洪水形態 的英文怎麼說

中文拼音 [hóngshuǐxíngtài]
洪水形態 英文
flood shape
  • : i 形容詞(大) big; vast; grand Ⅱ名詞1. (洪水) flood 2. (姓氏) a surname
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : 名詞1. (形狀; 狀態) form; condition; appearance 2. [物理學] (物質結構的狀態或階段) state 3. [語言學] (一種語法范疇) voice
  • 洪水 : waterflood; deluge; flood; flowage; torrent; spate; flood water; [義大利] acqua alta洪水泛濫 floo...
  1. Six foundation works : first, projects to prevent flood, avoiding huai river overflow again ; second, projects of comprehensive traffic, perfecting the highway, railway, waterway and aviating traffic network ; third, ecological environmental protection project to improve peoples living conditions and strengthen environmental ecological construction progressively ; fourth, construction of " digital fuyang ", realizing datamation of product design, automation of production process, and electronization of commercial market ; fifth, sincere project of fuyang, advancing all kinds of sincere institutional improvement of same trade, forming morals based on sincerity, and personal integrity ; sixth, talents market project, developing human resources diversely

    六項基礎工程:一是防保安工程,切實根除淮河心腹之患;二是綜合交通工程,完善公、鐵、、空綜合交通網路;三是生環保工程,改善人居生活條件,加強環境生建設;四是數字阜陽工程, .逐步實現產品設計數據化、生產過程自動化、營銷商務電子化;五是誠信阜陽工程,推進各類同業誠信制度建設,成誠信為本、操守為重的社會風尚;六是人才強市工程,多方位開發人力資源。
  2. The spatial condition and both the technical and economic feasibilities for the layout of the light - court for the auxiliary powerhouse under the condition of higher fluctuation of the flood level downstream is basically analyzed ; in which the principles of the layout and both the spatial dimension and configuration are discussed, and then a actual design case is given with the preliminary evaluation on the ventilating and lighting effect of the light - court

    初步分析了下游位變幅較大等環境條件下,貫流式電站副廠房設置自然通風採光天井的空間條件及其技術性和經濟性,討論了天井布置原則和空間尺度與處理,給出設計實例並初步評價了天井通風採光的效果。
  3. The enochian knowledge suggests these regular cataclysmic changes act as an evolutionary agent provocateur, to quicken the resident life forms to the next evolutionary phase prior to exodus from the womb planet

    伊諾克的知識讓人想去這些經常的大變化擔當了一進化的密探,加速居住生命到下一個領先從發源地行星離去的進化的階段。
  4. In this thesis hydraulic experimental studies and theoretical analyses on the vortex - flow drop shaft were conduced and the following results were accomplished : ( 1 ) in the model test some hydraulic characteristics including the shape of air core in the center of the drop shaft, the radial distribution of water flow velocity and the distribution of pressure on the wall of the drop shaft were measured under the condition of high water head above 250m and large discharge above 1400m3 / s. ( 2 ) a kind of computational method for the spiral water flow in the air core region of drop shaft was discussed and applied and the results agree the experimental data well. ( 3 ) the total ratio of energy dissipation in the drop shaft can reach 90 % and the energy dissipation in every region was discussed quantitatively

    本文通過試驗研究與理論分析對旋流式豎井泄洞應用於高頭、大泄流量情況時存在的一些力學問題進行了研究和探討,取得以下主要成果:一、結合小灣工程導流洞改建,對高頭( 252m ) 、大泄流量( 1400m ~ 3 s )條件下旋流式豎井中的流運動特徵進行了比較全面的測量,包括空腔、徑向流速分佈及井壁壓強等;二、提出了豎井空腔段螺旋力計算方法,其計算結果與實測值吻合良好;三、利用試驗與計算結果,對旋流式豎井的消能機理進行了探討,對豎井各部分的消能能力有了總體認識;四、對豎井下部消力井的合理井深進行了優化試驗研究,發現消力井合理深度為0 . 9d左右;五、通過試驗研究,歸納出豎井流總摻氣量估算方法,為導流洞排氣方案的設計提供了參考依據;六、在高頭、大流量條件下,豎井空腔段下部流速很高,盡管流螺旋運動引起的離心力可以確保井壁壓強保持正壓,但空化數依然較低,因此豎井的空化空蝕始終是工程界關注的重大問題。
  5. The main work is done with the help of model experiment. in the flood - relief experiment, the flood carrying capacity of spillway tunnel is checked. in the hydraulic experiment of the diversion power conduit system, the followings are studied : the flow condition and fluctuation in the surge chamber, the distribution of flow velocity before the rack in the surge shaft, the amplitude of stage in the quick gate bay etc. the test step, content and results of different proposals are introduced in details

    本項優化試驗研究的目的主要在於,通過泄系統整體力學試驗,校核泄洞的泄流能力;通過發電引系統整體力學試驗,研究調壓井內流流位波動情況、調壓井內攔污柵前流速分佈情況;確定快速閘門井內位波動幅度;試驗確定壓力管道擊壓力穿井系數以及泄洞弧門處的壓力。
  6. Many geological and hydrological factors of the river section, where the yellow river water intake engineering is laid out, such as the capacity of the reservoirs along the river section upstream and downstream, the rate of the flow discharge, the erosion and silt of the watercourse, the form of the riverbed and the water current, ice tuck, the convergence of the upstream branches of the river section, flood crest, sand crest size, the capacity for flood discharge of the watercourse, the effect of flood control structure around and the impacts on surrounding environment and the third person " s legitimate rights and interests, should be considered

