混凝土設備 的英文怎麼說

中文拼音 [húnníngshèbèi]
混凝土設備 英文
concrete equipment
  • : 混形容詞1. (渾濁) muddy; turbid2. (糊塗; 不明事理) foolish; stupid
  • : 動詞1. (凝結) congeal; curdle; coagulate 2. (注意力集中) fix
  • : Ⅰ動詞1 (設立; 布置) set up; establish; found 2 (籌劃) work out : 設計陷害 plot a frame up; fr...
  • : Ⅰ動詞1 (具備; 具有) have; be equipped with 2 (準備) prepare; provide with; get ready 3 (防備...
  • 混凝土 : concrete; beton; jetereting混凝土壩 concrete dam; 混凝土板 concrete slab; 混凝土標號 concrete gra...
  • 設備 : equipment; device; facility; implementor; apparatus; installation; appointment; furnishing; setou...
  1. On the basis of investigations into the progressive yield process and the possible failure modes of rcc gravity dams, the quasi - elasticity design limit state of the ctrtical stability criterion is proposed and the real working state of the dams designed according to the ctriterion is discussed. a check formula using the material strength reducing factor as the safety index and a simplified formula similar to against sliding stability fromula are derived. finally, the corresponding design safety factors are given by using fem calculations with various influence parameters to be taken into account

    本文在研究碾壓重力壩漸進破壞過程和可能失穩方式的基礎上,提出了以準彈性臨界作為穩定臨界準則的計極限狀態,分析了按該準則計的大壩的實際工作狀態,導出了以準彈性強度儲系數為計安全指標的審查公式以及形式與抗剪斷公式相同的簡化公式,探討了定量計算考慮各種因素影響的相應計安全系數的合理取值,並與現行規范方法進行了比較
  2. To comply with monitor and inspection of the quarterly, half yearly, and yearly inspection and remedy of rooftop, roof space, deck, ground, basement, down pipe, sanitary pipe, air vent, cement & concrete, structural, foundation, beams, ironmongery and all related

    對屋頂,地板,地下室,下水道,排水管,排氣口,水泥和,地基等相關的結構進行每季度,每半年,每年的檢查和修理。
  3. According to the multi - areas development strategy, the corporation has expanded its business to engineering and construction of all kinds of civil works, municipal and public works, marine works, dredging and reclamation works as well as manufacture and installation of hydraulic steelworks and electro - mechanical equipment, with the major annual capacity of 150 million m3 in earth and rock works, 15 million m3 in concrete production and placement, 10, 000 mw in installation of generating units, and 150, 000 tons in manufacture and erection of hydraulic steelworks

    根據多元化發展戰略,集團公司的業務范圍除水電工程總承包外,還將業務擴展到各類木工程、市政工程、海事工程的計、施工、機械和金屬結構製造安裝等,核心競爭力進一步得到擴展和增強,形成了年完成石方開挖15000萬立方米、澆注1500萬立方米、發電機組安裝1000萬千瓦、鋼結構製作安裝15萬噸的綜合施工能力。
  4. Fixed railway installations. equipment for overhead telecommunication and signalling lines. reinforced concrete socles

    鐵路固定.通信和信號線路架空線用.鋼筋製管座
  5. Each automatic weather station comprises two masts of about 5m and 10m high respectively and concrete plinths for setting up the masts, equipments and ductwork, with an area of about 10m x 10m

    每個自動氣象站面積約十米乘十米,有兩支分別約五米高和十米高的桅桿和基座以裝桅桿、和纜槽。
  6. Fixed railway installations. equipment for overhead telecommunication and signalling lines. plate for securing cross - pieces to reinforced concrete posts

    鐵路固定.通訊和信號裝置架空線路用器材.鋼筋電桿上橫梁固定用板
  7. At present plenty of experimental study has been made on the materials and structural performance of asphalt concrete cores in the world, and the design methods and construction technique as well as equipments have been more mature. however, there is still lack of the research of its basic performance. in this thesis, in combination with the actual project, the experimental study has been employed with the field core specimen and the specimen made in laboratory, mainly include the static triaxial test, confinement pressure stabilization test and stress relaxation test

