混凝土襯砌層 的英文怎麼說

中文拼音 [húnníngchèncéng]
混凝土襯砌層 英文
concrete shield
  • : 混形容詞1. (渾濁) muddy; turbid2. (糊塗; 不明事理) foolish; stupid
  • : 動詞1. (凝結) congeal; curdle; coagulate 2. (注意力集中) fix
  • : Ⅰ動詞1 (在裏面托上一層) line; place sth underneath 2 (陪襯; 襯托) set off Ⅱ名詞(襯在裏面的附...
  • : 砌Ⅰ動詞(用磚、石等壘) build by laying bricks or stones Ⅱ名詞(臺階) step
  • : i 量詞1 (用於重疊、積累的東西 如樓層、階層、地層) storey; tier; stratum 2 (用於可以分項分步的...
  • 混凝土 : concrete; beton; jetereting混凝土壩 concrete dam; 混凝土板 concrete slab; 混凝土標號 concrete gra...
  1. Optimization design of tailrace surge chamber concrete lining layers for dachaoshan hydropower station

    大朝山水電站尾水調壓室優化設計
  2. Based on the construction of the testing section for the lining of jiping main canal in shandong province of south - to - north water transfer project, the main causes of the cracking from the mechanized lining concrete slabs are analyzed from the aspects of foundation treatment, bedding layer placement, quality of the raw materials for the concrete, placement of the concrete, cutting of the hardened concrete and the curing of the concrete, and then the relevant prevention and control measures are pertinently put forward

    摘要結合山東省南水北調濟平乾渠工程試驗段施工情況,著重從地基處理、墊料鋪設、原材料質量、澆築、成型割縫及養護幾個方面分析了機械化板裂縫產生的主要原因,並針對性地提出了預防及控制措施。
  3. The test obsvervation include air temperature, ground temperature, foundation moisture, freeze depth, freeze capicity, freeze residual capicity, groundwater table and shape transform of canal lining, etc. throught systemic observation, analysis of impact about each factor on fundation freeze capicity, evaluate effect on anti freeze of various canal lining, comparison on technology and ecnomic of different method, a kind of main canal lining format is been recommended to engineering practice with siutable to ningxia local feature, fufilling the need of main canal safey i application, economic and practical, that is using polystyrene plate laying under concrete slate and grit taking replace of filling layer and optimizing design

    試驗觀測內容包括氣溫、地溫、基含水量、凍深、凍脹量、凍脹剩餘量、地下水位和體外觀變化等項目。通過系統的觀測,分析各因素對基凍脹量的影響,評價各種型式的防凍西安理工大學工程碩士專業學位論文脹效果,並進行技術和經濟綜合分析比較,推薦出了適合我區特點、滿足乾渠安全運行、經濟實用、防凍脹效果好的乾渠防滲型式,即板下鋪設聚苯乙烯板和砂礫石換填結構型式,加以優化設計,用於工程實踐。
  4. The study lies in following aspects : 1 ) a great number of experiments on sfrc are carried out to obtain the basic data of sfrc energy properties, which are the fundamental parts of further study. 2 ) a probability analysis based on statistical theory is done to all the experiment data. in the end, energy criterion for sfrc associated with security criterion are calculated and listed for future use

    本文主要針對鋼纖維噴射在單隧道中的應用進行了研究,內容包括以下幾個方面: 1 )進行了大量的鋼纖維標準試件試驗,試驗的成果和數據為研究鋼纖維的能量特徵提供了事實依據和參考; 2 )運用概率統計方法對鋼纖維的指標進行了可靠性分析,得出了實際可以接受的保證率下的鋼纖維能量指標; 3 )通過合理的假設和簡化,研究了鋼纖維構件在破壞過程中的能量耗散機理。
  5. Abstract : a brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    文摘:介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期石圍堰基礎處理與施工技術;大江截流上下游石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩澆築方案及主要施工機械選型;的原材料和耐久性優化試驗研究;大壩基礎深抗滑穩定研究;三峽電站進水口型式研究;鋼鋼筋引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、墻的結構與支護研究;特大型水輪發電機組的科學研究。
  6. A brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期石圍堰基礎處理與施工技術;大江截流上下游石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩澆築方案及主要施工機械選型;的原材料和耐久性優化試驗研究;大壩基礎深抗滑穩定研究;三峽電站進水口型式研究;鋼鋼筋引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、墻的結構與支護研究;特大型水輪發電機組的科學研究。
  7. Combined with the full scale models tested in - situ of prestressed concrete penstock with double circle unbonded strands and single circle bonded strands of xiaolangdi multipurpose dam project of yellow river, the advantages and disadvantages of two different prestressed systems are analyzed, the concrete stress distributions of the prestressed concrete penstock are induced and summarized during the whole tensioning strands stage. the consistence among the test results, the theory calculating and the three dimensional finite element analysis is proved. therefore, the theoretical method of prestressed concrete penstock is feasible

    結合黃河小浪底水利樞紐工程在施工現場進行的採用雙雙圈環形無粘結預應力鋼絞線和單圈有粘結預應力鋼絞線對排沙洞施加預應力的1 : 1模型試驗,對比分析了兩種后張預應力施工體系的優劣,歸納總結了預應力筋束張拉過程中預應力壓力管道結構管壁的內力分佈規律,驗證了模型試驗實測數據、理論計算和三維有限元分析結果的一致性,確定了預應力壓力管道理論計算方法的可行性。
  8. The waterproof layer and partial structures of composite linings were simulated by single and double shell concrete test slabs, and the seepage water pressure was applied to the slabs with the manual pump

    通過單、雙試驗板對防水及隧道的局部結構進行了模擬,並通過手動泵進行滲漏水壓加載。
  9. The paper deals mainly about the application of sfrc in permanent shotcrete linings in tunnel construction

    而在這種單施工中用鋼纖維取代普通有一定的實際意義。
  10. The durability for concrete lining structure of highway - tunnel and the thickness of concrete cover

    公路隧道結構的耐久性與保護厚度
分享友人