    黃河取工程的布設要考慮工程所處河段的地質文等諸多因素。如該河段上下游庫的庫容,泄流量、河道沖刷、淤積、河床、冰塞、河段上游的支流匯入、峰、沙峰的大小、河道行能力的大小、周圍防工程的影響及對周圍環境和第三人合法權益的影響等等。
  7. The result of calculation shows that in that flood season of 1999, the flow of baini channel in networks was reciprocating flow for common ; it was in the extreme case of the storm surge, and affected by extreme velocity and topography, the flow in baini channel course and was rocking crookedly, this demonstrating the instability flow phenomena

    計算結果顯示,在99年季時,河網內白坭道流動為通常的往復流動;但在風暴潮極值狀下,由於受極值流速及地的影響,流動在白坭道中彎曲扭擺,呈現出流動不穩定現象。
  8. The experiment shows that compared with the surface protections of the conventional dyke projects, this new type of the surface protection has the merits of higher resistance to high shear tress ; better stability and permeability and has the advantages in improve the eco - environment and facilitate the construction concerned

    試驗表明:新型生工程護面連鎖塊與傳統堤防工程的護面式相比,具有抗高切應力、穩定、透性好、改善河道生環境等優點,而且施工方便快捷。
  9. Simulation of 3d terrain and the dynamic simulation of flood routing method

    流域三維地模擬及演進動模擬
  10. It also includes an important sample of varzea ecosystems, igapo forests, lakes and channels which take the form of a constantly evolving aquatic mosaic that is home to the largest array of electric fish in the world

    保護區內不僅有平坦耕地生系統、泛森林生系統,還有無數湖泊和河流,這些域以不同的式相互演變,為世界上最大的發電魚類種群提供了棲息地。
  11. Abstract : the scour process at the rear apron of shimen dam is studied through review of operation practice and inverse operation experiments. the cause of scour is explained, the scour pot was not stable after the occurence of extreme flood with the return period of 300 years, and the flood may deepen the scour pot even more severe

    文摘:通過長期實踐和反演試驗,研究了石門拱壩投運26年來壩后沖刷坑動發展的全過程,解釋了其成的主要原因,並指出重現期300年的特大發生后,石門沖坑並未穩定,小於它的仍舊造成了更深更危險的沖刷。
  12. The scour process at the rear apron of shimen dam is studied through review of operation practice and inverse operation experiments. the cause of scour is explained, the scour pot was not stable after the occurence of extreme flood with the return period of 300 years, and the flood may deepen the scour pot even more severe

    通過長期實踐和反演試驗,研究了石門拱壩投運26年來壩后沖刷坑動發展的全過程,解釋了其成的主要原因,並指出重現期300年的特大發生后,石門沖坑並未穩定,小於它的仍舊造成了更深更危險的沖刷。
  13. So a new method ? scale analysis method ( or called fractal analysis method ) is applied to study the flood of jialing river basin. the scaling hypotheses is applied to the relationship of annual maximum flood and drainage area. and basing on the scaling lognormal model with two parameters introduced by smith, a lognormal model with three parameters of flood is introduced to represent the scale effect of drainage area in annual flood peak distributions

    區域分析中一般採用指標法,但該法的基本假定與實際情況存在矛盾,因此本文採用一種新的分析方法? ?標度分析法(或稱為分分析法)來研究峰的區域變化,將標度不變性引入年最大峰流量? ?匯流面積關系中,並將其用於嘉陵江流域的,另外,本文在smith提出的具有標度性質的二參數對數正分佈模型基礎上創造性地提出了三參數對數正分佈模型來表徵年最大峰流量分佈中匯流面積的尺度影響。
  14. Impact of flood events from different source areas on channel transects adjustment at the wandering - braided reach of the lower yellow river

    不同來源區對黃河下游游蕩河段河床橫斷面調整過程的影響
  15. The project mainly solved the problems from the flood control, the morphological diversity of river profile and cross section, and the diversity of habitats in the river through the layout of shoreline and structures, the design of river profile and cross section, the design of riverbank protection, which is one effective engineering practice of eco - hydraulic engineering

    治理工程在岸線布置、沿河建(構)築物布置、河流縱橫斷面設計、岸坡防護設計等方面解決了防安全、河流縱向多樣性、斷面多樣性以及河流內棲息地多樣性等問題,是生工學理念的一次有效工程實踐。
  16. According to the initial conditions, the river level and flow condition have been simulated by two - dimensional mathematic model on the basis of measured data. in addition, with analysis of river channel evolution, the evaluation of the impact on flood control is ultimately made for the reference of policy - making

    根據邊界條件,結合實測地及全潮觀測資料,通過二維數學模型,模擬工程前後河段位、流,結合河道演變分析成果,綜合作出防影響評價,為決策部門提供參考性的依據。
分享友人