    目前,國內外對瀝青心墻的材料和結構性能已進行了一些試驗研究,其計方法、施工工藝和較為成熟,但其基本性能研究方面顯得較為薄弱,本文結合實際工程對瀝青心墻的芯樣和試驗室成型的試件進行了試驗研究,主要包括靜三軸試驗、圍壓穩定試驗以及應力鬆弛試驗研究,得到以下基本結論: 1
  8. This paper unfolds engineering disposition and theoretical research of negative temperature high performance concrete ( nthpc ) with the damage of many factors motivation, the project background based on qing - zang railway engineering, which is one of four - emphasized engineering during the tenth five - plan. due to the difference of environment of construction and service between nthpc and ordinary concrete, and therefore durability of nthpc is required to higher level. at a first, nthpc must avoid frozen damage at early age and possess anti - freezing property at later period, in order to meet engineering practicable application need, and this are two emphasized and difficult problems, as for nthpc ; by means of mechanism analysis about deicing - agent ingredient and anti - freezing at early period, adopting composite technique routine of mineral addition + anti - freezing element + water - reducer4 - air - entraining + anti - erosion of steel component etc, based on orthogonal experimental approach, fd - 1 composite functional admixtu re was manufactured, which has more property and orientation on qing - zang railway

    負溫由於和普通在施工環境及服役環境上存在的差異,因此表現為比普通更為較高的耐久性要求;負溫首先要避免早期的凍害以及具長期抗凍性能,才能夠滿足工程實際應用的要求,這也是負溫必須解決的兩大技術關鍵;通過對目前常用防凍劑組分作用機理的分析研究及早期防凍機理探討,採用礦物外加劑+防凍組分+高效減水劑+引氣+阻銹組分功能復合的技術路線,通過正交試驗計復配了適應青藏鐵路工程要求的專用多功能復合型外加劑fd - 1 ;並在此基礎上配製不同等級負溫高性能,開展一系列包括硫酸鹽侵蝕、氯離子滲透、抗凍融循環、收縮及耐磨性等耐久性能研究;通過對fd - 1組分和摻量的調整,優化負溫在施工特性、力學指標和耐久性三個方面的兼容、協調性。
  9. This paper introduces the development and present situation of concrete - filled steel tube arch bridge in the world ; generally analysis the mechanism, construction technology, construction equipment of the job practice ; advance the entire scheme of the long - span concrete - filled steel tube arch rib construction ; at last give the analysis the concrete scheme of the concrete - filled arch rib construction. this paper declares the reference value of the study through the above

    本文介紹了國內外大跨度鋼管拱橋主拱肋施工的發展和現狀;綜合分析了拱橋施工的機理、技術和情況;提出了大跨度拱橋主拱肋施工的完整解決方案,最後通過具體橋梁施工方案的計分析,說明了本項研究成果的現實參考價值。
  10. This research was also supposed to provide a valuable reference for the construction of 500kv eastern hangzhou transformer substation project. to guarantee the rationality of the torsion and bending load application, a set of experimental equipments was transformed from a traditional one by exerting tangential force on the brim of the fan board and conducting broad - billed roller application. in the actually fulfilled experiments on the capabilities of the members under different ratios of torsion and bending, the equipments proved to be well qualified in load applying to large - tonnage members

    試驗中,為保證扭轉及彎矩荷載施加的合理性,在浙江大學工程結構試驗室原有的加載的基礎上,分別採用在扇形板邊緣施加切向力和寬軸承滾軸加載的方法,改造並調試出一套可專門用於大噸位構件施加扭轉荷載及組合作用的試驗,並利用這套進行了離心鋼管構件在不同彎扭比的組合作用下的試驗研究。
  11. Reconstruction of fuel oil supply system of acp3000 asphalt concrete mixing equipment

