河道水文站 的英文怎麼說
中文拼音 [hédàoshuǐwénzhàn]
河道水文站
英文
river station- 河 : 1 (天然的和人工的大水道) river 2 (指銀河系) the milky way system; the galaxy 3 (特指黃河) t...
- 道 : Ⅰ名詞(道路) road; way; route; path 2 (水流通過的途徑) channel; course 3 (方向; 方法; 道理) ...
- 水 : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
- 文 : Ⅰ名詞1 (字) character; script; writing 2 (文字) language 3 (文章) literary composition; wri...
- 站 : Ⅰ動詞1 (站立) stand; be on one s feet 2 (停下來; 停留) stop; halt; pause Ⅱ名詞1 (停車點) st...
- 河道 : river course; streamway; covalency; runway; cut; river channel河道變遷 channel change; migration ...
- 水文 : hydrology水文測驗 hydrologic survey; 水文成因分析 hydrologicall genetic analysis; 水文地理學 hydr...
-
By using the yearly data of water - sand that is gotten by a couple of adjacent hydrologic station in yellow river lower reaches, this paper makes use of kinds of math methods looking for the nonlinear disturbance among all of the factors, and introduces the thinking of analysis, logic, conclusion, inference, and random to nonlinear hydrologic forecasting. it realizes the valid approximation of the water level process in erodible - bed channel
本文選擇黃河下游兩對相鄰水文站多年水沙資料,藉助多種數學方法尋找其中的非線性擾動項,將隨機數學中分析、邏輯、歸納、演繹、隨機的思考問題方式引入到非線性水文預報中,實現沖淤河道相應水位過程的有效擬合。The formula of calculating flood peak at downstream stations according to upstream flood peak at hydrometer station was proposed in this research. in the formula river boundary and flood type factors etc. were main factors and the formula can reflect the impacting factors of flood deformation
報告給出了由上游水文站洪峰流量計算下游站洪峰流量的計算公式,公式包含有河道條件和洪峰峰型因子,較全面地反映了影響洪水變形的因素。Abstract : variation of flow condition caused by the multi - pur pose regulation schemes has been investigated on the basis of measured date in r iver model. flood - control of the upper river, operation of the power - station, saf ety of the bridge and power - station, navigation and evolution of the river are a nalyzed. a reasonable and feasible project alternative and the improvement measur ement are proposed
文摘:涪江潼南河段防洪整治是一項以防洪為主體的綜合性河岸整治工程,在平面二維數值模擬計算的基礎上再進行河工模型試驗,比較分析各防洪整治方案下潼南河段水流條件的變化,及其對上游防洪、河道、大橋、電站、航運、河勢的影響,提出合理可行的工程方案Daoguanhe rerservoir is a typical hill type reservoir in wuhan, china. its area for fish culture is commonly 467ha. periphytic algae and periphytic protozoan including species, the content of chl. a and primary productivity et al, were studied from april 2000 to january 2001
本文從2000年4月至2001年元月按每季度采樣一次,對道觀河水庫按上游、中游、下游設置的三個采樣站作了周叢藻類、周叢原生動物的群落結構和漁產潛力的研究,結果表明: 1In this paper according to the design scheme of yao heba power station in nan yahe river, the mathematical model with longer and complicated conduit system, elastic water hammer and pid regulating low of voter turbine adjusting system in the case of the small fluctuation has being built, which include conduit system, surge tank, draft tube, water turbine, generator and governor. the hydraulic losses are taken into account, and nonlinearization in water turbine and the governor is also taken into account
本文根據南椏河姚河壩水電站的設計方案,對水輪機調節系統,按長引水管道復雜引水系統、彈性水擊、調速器為pid調節規律,在小波動情況下,對包括引水道、調壓井、尾水管、水輪機、發電機、調速器在內的水輪機調節系統建立數學模型,並計及引水管道水力摩阻損失,對水輪機、調速器考慮了其中的非線性,利用功能強大的matlab軟體編制了源程序進行計算機模擬計算。In addition, for its application in unattended substation, important traffic crosses, hydrological observation and the monitor of frontiers and coastal fronts and so on, remote video monitoring system plays a key role in motoring system
另外,一些特殊的應用如無人值守變電站、交通管理、河道水文監測、邊海防監控等,遠程視頻監控是監控系統不可缺少的最主要的功能。The width of main channel would influence the water level rising rate greatly in flood events. when the discharges in main channel increased to 8000 m ' / s from 3000 m3 / s the water rising amplitude at hydrometer stations in the lower yellow river was correlative well with the exponent ( - 0. 65 ) of main channel width and the exponent ( - 0. 33 ) of river longitudinal slope
洪水期主槽寬度對水位漲率有較大影響,主槽流量從3000m ~ 3 s增大到8000m ~ 3 s時,下游各水文站斷面水位的抬升幅度與主槽寬度的( - 0 . 65 )次方和河道縱比降的( - 0 . 33 )次方具有較好的相關關系。Abstract : there are differents ways to maintain normal navigation in navigable channel during channel enclosure for building hydropower plant
文摘:如何使通航河道在水電站截流至船閘正式通航期間維持正常的航運,其做法不一。Based on analyzing discharge data in guide, xunhua, tongren hydrologic station and river course character, propagation time of different discharge in different river course is presented, and prediction period of interval flood, main stream flood during construction and operation period are acquired
通過對貴德、循化、同仁水文站流量資料以及河道特性的分析研究,得出不同流量在不同河道上的傳播時間,歸納出區間洪水和幹流洪水在施工期和運行期的預見期。It had a diameter of 54 inches. it also started from man kan to in the new territories, went through river indus pumping station to water tunnel at tai po tau to connect with plover cove
1964年增設的第二條直徑54寸水管,起自新界文錦渡經梧桐河抽水站至大埔頭輸水隧道,與船灣淡水湖系統連接。分享友人