英文
river station
  • : 1 (天然的和人工的大水道) river 2 (指銀河系) the milky way system; the galaxy 3 (特指黃河) t...
  • : Ⅰ名詞(道路) road; way; route; path 2 (水流通過的途徑) channel; course 3 (方向; 方法; 道理) ...
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ名詞1 (字) character; script; writing 2 (文字) language 3 (文章) literary composition; wri...
  • : Ⅰ動詞1 (站立) stand; be on one s feet 2 (停下來; 停留) stop; halt; pause Ⅱ名詞1 (停車點) st...
  • 河道 : river course; streamway; covalency; runway; cut; river channel河道變遷 channel change; migration ...
  • 水文 : hydrology水文測驗 hydrologic survey; 水文成因分析 hydrologicall genetic analysis; 水文地理學 hydr...
  1. By using the yearly data of water - sand that is gotten by a couple of adjacent hydrologic station in yellow river lower reaches, this paper makes use of kinds of math methods looking for the nonlinear disturbance among all of the factors, and introduces the thinking of analysis, logic, conclusion, inference, and random to nonlinear hydrologic forecasting. it realizes the valid approximation of the water level process in erodible - bed channel

    選擇黃下游兩對相鄰多年沙資料,藉助多種數學方法尋找其中的非線性擾動項,將隨機數學中分析、邏輯、歸納、演繹、隨機的思考問題方式引入到非線性預報中,實現沖淤相應位過程的有效擬合。
  2. The formula of calculating flood peak at downstream stations according to upstream flood peak at hydrometer station was proposed in this research. in the formula river boundary and flood type factors etc. were main factors and the formula can reflect the impacting factors of flood deformation

    報告給出了由上游洪峰流量計算下游洪峰流量的計算公式,公式包含有條件和洪峰峰型因子,較全面地反映了影響洪變形的因素。
  3. Abstract : variation of flow condition caused by the multi - pur pose regulation schemes has been investigated on the basis of measured date in r iver model. flood - control of the upper river, operation of the power - station, saf ety of the bridge and power - station, navigation and evolution of the river are a nalyzed. a reasonable and feasible project alternative and the improvement measur ement are proposed

    摘:涪江潼南段防洪整治是一項以防洪為主體的綜合性岸整治工程,在平面二維數值模擬計算的基礎上再進行工模型試驗,比較分析各防洪整治方案下潼南流條件的變化,及其對上游防洪、、大橋、電、航運、勢的影響,提出合理可行的工程方案
  4. Daoguanhe rerservoir is a typical hill type reservoir in wuhan, china. its area for fish culture is commonly 467ha. periphytic algae and periphytic protozoan including species, the content of chl. a and primary productivity et al, were studied from april 2000 to january 2001

    從2000年4月至2001年元月按每季度采樣一次,對庫按上游、中游、下游設置的三個采樣作了周叢藻類、周叢原生動物的群落結構和漁產潛力的研究,結果表明: 1
  5. In this paper according to the design scheme of yao heba power station in nan yahe river, the mathematical model with longer and complicated conduit system, elastic water hammer and pid regulating low of voter turbine adjusting system in the case of the small fluctuation has being built, which include conduit system, surge tank, draft tube, water turbine, generator and governor. the hydraulic losses are taken into account, and nonlinearization in water turbine and the governor is also taken into account

    根據南椏的設計方案,對輪機調節系統,按長引復雜引系統、彈性擊、調速器為pid調節規律,在小波動情況下,對包括引、調壓井、尾管、輪機、發電機、調速器在內的輪機調節系統建立數學模型,並計及引力摩阻損失,對輪機、調速器考慮了其中的非線性,利用功能強大的matlab軟體編制了源程序進行計算機模擬計算。
  6. In addition, for its application in unattended substation, important traffic crosses, hydrological observation and the monitor of frontiers and coastal fronts and so on, remote video monitoring system plays a key role in motoring system

    另外,一些特殊的應用如無人值守變電、交通管理、監測、邊海防監控等,遠程視頻監控是監控系統不可缺少的最主要的功能。
  7. The width of main channel would influence the water level rising rate greatly in flood events. when the discharges in main channel increased to 8000 m ' / s from 3000 m3 / s the water rising amplitude at hydrometer stations in the lower yellow river was correlative well with the exponent ( - 0. 65 ) of main channel width and the exponent ( - 0. 33 ) of river longitudinal slope

    期主槽寬度對位漲率有較大影響,主槽流量從3000m ~ 3 s增大到8000m ~ 3 s時,下游各斷面位的抬升幅度與主槽寬度的( - 0 . 65 )次方和縱比降的( - 0 . 33 )次方具有較好的相關關系。
  8. Abstract : there are differents ways to maintain normal navigation in navigable channel during channel enclosure for building hydropower plant

    摘:如何使通航截流至船閘正式通航期間維持正常的航運,其做法不一。
  9. Based on analyzing discharge data in guide, xunhua, tongren hydrologic station and river course character, propagation time of different discharge in different river course is presented, and prediction period of interval flood, main stream flood during construction and operation period are acquired

    通過對貴德、循化、同仁流量資料以及特性的分析研究,得出不同流量在不同上的傳播時間,歸納出區間洪和幹流洪在施工期和運行期的預見期。
  10. It had a diameter of 54 inches. it also started from man kan to in the new territories, went through river indus pumping station to water tunnel at tai po tau to connect with plover cove

    1964年增設的第二條直徑54寸管,起自新界錦渡經梧桐至大埔頭輸,與船灣淡湖系統連接。
分享友人