    3000型瀝青拌和燃油供給系統改造
  12. The riveting and welding plant of the company has a very strong technical force, the technical personnel makes up more than 1 3 of the total staff, the company can also undertake the manufacture of various metallurgical structural equipment, formwork, gang board, oil tank, water tank, pipeline and dust - collecting and environmental protection equipment of various sizes, the company also undertakes the construction of bridge, concrete building as well as underwater and high - altitude operations from omniberaing etc. no matter what sizes and shapes of the forging and casting spare parts including special - shaped parts, we will never refuse you and promise to satisfy you with best quality and finish the task on schedule

    公司鉚焊廠,技術力量十分雄厚,工程技術人員,佔全體員工的三分之一以上,可以承攬加工各種金屬結構模板跳板油罐水罐管道工程各種型號除塵環保,再如橋梁鋼筋建築,水下高空全方位作業等,除些之外,關于鑄造鍛造等工作不論大,中,小型部件,也能做到來而不拒,保證,保質,保量按期完成任務。
  13. Building construction machinery and equipment - internal vibrators for concrete

    房屋建築機械和.用內部振搗器
  14. Building construction machinery and equipment - external vibrators for concrete

    房屋建築機械和.用外部振搗器
  15. Building site equipment. wallforms for concrete

    建築施工現場.作業模板
  16. Used to concrete seam and arbitrarily shape seam in component. in the condition of the expanding being favorable limited, attain satisfied stop - water effect and manage the concrete interstitial leaking. at the same time, it can be also used to shipping and engine etcindustrial equipment

    適用於現場澆注的施工縫和嵌入構件任意形狀的接縫內,在其膨脹受到良好限制的條件下達到滿意的止水效果,治理裂縫的漏水,同時也用於船舶、機車等工業的防水密封。
  17. Testing fresh concrete set

    試驗新澆混凝土設備
  18. In the paper based on the study of mechanical property, durability, microstructure, engineering applying and theory of designation of hplc, the relation among the composition, structure and performance of iiplc, which is an essential theoretical base of hplc, is discovered. the main research work and compliments of this paper are : the concept on hplc is newly described from the aspect of development strategy, economic, demanding of technology of material. based on the analysis of the destroy theory and the research of property of the composition and structure of hplc, the ideology of designation of hplc, and the theory of interface strengthening and strength suiting are built ; the new method of designation of hplc which is based on the condition that the mixture has a high stability is invented ; a math modal is built to direct the designation of hplc

    本文進行的主要工作和取得的重要成果有:從材料發展戰略、經濟性和技術要求角度,把高性能輕集料計水平分為三個層次進行評價,在此基礎之上提出了高性能輕集料計理念,用以指導計、制該類材料;在計理念的指導下,結合對輕集料破壞機理的分析,提出了界面增強理論、強度匹配理論兩個主要的高性能輕集料計理論;創立了基於拌和物穩定性控制的高性能輕集料計新方法;建立了指導高性能輕集料計的數學模型。
  19. The development of concrete market and the technical improvement of concrete equipment

    商品市場發展與混凝土設備的技術進步
  20. The paper designs a set of technics flow of producing recycled aggregates and uses scrap concrete in wuchang vehicle factory to manufacture some recycled aggregates, and researches the basic properties of recycled aggregates such as apparent density, absorption, crush index, compacted density, porosity, etc. and analyses the properties change of recycled aggregates after the respective surface treatment with the polymer and polysilicone waterproofing agents, and then obtains the result that their absorption decreases and their properties improves after recycled aggregates are surface treated

    本文計了一套生產再生骨料的處理工藝流程,並利用武昌車輛廠的廢棄了一定量的再生骨料。對再生骨料的表觀密度、吸水率、壓碎指標、容重和孔隙率等基本性能進行了研究,分析了分別採用聚合物和有機硅防水劑進行表面處理后的再生骨料的性能變化。從而得出經過表面處理后再生骨料的吸水率有所降低,性能有所改善。
分享友人