泄底 的英文怎麼說

中文拼音 [xiède]
泄底 英文
reveal or expose what is at the bottom of sth
  • : Ⅰ動詞1 (液體、氣體排出) let out; discharge; release 2 (泄露) let out (a secret); leak (new...
  • : 底助詞(用在定語后, 表示定語和中心詞之間是領屬關系, 現在多寫作「的」)
  1. Disinfect bird cage and surfaces contaminated by bird droppings and secretions with detergent

    鳥籠及沾有禽鳥排物或分泌物的物件,要以洗潔劑徹消毒。
  2. Disinfect bird cage and surfaces contaminated by bird droppings with detergent ; seek medical treatment if symptoms develop

    要徹消毒沾有禽鳥排物的雀籠或物件;及
  3. Leak - off for double packing ( optional ). a lantern ring and leak - off pipe are provided for removal of leakage, if any, from lower packing set

    雙重包裝(備選)的破裂點。如果有,則用套環和破裂管來更換部包裝漏部分。
  4. Survival is key in the harsh lower depths of detroit, and for many the current emotional life preserver is hip hop

    特律的中下階級市民來說,他們每天都必須面對生存下去的殘酷現實,而他們發情緒最好的方法就是透過饒舌歌。
  5. My wife had scarcely patience to hear me to the end, but railed at the writer with unrestrained resentment.

    我的女人幾乎不耐煩聽我讀到,大罵寫信人,盡情憤。
  6. Bottom drain valve

    部放
  7. Abstract : according to analyzing equipment ' s vibration. the failure of screw pump was reaso ned. and the old packing seal was converted into the combination of oil seal, laby rinth and packing seal, in result, the leakage of the pump had been solved comp letely

    文摘:利用設備的振動分析對螺桿泵密封失效原因作診斷,並將原有的填料密封改造為橡膠油封、迷宮密封及填料密封的組合形式,徹解決了漏問題。
  8. Ship ' s bottom plugs and spanners

    螺塞
  9. A bad combusting condition had been occurring on the two boilers typed dg670 / 13. 7 - - in the huanggezhuang power plant for two years : 2003 - 2004. there were fourteen times boilers break without arrangement which has had a serious influence on the development of the company. in order to improve the combusting condition of their boilers and prevent the “ four - pipes ” from leaking, we made experiments and improvements on the combusting system of # 22 boiler

    黃桷莊電廠dg670 / 13 . 7 -型型微傾斜爐液態排渣爐近兩年鍋爐燃燒狀況不好, 2003年- 2004年兩臺爐「四管」漏非計劃停爐共14次,嚴重影響了電廠的經濟運行,使電廠的效益有較大的滑坡。
  10. Static analysis by three - dimensional finite element method for bottom intake of drainage and sediment flushing in baishi reservoir

    白石水庫水排沙孔三維有限元靜力分析
  11. Most people don ` t look dumb till they start talkin `

    大多數的人看起來不笨,但一開口就泄底了。
  12. Bottom hole layout of flood discharing and sediment flushing and application of silicon powder concrete in baishi reservoir

    白石水庫洪排沙孔布置及硅粉混凝土應用
  13. We researched fabrication at different asputtering and annealing atmosphere, the different process conduced different electrical properties. we can conclude a higher annealing temperature and higher proportion of o2 during reactive sputtering favors the improvement of electrical performances of hfo2 dielectrics ; 4. the analysis of i - v curves of these devices displays different leakage current mechanism under different area of applied bias - voltage ; as to silc. there are different leakage current mechanism at influence of sil. c ; 5

    研究表明,在優化工藝條件下制備的hfo _ 2介質層中,襯注入條件下由於其較低的體和界面缺陷密度,漏電流的輸運機制主要以schottky發射為主; silc效應導致hfoz / si界面缺陷態的增加,從而使得襯注入條件下,柵漏電流機制不僅有schottky發射還有f一p發射機制起主要作用; 5 )初步研究了氮化的hfo : ( hroxny )柵介質的電學特徵。
  14. Application of water damage and reinforcement for base plate of flood discharge trough in spillway of guanzhuang reservoir

    官莊水庫溢洪道板水毀原因分析與加固
  15. When xiaolangdi project completed and put into orperation, the inflow of water and sediment condition will be changed because of the regulation of the reservoir. especially the initial 14 years, the reservoir will hold up sediment and release clear water, which may affect the river sections in henan province, especially the wandering sections. it will result in changes of flow state and endangering the water works, because the longitudinal addend by scouring and lateral slope failure

    小浪水庫建成運用后,通過水庫的調水調沙,改變了黃河下游的來水來沙條件,尤其是運用的前14年處于攔沙期,下清水,對河南河道的影響最為劇烈,對游蕩性河段的河勢變化將產生很大影響,河道縱向沖刷下切,橫向灘岸坍塌,工程出險將大量增加。
  16. Seven body bosses provide purge, flush, drain or bypass connections. ( purge / flush shown. ) bottom boss is furnished with standard pipe threads

    七個閥體凸起部提供清洗,沖刷,排或旁路連接。 (圖示為清洗/沖刷) 。部凸起部配置標準管道螺紋。
  17. But there are still many practical problems, such as political interference, area protection, betray of base price, weakness of methods for review of tender and so on

    但在目前工程建設交易的實際操作中卻存在許多問題,如存在行政干預、地域保護現象嚴重、標容易露、評標方法薄弱等。
  18. At first, measuring the electron recoil spectra of target room gamma ray. through the resolution of spectra we get the gamma ray spectra caused by target room. then we transform it to the zero point, the place of neutron source, and calculate the leakage gamma ray spectra t from iron sphere caused by target room gamma ray by mcnp program

    靶室產生的射線本,通過實驗測量和模擬計算相結合的方法加以扣除,首先測量靶室產生的射線康普頓反沖電子譜,解譜得到靶室漏譜,將所解得的靶室漏譜歸一到原點,即中子源處,利用mcnp蒙卡程序輸運計算靶室射線穿透鐵球后所漏的能譜,最後從d ? t中子穿透鐵球伴生射線漏能譜s中扣除。
  19. The temperature difference should not be more than 2 degrees, and the difference in ph levels should not exceed 0. 5. the salinity difference should not be more than 2ppt

    物過量積聚會過度消耗溶氧產生亞硝酸物硫化氫及改變池生態,致使蝦生長緩慢及存活率低。
  20. Complicated hydrologic and geographic conditions, and the large scale of the xiaolangdi hydraulic project on the yellow river are introduced briefly. three desilting tunnels are designed to meet the requirements of flood control, sediment discharge and runoff regulation. according to the performance requirements of desilting tunnels, the tunnel lining down - stream of the grouting curtain is designed to be post - tensional prestressed lining. on the basis of investigation and research, experiements and analysis, the unbonded prestressing system is used. it is the largest unbonded prestressed tunnel lining project in the world, and the first one in china

    簡介黃河小浪水利樞紐復雜的水文、地質條件以及龐大的工程規模.該樞紐設計有3條排沙洞,擔負著洪、排沙、調節徑流和保證進水口不被泥沙淤堵的任務.根據排沙洞的水庫運用要求,灌漿帷幕下游排沙洞洞身段設計為混凝土后張預應力隧洞.通過大量的調研、試驗、分析論證,在施工前確定該預應力方案選用無粘結預應力系統,成為目前世界上規模最大的無粘結預應力隧洞襯砌工程,在國內尚屬首例
分享友人