淤泥質河床 的英文怎麼說

中文拼音 [zhíchuáng]
淤泥質河床 英文
silt bed
  • : Ⅰ動詞1 (淤積) become silted up 2 (血液不流通) (of blood) stagnateⅡ名詞(淤積的泥沙) silt Ⅲ...
  • : 泥名詞1 (含水的半固體狀的土) mud; mire 2 (像泥的東西) any paste like matter; mashed vegetable...
  • : Ⅰ名詞1 (性質; 本質) nature; character; essence 2 (質量) quality 3 (物質) matter; substance;...
  • : 1 (天然的和人工的大水道) river 2 (指銀河系) the milky way system; the galaxy 3 (特指黃河) t...
  • : i 名1 (供人睡覺的傢具) bed; couch 2 (像床的器具、地面) something shaped like a bed Ⅱ量詞(用...
  • 淤泥 : sludge; ooze; slush; mire淤泥層 mud; 淤泥沉積 siltation; 淤泥沉積物 mud deposit
  • 河床 : riverbed; bed; poised river; [英方] waterstead; cauce
  1. Based on the topographic features and data of sediment particle size of bed load at the fluctuating backwater reach of liujiaxia reservoir, the streamwise variation and variation process of median diameter of bed load during silting and scouring periods of the fluctuating backwater reach are analyzed, and it can be seen that the turning point for the sediment diameter variation from coarse to fine is located at the outlet of shigou gorge of the fluctuating backwater reach

    摘要根據劉家峽水庫變動回水區的段地形特徵和歷年沙粒徑級配資料,分析了變動回水區積和沖刷時,沙中值粒徑的沿程變化和歷年沙中值粒徑變化過程,並指出粒徑分佈由粗變細的轉折點在變動回水區寺溝峽峽口處。
  2. The analyzed results are as follows : the late 1960 ' s cutoff of riverbends increased both the runoff amount and the sediment transport amount of the lower reach of jingjiang river, while the sediment deposition decreased in the lkngting lake area ; after the mid 1980 ' s, both the middle reach of yangtze river main stem and the dongting lake occurred a trend of decreasing annual sediment transport as a result of decreasing sediment releasing from the upper reach of yangtze river ; and in the recent 3 years ( 2003 - 2006 ), the three gorges reservoir first impoundment additionally reduced the sediment concentration in the middle reach of yangtze river flow with a long time, so a distance would be quite long for suspended sediment recovery, but the distance for bed - material load of suspended sediment recovery would be quite short

    分析結果表明: 20世紀60年代下荊江裁彎后,三口(松滋口、太平口、藕池口)分流分沙減少,下荊江徑流量和輸沙量相應增加,洞庭湖積減少; 80年代中期以後,長江中游幹流及洞庭湖出口的年輸沙量呈減少趨勢,城陵磯至武漢積轉為趨向沖平衡;三峽工程初期蓄水運用后,長江中游含沙量沿程恢復距離較長,但部分恢復距離相對較短。
  3. To help overcome this problem, the shing mun river improvement works were carried out between 2001 and 2005. the project improved the quality of the sediment in shing mun river, both by dredging out contaminated sediment and by applying a bioremediation method

    為解決氣味問題,政府於2001年至2005年間推行城門環境改善工程,挖掘上的污染沉積物及應用生化方法處理,改善沉積物素。
分享友人